Ремонт техники Специалисты Строительство и ремонт Другое Страны

Manifold installation master in Tashkent

Installation of manifolds Tashkent

Visit and diagnostics free of charge, 2-year warranty, balancing of circuits without rework — we assemble the unit in a single visit.

Installation in 1 day
12 years of experience
850+ units
Examples of work — manifold installation
Bekzod Umarov
Locksmith
4.9
Types of services

Our manifold installation services in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Manifold installation — from 299,000 sum
Installation of the distribution unit on a wall or in a manifold cabinet with leveling and mounting on brackets
Дверная москитная сетка
Manifold replacement
Dismantling of the old distributor and installation of a new one in its place while preserving the circuit connection scheme
Сетка Плиссе
Manifold piping — from 329,000 sum
Assembly of the unit with connection of supply and return lines, installation of fittings and shut-off valves
Антикошка PetScreen
Manifold connection — from 339,000 sum
Connecting the distributor to the heating mains with sealing of threaded connections
Антипыль Micro Mesh
Installation of the manifold unit
Turnkey assembly of the manifold unit complete with flow meters, valves and air vents
Нестандартная москитная сетка
Connection to the boiler
Cutting the distributor into the boiler circuit with installation of adapters and checking circulation
Раздвижная москитная сетка
Balancing of circuits
Adjustment of flow meters and thermostatic heads for uniform heating of all circuits
Магнитная рамка
System flushing
Flushing of circuits and manifold from scale and sludge with restoration of flow capacity
Сетка-штора на магнитах
Pressure testing of the unit
Pressure testing of the unit under pressure to check the tightness of all connections
Pricing

Prices for manifold installation in Tashkent

Service type Description Price Warranty
Manifold installation Single-level, standard installation от 299 000 сум 2 years
Manifold installation Two-level, standard installation от 349 000 сум 2 years
Manifold installation Three-level, standard installation от 399 000 сум 2 years
Manifold installation Four-level, standard installation от 449 000 сум 2 years
Manifold installation Five-level, standard installation от 499 000 сум 2 years
Manifold installation Hidden installation in a manifold cabinet от 549 000 сум 2 years
Manifold installation Open wall installation от 319 000 сум 2 years
Manifold installation Installation in a niche, base preparation от 599 000 сум 2 years
Manifold installation Mounting on brackets, leveling от 379 000 сум 2 years
Manifold installation Mounting on a rack, fastening от 419 000 сум 2 years
Manifold connection To the heating system, standard от 339 000 сум 2 years
Manifold connection To the water supply system, standard от 359 000 сум 2 years
Manifold connection To the boiler, piping от 649 000 сум 2 years
Manifold connection To the pump group, piping от 699 000 сум 2 years
Manifold connection To the boiler, piping от 679 000 сум 2 years
Manifold piping With pipes, standard scheme от 479 000 сум 2 years
Manifold piping With flexible hoses, standard от 329 000 сум 2 years
Manifold piping Metal pipes, soldering от 749 000 сум 2 years
Manifold piping Polypropylene pipes, soldering от 519 000 сум 2 years
Manifold piping Cross-linked polyethylene, press fittings от 579 000 сум 2 years
Installation of ball valves On supply and return от 309 000 сум 2 years
Installation of balancing valves Flow rate adjustment от 459 000 сум 2 years
Installation of thermostatic valves Temperature adjustment от 469 000 сум 2 years
Installation of flow meters Flow rate setting by circuits от 539 000 сум 2 years
Installation of air vents Automatic, installation от 369 000 сум 2 years
Installation of drain valves System drainage от 355 000 сум 2 years
Installation of pressure gauges Pressure control от 289 000 сум 2 years
Installation of thermometers Temperature control от 279 000 сум 2 years
Installation of safety valves System protection от 389 000 сум 2 years
Installation of pressure reducers Pressure stabilization от 489 000 сум 2 years
Radiator connection To the manifold, one circuit от 429 000 сум 2 years
Underfloor heating connection To the manifold, one circuit от 439 000 сум 2 years
Towel dryer connection To the manifold, one circuit от 409 000 сум 2 years
Fan coil unit connection To the manifold, one circuit от 619 000 сум 2 years
Connection of an indirect heating boiler To the manifold, piping от 719 000 сум 2 years
Installation of the heating circuit Pipe distribution, one circuit от 799 000 сум 2 years
Installation of underfloor heating circuit Pipe distribution, one circuit от 849 000 сум 2 years
Balancing of circuits Flow meter adjustment от 559 000 сум 2 years
System commissioning Startup and verification от 899 000 сум 2 years
System pressure testing Leak test от 509 000 сум 2 years
System flushing Before start-up, standard от 299 000 сум 2 years
Pump group adjustment Mode adjustment от 449 000 сум 2 years
Thermostat adjustment Calibration от 349 000 сум 2 years
Dismantling of the old manifold Removal, standard от 399 000 сум 2 years
Manifold replacement Dismantling and installation of new от 849 000 сум 2 years
Replacement of shut-off valves On the manifold, complete set от 549 000 сум 2 years
Replacement of the pump group Dismantling and installation от 899 000 сум 2 years
Manifold relocation To a new location, standard от 699 000 сум 2 years
Wall chasing for pipes Supply line to the manifold от 599 000 сум 2 years
Installation of the manifold cabinet Installation and fastening от 499 000 сум 2 years
Pipe thermal insulation Wrapping, standard от 255 000 сум 2 years
Waterproofing of the unit Base treatment от 319 000 сум 2 years
Manifold assembly Equipment and assembly от 649 000 сум 2 years
Base preparation Leveling for installation от 379 000 сум 2 years
Why Us

