Ремонт техники Специалисты Строительство и ремонт Другое Страны

Master for distribution box installation in Tashkent

Installation of a distribution box Tashkent

Visit and diagnostics free, 2-year warranty, installation in one visit — from 49,900 sum.

12 years of experience
1200+ facilities
Installation in 1 visit
Examples of work — installation of a distribution box
Otabek Yuldashev
Electrician
4.9
Types of services

Our work on distribution boxes in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Box installation
Installation of a box in a concrete wall or drywall: we select the diameter for the number of lines and fix it flush with the wall.
Дверная москитная сетка
Box fitting
Fitting the box into a ready hole: we level it so that the cover sits without gaps or skewing.
Сетка Плиссе
Box replacement
Replacing an old box with a new one: we dismantle the brittle plastic and install an enclosure for the same number of wires.
Антикошка PetScreen
Box relocation
Relocating the box to a new place: we extend the lines, chase a channel and close the old socket flush.
Антипыль Micro Mesh
Chasing for a box
Chasing for a box: we cut a socket of the required diameter and depth, with even edges for installation.
Нестандартная москитная сетка
Wire termination
Terminating wires in the box: we distribute the cores into groups, twist the same-name ones and lay them without tension.
Раздвижная москитная сетка
Connecting with terminals
Connecting with terminals: we seat the cores in the clamps, tighten them fully and check the contact for heating.
Магнитная рамка
Soldering twists
Soldering twists: we solder the connections with solder, insulate with heat shrink and remove oxides from the copper.
Сетка-штора на магнитах
Line marking
Line marking: we label each group and phase so that the scheme is readable during the next repair.
Pricing

Prices for distribution box installation in Tashkent

Service type Description Price Warranty
Installation of a distribution box Concealed wiring, concrete от 89 900 сум 2 years
Installation of a distribution box Open wiring, wall от 49 900 сум 2 years
Replacement of a distribution box Dismantling of the old, installation of the new от 74 900 сум 2 years
Installation of a distribution box Drywall, ceiling от 59 900 сум 2 years
Installation of a distribution box Brick, wall chasing от 109 000 сум 2 years
Installation of a distribution box For a stretch ceiling от 54 900 сум 2 years
Installation of a distribution box Concealed, three or more groups от 159 000 сум 2 years
Relocation of a distribution box Changing the location, wall chasing от 129 000 сум 2 years
Installation of a distribution box Circuit assembly, connection от 119 000 сум 2 years
Installation of a distribution box Connecting wires with terminals от 69 900 сум 2 years
Installation of a distribution box Mounting on a concrete wall от 84 900 сум 2 years
Installation of a distribution box Concealed, under tiles от 99 000 сум 2 years
Installation of a distribution box Cable entry, sealing от 64 900 сум 2 years
Installation of a distribution box Connection to the switchboard от 139 000 сум 2 years
Installation of a distribution box Installation in corrugated conduit, screed от 149 000 сум 2 years
Installation of a distribution box Complex circuit, many groups от 219 000 сум 2 years
Installation of a distribution box Volumetric unit, apartment от 249 000 сум 2 years
Installation of a distribution box Full wiring of the unit от 299 000 сум 2 years
Why Us

Our advantages in distribution box installation

Installation in 1 visit without rework

A team of 2 electricians completes the installation of a distribution box in one visit; a repeat visit is needed in only 4% of cases

Arrival within 40 minutes across Tashkent

6 emergency teams are on duty in Yashnabad, Mirzo-Ulugbek and Yunusabad districts, average arrival time 38 minutes

1200+ sites in operation since 2026

1200+ distribution boxes installed in new buildings, offices and private houses, 97% of clients return again

12 years of experience in electrical installation

A craftsman with a specialized electrical safety permit, over 10 years of experience, 850+ orders for distribution units

2-year warranty on installation

Written contract and 2-year warranty on connections; over 12 years, complaints about boxes are less than 3%

10% discount when ordering from 3 points

The 10% discount applies to comprehensive installation; 68% of clients combine boxes with wiring replacement in one order

We work 7 days a week

Applications accepted without days off, 40% of visits fall on Saturday and Sunday, the dispatcher is available 24 hours

Unit diagram before work begins

We agree on the wiring plan and connection diagram before installation; 100% of sites are handed over with as-built documentation

Process

Order stages

01

Inspection and diagnostics

The craftsman visits the site, checks the condition of the wiring and determines the place for the distribution box. We agree on the connection diagram.

02

Selection of box and materials

We select a box for the type of wiring and load, prepare terminals and fasteners. All equipment is certified.