Our advantages in manifold installation

Installation in 1 day

A team of 4 installers assembles and connects the manifold in 1 shift; boiler downtime does not exceed 8 hours.

12 years of experience

Specialization only in manifolds and collectors: over 850 units in Tashkent, repeat calls for installation less than 2%.

850+ units

850+ distribution units installed, of which 640+ at Tashkent sites, defect rate for pressure testing — 0.4%.

Visit within 2 h

The engineer arrives at the site in Tashkent within 2 hours after the request; diagnostics and measurements take up to 40 minutes.

2-year warranty

2-year warranty on installation and pressure testing of the unit; during this period, maintenance and tightening of connections are performed free of charge.

15% discount

A 15% discount applies when ordering manifold installation together with balancing setup in one visit.

Setup in 30 min

Balancing of circuits takes 30 minutes; afterwards, the temperature difference between branches does not exceed 2 degrees.

Selection for the system

The engineer calculates the number of outlets and flow rate based on 3 parameters: area, heat losses, boiler type — selection error less than 1%.

Process

Order stages

01

Request and consultation

We accept the request, clarify the task and specifics of the site. We agree on a convenient time for the specialist's visit.

02

Diagnostics and measurements

The engineer inspects the installation site, checks the system parameters and takes precise measurements. We record all nuances.

03

Selection and calculation

We select a manifold for your system and prepare a connection diagram. The cost is calculated after diagnostics.

04

Installation of equipment

We install the manifold, connect the circuits, check the tightness of connections. We perform the work carefully and according to technology.

05

Commissioning and verification

We start the system, balance the circuits, check the pressure and operation of all units. We make sure of stable operation.

06

Handover and warranty

We show the result and give operating recommendations. Installation is covered by a 2-year warranty.

Team

Our manifold installation specialists

Смирнов Алексей Викторович

Smirnov Aleksey Viktorovich

Acrylic bathtub installer

6 years of experience
205 reviews 4.7
Абдуллаев Шухрат Бахтиёрович

Abdullayev Shukhrat Bakhtiyorovich

Waterproofing specialist

6 years of experience
101 reviews 5.0
Каримова Нилуфар Абдурашидовна

Karimova Nilufar Abdurashidovna

Service center administrator

8 years of experience
107 reviews 4.8
Кузнецов Дмитрий Сергеевич

Kuznetsov Dmitriy Sergeyevich

Hydromassage installation master

18 years of experience
69 reviews 5.0
Юлдашев Фаррух Отабекович

Yuldashev Farrukh Otabekovich

Composite bathtub technologist

6 years of experience
188 reviews 4.8
Рахимова Зулфия Шавкатовна

Rakhimova Zulfiya Shavkatovna

Field work coordinator

7 years of experience
196 reviews 4.9
Мирзаев Санжар Алишерович

Mirzayev Sanzhar Alisherovich

Siphon connection specialist

6 years of experience
72 reviews 5.0
Тошматов Бекзод Улугбекович

Toshmatov Bekzod Ulugbekovich

Customer relations manager

16 years of experience
77 reviews 4.9
Cases

Manifold installation cases

Установка рамочной сетки
Manifold installation in a private house
299,000 sum
2 year warranty
Problem
After installing the new manifold, the heating system worked unevenly, some radiators remained cold.
Diagnostics
Incorrect manifold connection, lack of balancing and air locks in the circuits.
Solution
Manifold installation completed, balancing and removal of air locks performed.
Смирнов Алексей Викторович
Smirnov Aleksey Viktorovich
Acrylic bathtub installer
4.9
Установка дверной сетки
Installation of a manifold in a new building
349,000 sum
2 year warranty
Problem
The developer installed the manifold, but it was not connected to the heating system.
Diagnostics
Lack of connection to the risers and incorrect installation of the manifold.
Solution
The manifold was installed with connection to the heating system.
Абдуллаев Шухрат Бахтиёрович
Abdullaev Shukhrat Bakhtiyorovich
Waterproofing specialist
4.8
Установка сетки Антикошка
Installation of a manifold from scratch
399,000 sum
2 year warranty
Problem
The house had no manifold, which led to uneven heat distribution.
Diagnostics
The need to install a manifold for even distribution of the heat carrier.
Solution
The manifold was installed from scratch with the installation of all necessary elements.
Каримова Нилуфар Абдурашидовна
Karimova Nilufar Abdurashidovna
Service center administrator
4.9
Нестандартная сетка
Installation of a manifold in a two-story house
449,000 sum
2 year warranty
Problem
On the second floor the radiators did not heat up due to incorrect installation of the manifold.
Diagnostics
Incorrect installation of the manifold, insufficient pressure on the second floor.
Solution
The manifold was installed taking into account the two floors and with balancing.
Кузнецов Дмитрий Сергеевич
Kuznetsov Dmitry Sergeevich
Hydromassage installation master
4.7
Раздвижные сетки
Installation of a manifold with a pump
499,000 sum
2 year warranty
Problem
Insufficient circulation of the heat carrier in the heating system.
Diagnostics
Absence of a circulation pump, incorrect installation of the manifold.
Solution
The manifold was installed with the installation of a circulation pump.
Юлдашев Фаррух Отабекович
Yuldashev Farrukh Otabekovich
Composite bathtub technologist
5.0
Сетка Антипыль
Installation of a manifold with a hydraulic separator
549,000 sum
2 year warranty
Problem
Overheating of the boiler and uneven heating of the radiators.
Diagnostics
Absence of hydraulic decoupling, incorrect installation of the manifold.
Solution
The manifold was installed with a hydraulic separator to balance the system.
Рахимова Зулфия Шавкатовна
Rakhimova Zulfiya Shavkatovna
Coordinator of on-site works
4.9
Перетяжка полотна
Installation of a manifold in an apartment
319,000 sum
2 year warranty
Problem
After replacing the radiators in the apartment, the heating system worked unstably.
Diagnostics
Incorrect distribution of flows, absence of a manifold.
Solution
The manifold was installed with connection to the existing system.
Смирнов Алексей Викторович
Smirnov Aleksey Viktorovich
Acrylic bathtub installer
4.8
Сетка Плиссе
Installation of a manifold with thermostats
599,000 sum
2 year warranty
Problem
Inability to regulate the temperature in individual rooms.
Diagnostics
Absence of thermostats on the manifold, incorrect installation.
Solution
The manifold was installed with the installation of thermostats.
Абдуллаев Шухрат Бахтиёрович
Abdullaev Shukhrat Bakhtiyorovich
Waterproofing specialist
5.0
Compatibility

We work with brands from any manufacturers

Professional manifold installation for all popular brands

Manifold installation in Tashkent from Eco-Service: manifold units for heating, water supply and underfloor heating

What a manifold is and what tasks it solves in the system

The manifold distributes the heat carrier or water across the circuits, equalizes pressure between the branches and simplifies system maintenance. Below we break down what the manifold assembly consists of and what tasks it handles.

Design of the manifold assembly: what the manifold consists of

A manifold assembly is a supply and return manifold connected to the circuits via fittings, with flow meters, balancing valves and an air vent. The body is assembled from brass or stainless steel, and the outlets are distributed via a euroconus or press fitting for pipes of 16, 20 and 26 mm. Flow meters are installed on the supply — the bulb shows liters per minute on each circuit, while the balancing valves on the return set the design flow rate. The automatic air vent is brought out to the top point of the manifold, and the drain valve to the bottom, so the system can be drained before the season. When assembling units with 8 or more outlets, the body is mounted on a bracket in the manifold cabinet — otherwise the weight of the filled loops deforms the structure. If the manifold has no air vent, after the first season the underfloor heating circuits become airlocked — heating becomes uneven, and a technician will have to be called again.