03

Installation of the box

We install the box on the wall or in a niche, run the cables, secure and label them. We work neatly and without dust.

04

Connecting the wires

We connect the cores with terminal blocks or welding, following the diagram and color coding. We prevent heating and oxidation of contacts.

05

Checking and testing

We run the load, check heating and contact quality. We make sure the network works stably.

06

Handover and warranty

We show the result and give operating recommendations. The work carries a 2-year warranty.

Team

Our specialists in distribution box installation

Абдуллаев Шухрат

Abdullaev Shukhrat

Electrical installer

12 years of experience
150 reviews 4.7
Юлдашев Дилшод

Yuldashev Dilshod

Electricity metering specialist

16 years of experience
54 reviews 5.0
Смирнова Елена

Smirnova Elena

Service center administrator

15 years of experience
135 reviews 5.0
Рахимов Фарход

Rakhimov Farkhod

Power engineer

5 years of experience
81 reviews 4.8
Каримов Бахтиёр

Karimov Bakhtiyor

Meter replacement craftsman

14 years of experience
134 reviews 4.8
Кузнецова Ольга

Kuznetsova Olga

On-site service coordinator

16 years of experience
170 reviews 4.9
Тошматов Санжар

Toshmatov Sanzhar

Electrical technician

13 years of experience
197 reviews 4.9
Мирзаев Азиз

Mirzaev Aziz

Customer service manager

14 years of experience
54 reviews 4.9
Cases

Cases of distribution box installation

Установка рамочной сетки
Replacement of a distribution box in an apartment
74,900 sum
2 year warranty
Problem
The circuit breaker in the panel periodically trips, the sockets in the room work intermittently
Diagnostics
During inspection, melting of the old distribution box and twisting of aluminum wires were revealed
Solution
We dismantled the old box, installed a new one with terminal clamps and reconnected all lines
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.9
Установка дверной сетки
Installation of a distribution box during renovation
49,900 sum
2 year warranty
Problem
After renovation in a new building, the wires in the ceiling niche were not connected
Diagnostics
Lighting and socket group cables were found routed out without connection
Solution
We installed a distribution box, connected the wires with clamps and marked the lines
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
4.8
Установка сетки Антикошка
Installation of a distribution box in a private house
89,900 sum
2 year warranty
Problem
When several appliances are turned on at the same time, the wiring heats up and smells of plastic
Diagnostics
The absence of a distribution box was revealed — all connections are made with twists in the wall
Solution
We installed a distribution box, separated the groups into individual lines and replaced the connections with clamps
Смирнова Елена
Smirnova Elena
Service center administrator
4.9
Нестандартная сетка
Relocating a distribution box because of furniture
129,000 sum
2 year warranty
Problem
The box interferes with the installation of a cabinet and is located behind future furniture
Diagnostics
The box is located in an inconvenient place, access to the connections is blocked, the cables are stretched
Solution
We carefully relocated the box to a new place, extended the cables and restored all connections
Рахимов Фарход
Rakhimov Farkhod
Power engineer
4.7
Раздвижные сетки
Installation of a distribution box in a new building
59,900 sum
2 year warranty
Problem
The developer left the wires without connections, the lights and sockets do not work
Diagnostics
Cables are routed out in the ceiling without a box, connections are completely absent
Solution
We installed a distribution box, connected all groups and checked the operation of each line
Каримов Бахтиёр
Karimov Bakhtiyor
Meter replacement master
5.0
Сетка Антипыль
Installation of a distribution box in a garage
54,900 sum
2 year warranty
Problem
The lighting and sockets in the garage work unstable, sometimes the light goes out
Diagnostics
The connections are made without a box, the wires are oxidized due to humidity
Solution
We installed a sealed distribution box and reconnected all lines to clamps
Кузнецова Ольга
Kuznetsova Olga
On-site service coordinator
4.9
Перетяжка полотна
Installation of a distribution box in a cottage
159,000 sum
2 year warranty
Problem
When powerful appliances are turned on, the main circuit breaker trips
Diagnostics
All groups are brought together into one point without a box, overloading one line affects the others
Solution
We installed a distribution box with separation into individual groups and protection for each line
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.8
Сетка Плиссе
Installation of a distribution box in an office
69,900 sum
2 year warranty
Problem
In the office, some sockets periodically turn off and the light flickers
Diagnostics
Loose connections were found in the old box without line marking
Solution
We installed a new distribution box, reconnected and marked all groups
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
5.0

Installation of a distribution box in Tashkent by Eco-Service: types of work, connections and a 2-year warranty

What a distribution box is and why it is needed in an apartment

A distribution box is a node where the main cable branches into wiring groups. Without it, the wiring to the rooms turns into a bundle of separate lines from the panel, and inspecting any contact requires opening up the finish.