How a manifold differs from tee distribution

A manifold provides independent regulation of each circuit, while tee distribution does not: when the flow rate changes in one branch, the entire system readjusts. With tees, water follows the path of least resistance — the nearest radiator receives more heat carrier, the farthest is underheated, and the temperature difference between the first and last appliance reaches 8-10 °C. The manifold assembly solves this with flow meters: each loop is adjusted separately for its heat losses, and the balancing valves lock in the flow rate. Maintainability is also higher — one branch can be shut off without stopping the others. On sites with 4+ circuits, tee distribution almost always leads to uneven heating — the manifold pays for itself already in the first heating season.

For which systems manifolds are installed in Tashkent

  • Heating manifold: distributes the heat carrier to the radiators, works with supply from a central riser or boiler, and is equipped with shut-off valves and an air vent.
  • Water supply manifold: distributes cold and hot water to bathrooms and water draw-off points; for the hot line, a body with heat-resistant seals and thermal expansion compensators is used.
  • Underfloor heating manifold: supplies the heat carrier to the loops through a pump-and-mixing unit, with flow meters and servomotors for room-by-room regulation.

We assemble manifolds for all three systems at sites in Tashkent. For underfloor heating, a pump-and-mixing unit is mandatory: without it, the supply temperature in the circuits is higher than permissible for the pipes, and the screed cracks.

Installation of a heating manifold: selection and installation for radiator distribution

The heating manifold is selected according to the number of radiators and the type of riser. We explain how we calculate the outlets, what diameter is needed for a panel building, and what materials we use for the unit.

How to select the number of manifold outlets

We calculate the outlets based on the number of radiators plus one reserve: for a typical three-room apartment in Tashkent this is 5-6 outlets, for a private house — 8-12. At sites in the Mirzo-Ulugbek and Yunusabad districts, schemes with 6 and 8 circuits are most common — for bedrooms, kitchen, living room and bathroom with a towel warmer. If underfloor heating is included in the project on the ground floor, a separate group is added to the radiator circuits through a mixing unit. Our specialists select the number of manifold outlets for the site after measuring the area and calculating heat losses for each room. A reserve outlet is cheaper to add right away during installation than to replace the entire manifold later: manifolds are not extended in sections, they are replaced entirely, and along with it the entire distribution is redone.

Manifold diameter for the riser of a panel building

For panel buildings in Tashkent, we most often install 1″ or 1¼″ manifolds at the inlet — this is enough for 6-8 radiators without pressure drop on the far circuits. In series with bottom distribution and a narrowed ¾″ riser, the transition to a 1″ manifold is made through a nipple, otherwise the throughput will not be enough for the last room. At sites in Chilanzar and Sergeli, where risers were replaced during major repairs, 32 mm inlets are found — for these, a manifold with a 1¼″ inlet and ½″ outlets is used. An undersized diameter does not show up immediately, but in winter: the far radiator heats weaker, and owners blame it on a "bad riser," although the cause is the narrow cross-section of the manifold, which does not pass the design flow rate of the coolant. Eco-Service specialists select the manifold diameter for the riser of a panel building after checking the actual inlet passage and the number of circuits.

Brass or stainless steel: what we install and why

Material Where we use it Feature
Brass Apartments, 4-8 circuits Threaded outlets, repairable
Stainless steel Private houses, 8-12 circuits Withstands pressure up to 10 bar
Polypropylene Water supply Warps under temperature fluctuations in heating
Combined unit Reconstruction Brass manifold on a steel bracket

Brass and stainless steel manifolds cover almost all heating demand: brass is chosen for apartments on a moderate budget, stainless steel — for private houses and high-pressure systems. Polypropylene manifolds are cheaper, but in heating they warp under temperature fluctuations — threaded connections start to leak as early as the second season, and the unit has to be redone. When selecting, look not only at the body material, but also at the type of outlets: euroconus requires one type of fittings, threaded radiator plugs require another, and adapters between them eat up space in the cabinet.

Stages of heating manifold installation

Our heating manifold installation proceeds in five stages: marking and mounting the manifold, connecting to the riser, distributing the circuits, piping with automation, pressure testing. First we level the unit in the cabinet or niche and mount it on brackets with a gap for servicing. Then we tap into the riser through ball valves and a filter, install a bypass so the system works when the manifold is shut off. We run the distribution to the radiators, with a shut-off valve and a balancing valve at each outlet. Then the automation piping: thermostatic heads, flow meters, and if necessary — a pump mixing unit. Pressure testing is not a formality: we keep the system under pressure until acceptance, because opening up connections hidden in the wall after finishing is many times more expensive. Installation of the manifold at Eco-Service sites ends with recording the pressure test result in a report.

What is included in manifold installation for radiator distribution

Work on a radiator system includes mounting the manifold, tapping into the riser, distributing across circuits, piping with valves and fittings, and pressure-testing the unit before acceptance. Fasteners are selected to match the wall material: in Tashkent's panel buildings these are anchor studs, in brick buildings they are nail dowels anchored into the masonry. Tapping into the riser requires shutting down the riser according to the management company's schedule, so the work is planned for the non-heating season. Distribution is done with 16 or 20 mm pipe — metal-plastic and cross-linked polyethylene require different fittings, and adapters eat up space in the cabinet. The piping includes ball valves, a filter, balancing valves and, if necessary, a pump-and-mixing unit. Before acceptance, the unit is held under test pressure — connections hidden in the wall are more expensive to open up after the finish work than to check right away.

Installation of a water supply manifold: distributing cold and hot water to points

A water supply manifold distributes cold and hot water to bathrooms and water draw-off points without tees in the walls. Let's break down how we plan the distribution, where we place the manifold unit and how we connect it to the riser.

How distribution to bathrooms and points is planned

We run water from the manifold in a separate line to each point — mixer, toilet, washing machine, boiler — without tees in the wall, so that pressure does not drop when several are opened at once. In a typical apartment with two bathrooms, this comes to 8-12 lines: 4-6 each for cold and hot water, each on its own manifold outlet. We make connections with euroconus fittings or press fittings: the euroconus is more convenient for later repair of the faucet, the press fitting is more reliable in a hidden chase under tiles. We run the cold and hot water routes in parallel with a gap of at least 20 mm, so that the hot pipe does not heat the cold one and there are no temperature fluctuations at the mixer. A separate line to each point eliminates the "cold shower effect": when water is turned on in the kitchen, the pressure in the bathroom does not drop.

Where to place the manifold cabinet

We place the manifold cabinet in a niche or bathroom with access for maintenance: concealed installation is acceptable, but the hatch must open without dismantling the tiles. In new buildings, a niche of 600×400×120 mm in the bathroom or hallway at the entrance to the bathroom is most often used for the water supply manifold — this is enough for a cold and hot water manifold with shut-off valves and pressure reducers. If there is no niche, we move the cabinet into a walk-in closet or into the kitchen under the sink, but not into a solid wall and not behind a stretch ceiling. We install a manifold cabinet for concealed installation with an inspection hatch on magnets or a concealed hinge. A cabinet in a solid wall without inspection access is a typical mistake: at the first leak you have to open up the finish to get to the valves.

Connecting the water supply manifold to the riser

We connect the water supply manifold to the riser through ball valves and filters at the inlet — this makes it possible to shut off the manifold for maintenance without draining the entire system. We make the tap on a threaded connection or through a press tee, depending on the pipe material: panel buildings mostly have steel, new ones have polypropylene or cross-linked polyethylene. At the cold and hot water inlets we install main coarse filters of 100 microns and a pressure reducer if the pressure in the riser is above 4 bar. We assemble the piping with detachable connections — when replacing a cartridge or faucet you won't have to cut the pipe. For installing a water supply manifold, the price is made up of the number of points, the pipe material and the tapping scheme; a filter before the manifold extends the life of mixer cartridges, because without it sand from the city water clogs the aerators within a couple of months.

Assembling a Underfloor Heating Manifold: Flow Meters, Mixing Unit, Balancing

The underfloor heating manifold is the most complex unit in the system: flow meters, the mixing unit and proper balancing of the loops are essential here. Let's go through each element in order.

Why a Pump and Mixing Unit Is Needed

The pump and mixing unit mixes return water into the supply to keep a safe temperature in the underfloor heating loops — without it, the screed and pipes operate at their limit. The unit is assembled on a three-way valve with a thermostatic head, a circulation pump and a bypass: the pump circulates the heat carrier through the loops, the valve doses hot water from the boiler, and the return from the floor goes back into the circuit. For the loops, the supply is kept in the range of 35-45 °C, while 70-80 °C comes from the boiler — the difference is precisely what the mixing removes. Through Eco-Service, a pump and mixing unit is assembled for a specific area: for 60-80 m² a unit with a 25/6 pump is installed, for 120-150 m² — a 25/7 with higher flow. The supply temperature in the loops is selected according to the type of flooring: higher under tiles, lower under laminate, otherwise the flooring deforms.

Flow Meters and Loop Balancing

We install flow meters on each loop and balance them according to actual flow: we throttle short loops and open long ones — then the floor heats evenly across the entire area. A flow meter is a glass tube with a 0.5-4 l/min scale and a float: it shows the actual flow of heat carrier in each loop, not the calculated one. Balancing is needed because loops have different lengths: a 40 m loop and a 90 m loop receive different flow at the same valve opening, and the short loop consumes most of the heat. Eco-Service installs flow meters on underfloor heating loops and adjusts them after the system is started up, when the heat carrier is already warmed. Without balancing, the shortest loop takes most of the heat carrier, and the far room stays cold — and the owner turns the thermostat to maximum, overheating the rest.

Servo Drives and Thermostatic Valve: Loop Automation

  • Thermostatic valve: installed on the supply manifold and keeps the heat carrier temperature in the loops at the set level by mixing in return water.
  • Servo drive: screws onto the loop's balancing valve and shuts off the loop on command from the room thermostat when the required temperature is reached in the room.
  • Room thermostat: a programmable device on the wall that sets the schedule by the clock — for example, lower at night, higher in the morning — and sends a signal to the servo drives.

Comparison of Manifolds for Heating, Water Supply and Underfloor Heating

System Type Key Components What It Regulates
Heating manifold Balancing valves, air vents Flow through radiators, air removal
Water supply manifold Ball valves, filters, meters Cold and hot water supply to points
Underfloor heating manifold Flow meters, pump and mixing unit, servo drives Flow through loops, supply temperature

There is no universal manifold "for all systems": the configuration is selected for the task, and trying to save on this leads to redoing the unit. Eco-Service configures manifolds for the type of system — from radiator distribution to underfloor heating loops with automation. Manifold assembly in Tashkent is carried out with the composition of the unit fixed before work begins: the more loops and automation devices, the higher the final estimate, so the configuration is agreed in advance. Clients often phrase the request as underfloor heating manifold installation price — and this is an accurate description of what we calculate: assembly of the unit, installation of flow meters, connection of servo drives and commissioning of the loops. The cost depends on the number of loops, the type of pump and mixing unit and the number of automation devices, not directly on the area of the room.

Common mistakes when installing manifolds and how to avoid them

Some problems with manifolds are the result of installation errors rather than equipment defects. We examine the most common ones: airlocks, imbalance, and selection mistakes that cause the system to operate outside its design conditions.

Airlocks and noise in pipes

Noise in pipes and poor heating of distant fixtures most often mean an airlock: air accumulates at the highest point of the circuit and blocks the flow of the heat-transfer fluid. The pump hums more evenly than usual, and the temperature difference between supply and return grows to 15-20 degrees — these two signs reveal the fault without disassembling the unit. An automatic air vent at the highest point of the manifold eliminates the problem from the start: it releases air during filling and after every draining of the system. Without it, air is removed manually through Mayevsky valves, and after a scheduled shutdown of the riser the procedure must be repeated. During installation, bring the air vent out at the highest point of the unit — on the lower manifold it is useless, since an air pocket does not form there.

Uneven heating due to lack of balancing

If one underfloor heating circuit heats more strongly than the others, the cause is a lack of balancing: the flow of heat-transfer fluid between the loops is not equalized. The loop with the lowest hydraulic resistance — usually the shortest one — takes most of the flow, while the long circuits receive insufficient heat and warm up with a delay of 30-40 minutes. The flow is equalized with flow meters on the supply manifold: liters per minute are measured for each loop and the valves are adjusted to the design values — for circuits of 60-80 meters this is approximately 1.5-2 liters per minute. Balancing is done using the flow meters, not "by eye": without measurements, adjustment turns into trial and error with valve positions, and the result is unstable — after a change in outdoor temperature the imbalance returns.

Mistakes when choosing the diameter and number of outlets

  • Diameter for the riser: a 3/4 inch manifold on a 1 inch riser chokes the flow, the velocity of the heat-transfer fluid increases, and humming appears in the pipes.
  • Number of outlets: the manifold is chosen exactly according to the number of circuits with no reserve — later there is nowhere to add a radiator or a loop.
  • Flow capacity: a unit with 6 outlets is installed on 10 circuits on the assumption that it will "push it through" — on the distant loops the flow drops by half.
  • Recalculation after installation: the unit is replaced entirely, so selection is done before purchase — according to the number of circuits and the type of riser.

Warranty, timelines and acceptance of manifold installation work

After the unit is assembled, it matters who is responsible for the connections and how the work is accepted. We break down warranty obligations, pressure testing as a form of acceptance, and realistic on-site visit timelines.

2-year warranty on installation and connection

Eco-Service provides a 2-year warranty on manifold installation and connection — including threaded connections, piping and pressure testing of the unit. The obligations cover both the manifold cabinet and the tie-in points to the riser: if after six months the union fitting on the supply starts leaking or the thread on the outlet strips, the visit and repair are at the service's expense. There is one condition — the unit was not disassembled by third-party technicians and components were not changed without approval. In our practice, the cost of work does not affect the warranty period: both a basic assembly and an extended unit with flow meters are covered equally. If the unit was disassembled by third-party technicians or components were changed, the obligations for connections are voided — so keep the acceptance certificate and the receipt for the fittings.

Pressure testing as acceptance of work

We hand over the unit after pressure testing: the system is held under pressure, and only after that is the work considered accepted — before finish finishing. We test the heating manifold at one and a half times the working pressure, and the water supply at the riser pressure with a hold of at least one hour; the pressure gauge on the supply manifold shows a drop if a union nut is not tightened somewhere or a gasket is leaking. Pressure testing is done before pouring the screed and laying tiles: if the unit is checked after finishing, any leak will mean opening up the surface. The cost of assembly does not affect the warranty period: both a basic assembly and an extended unit with flow meters are covered equally. Record the pressure test result in the certificate — this is your argument if a leak appears during the warranty period.

Installation timelines and on-site visits by districts of Tashkent

A typical manifold installation in an apartment takes one working day; we travel to districts of Tashkent — Chilanzar, Yunusabad, Mirzo-Ulugbek and others. Assembling a unit with 4-8 outlets with piping and pressure testing takes 6-8 hours, and connecting to the riser adds another 1-2 hours. The timeline depends on the readiness of the chases and screed: if the piping is already prepared, installation and pressure testing fit into a day, otherwise a preparation stage is added. Our own service center in Tashkent handles acceptance and diagnostics on site — there is no need to take the fittings to another city. Plan installation before finish finishing: postponing it to the stage after laying tiles lengthens the work by 2-3 times due to opening up the surface.

Conclusion

Manifold installation is work where the cost of a mistake is not visible immediately, but after a season: pressure imbalance, cold circuits, a frozen unit. Below is a short summary worth keeping in mind before purchasing components and before starting to chase walls.

Key takeaways

  • The system type dictates the configuration: heating, water supply and underfloor heating require different fittings, and there is no universal unit "for everything".
  • Calculate before purchasing: the number of outlets and the diameter are determined in advance, because a manifold is not extended in sections — it is replaced entirely along with the piping.
  • Underfloor heating does not work without automation: flow meters, a mixing unit and balancing of circuits are the mandatory minimum, otherwise the far loops remain cold.
  • Pressure testing before finish finishing: only it shows tightness without opening up the screed and tiles — after laying the surface there is no way to check the joints.
  • Warranty on installation and connection — 2 years subject to compliance with operating conditions, system pressure and coolant quality.
  • Documentation and unit passport: keep the piping diagram and receipts for the fittings — without them a warranty case is difficult to confirm, and repairs become more complicated.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
27 сен. 2026
I ordered manifold installation in a new building, everything was done neatly and quickly. 2-year warranty, I am satisfied with the result.
ЕВ
Елена В.
24 сен. 2026
They installed heating manifolds, they work without complaints. The cost is calculated after diagnostics, but the result is worth it.
ШМ
Шухрат М.
15 сен. 2026
The master arrived the same day, installed the manifolds with quality. The price depends on the scope of work, but I was satisfied.
ОС
Ольга С.
9 сен. 2026
I searched for manifold installation specialists for a long time, and these guys did everything at the highest level. 2-year warranty, I recommend.
БТ
Бекзод Т.
4 сен. 2026
The manifold installation went smoothly, the master explained everything. The price depends on the scope of work, but the quality is excellent.
НП
Наталья П.
24 авг. 2026
I ordered manifold installation in a private house, they did it quickly and cleanly. The cost is calculated after diagnostics, but I am satisfied.
РА
Рустам А.
9 авг. 2026
Professional manifold installation, all connections are sealed. 2-year warranty, I will contact them again.
ИЛ
Ирина Л.
7 авг. 2026
They installed manifolds for underfloor heating, they work perfectly. The price depends on the scope of work, but the result exceeded expectations.
ДН
Дмитрий Н.
25 июл. 2026
The manifold installation was done neatly, all wishes were taken into account. The cost is calculated after diagnostics, but I am satisfied.
ГИ
Гульнара И.
23 июл. 2026
I ordered manifold installation, the specialists arrived on time, everything was done with high quality. 2-year warranty, thank you!
ТС
Тимур С.
20 июл. 2026
They installed manifolds in the apartment, the pressure in the system is stable. The price depends on the scope of work, but I am satisfied.
АК
Анна К.
15 июл. 2026
The manifold installation went without problems, the specialists were polite. The cost is calculated after diagnostics, but the quality is top-notch.
ФЮ
Фарход Ю.
10 июл. 2026
They installed manifolds for heating, everything works perfectly. 2-year warranty, I recommend to everyone.
МБ
Марина Б.
29 июн. 2026
I ordered manifold installation, they did it quickly and neatly. The price depends on the scope of work, but I was satisfied.
ИР
Ильхом Р.
26 июн. 2026
The manifold installation was done professionally, the layout features were taken into account. The cost is calculated after diagnostics, but the result is excellent.
СГ
Светлана Г.
20 июн. 2026
They installed manifolds in a new building, everything was done on time. 2-year warranty, I am satisfied with the work.
РД
Руслан Д.
13 июн. 2026
I requested manifold installation, they did it quickly and with quality. I recommend.
ДЖ
Динара Ж.
31 мая 2026
They did the manifold installation faster than promised. Pleasantly surprised.
ЕК
Ержан К.
23 мая 2026
Good work, the masters know their business. The manifold installation was done conscientiously.
СШ
Сергей Ш.
6 мая 2026
I ordered manifold installation — they arrived on time, did everything neatly. Satisfied!
АТ
Алмас Т.
13 апр. 2026
I applied for manifold installation, they did it quickly and with high quality. I recommend.
АМ
Алия М.
12 апр. 2026
I applied for manifold installation, they did it quickly and with high quality. I recommend.
МО
Мадина О.
8 апр. 2026
I called a specialist for manifold installation — he arrived the same day, everything works.
ГС
Гульнара С.
4 апр. 2026
I requested manifold installation, they did it quickly and with quality. I recommend.
ЕК
Ержан К.
3 апр. 2026
I applied for manifold installation, they did it quickly and with high quality. I recommend.
МО
Мадина О.
2 апр. 2026
Adequate prices for manifold installation, without markups. Everything is honest.
ОВ
Олег В.
29 мар. 2026
Very polite master, explained everything about manifold installation. I recommend to friends.
СШ
Сергей Ш.
17 мар. 2026
Thank you for the manifold installation! The price is fair, the result is excellent.
РД
Руслан Д.
13 мар. 2026
A very polite master, he explained everything about manifold installation. I recommend to friends.
ЕК
Ержан К.
7 мар. 2026
I ordered manifold installation — they arrived on time, did everything neatly. Satisfied!
ВЛ
Виктор Л.
4 мар. 2026
I called a master for manifold installation — he arrived the same day, everything works.
АМ
Алия М.
18 фев. 2026
They did the manifold installation faster than promised. Pleasantly surprised.
АТ
Алмас Т.
10 фев. 2026
I contacted them for manifold installation, they did it quickly and with high quality. I recommend.
МО
Мадина О.
9 фев. 2026
Good work, the masters know their business. The manifold installation was done conscientiously.
ОВ
Олег В.
4 фев. 2026
Quality manifold installation, neat and without unnecessary mess. I will contact them again.
АТ
Алмас Т.
20 янв. 2026
I ordered manifold installation — they arrived on time, did everything neatly. Satisfied!
МА
Марат А.
11 янв. 2026
Excellent service! The manifold installation was completed on time, without unnecessary questions.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about manifold installation

Answers to the most popular questions from our clients

Manifold installation starts from 299,000 sum; the final price depends on the number of circuits and the scope of work.
Connecting a manifold costs from 339,000 sum; the master names the exact amount after inspecting the unit.
Manifold piping starts from 329,000 sum and depends on the number of loops and the type of pipes.
Standard manifold installation takes one working day; with a large number of circuits, the work may take up to two days.
Yes, for manifold installation we give a 2-year warranty on the work and connections.
The visit and diagnostics are free if you agree to the manifold installation; you pay only for the work itself.
For manifold installation, you usually need the manifold itself, fittings, shut-off valves and air vents; all of this can be selected for your project.
Before manifold installation, the master inspects the manifold unit, checks the pressure and the condition of the pipes, after which he gives an exact estimate.
You can pay for manifold installation in cash or by card transfer after the work is completed.
Most often, when installing a manifold, leaking fittings, corroded valves, and faulty flow meters are replaced.
Clear access to the manifold unit, move things away from the pipes, and prepare the project or wiring diagram in advance.
A complex manifold installation with a large number of circuits costs from 899,000 soums; the price depends on the volume and configuration of the system.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на