The purpose of a junction box in the electrical wiring scheme

A distribution box is a node in which the main cable branches into groups: lighting, sockets, separate lines. One input comes from the panel, and inside the node it splits into three to five directions — kitchen, bedroom, bathroom, hallway; each is protected by its own 10, 16 or 25 amp breaker. It is here, and not at the socket, that copper-to-copper connections are made via Wago terminals, sleeves or soldering — whether the line will heat up depends on the quality of this contact. If the box is removed, each branch will have to be run with a separate cable from the panel: wire consumption increases 2-3 times, and finding a break or a weak contact without dismantling the walls becomes almost impossible.

Where the box is placed: ceiling, wall, under plaster

  • Ceiling: the classic place in Tashkent panel buildings — the node is fixed to the slab before pouring the screed or installing the stretch fabric.
  • Wall at a height of 2.2-2.5 m: a convenient level for inspection; access is not blocked by cabinets or furniture.
  • Concealed in plaster: the box is recessed flush into the wall, the cover remains removable — this is how it is done in new buildings.
  • In a niche or behind a false wall: an option for hallways and bathrooms where aesthetics matter.
  • Right by the panel: when the line is short and an intermediate node is not needed.

How a distribution box differs from a junction box

This is the same device: "distrib" is short for "distribution", "junction" comes from the word "splicing" of the wires inside. Both names describe one node: an enclosure with a terminal block where the main line is divided into groups and connected by twisting, soldering or Wago terminals. In Tashkent listings and price lists both variants are found — installation of a junction box and installation of a distribution box mean the same service, so when ordering, clarify with the technician that it is the same job, so as not to pay twice for one action. Installation of a distrib box is a term from the same group: a shortened form that electricians use in messages and requests. Clients searching also type the full variant — installation of a distribution box — and land on the same service, only the wording is four words longer.

Types of boxes and wiring: what suits an apartment and a house

The choice of box depends on whether the wiring is concealed or exposed, what the wall is made of, and what load the groups carry. We break down three scenarios: concrete and brick, surface mounting, and classification by material with IP.

Box for concealed wiring: under plaster and in concrete

We install boxes for concealed wiring in concrete and brick using a core bit and a rotary hammer, seating them on alabaster or gypsum mortar. We select the core bit diameter to match the product's size: a standard round box takes 68 mm, two groups side by side take 80 mm, and when chasing for a block of three sections we use 100 mm. In concrete we drill to a depth of 45–50 mm, in brick — 40 mm, otherwise the loose masonry crumbles at the edge of the hole. In Tashkent panel buildings of series 1-464, the rebar runs in a mesh with a 100 mm pitch, so we choose the point using a detector, not at random. Clients often phrase the request as installation of a junction box price — and the technician immediately understands that both a mounting box and seating into the wall are needed. In concrete, the seating depth is critical: if the box is sunk too deep, the cover won't close flush with the plaster, and it will have to be leveled again.

Box for exposed wiring: when it's needed and what it looks like

We mount an exposed box on the wall for surface wiring — in wooden houses, at dachas, and in utility rooms. The body comes with four to six entries for 3×2.5 and 3×1.5 cable, the cover is removed on a latch or two screws, and fastening is with two wood screws or 6×40 dowel nails into brick. In wooden buildings near Tashkent (Chirchiq, Gazalkent), we additionally run the cable in flexible metal conduit or corrugated tubing with a metal braid — an exposed plastic box without this doesn't provide the required protection class. The standard size of an outdoor box is 100×100×50 mm; for eight groups we use 150×110×70 mm. For exposed wiring, choose a box with an IP of at least 44: in unheated rooms, condensation settles on the walls and, without protection, causes oxidation of the terminals.

Comparison of boxes by material, IP, and purpose

Box type Material IP Where it's used
Under plaster plastic IP20 apartments, offices
Outdoor plastic IP44-IP65 dachas, utility rooms
Metal steel IP20-IP44 industrial, wood
For drywall plastic IP20 partitions, ceilings

Plastic is used for apartments, metal — for rooms with increased fire safety requirements; IP is chosen according to humidity. For drywall, boxes with clamping lugs are used: they are fixed in a 12.5 mm sheet without a backing, but for two or more groups a jumper between sections is needed. Metal models at sites with wooden structures are installed with mandatory grounding of the body — a separate 2.5 mm² conductor to the PE bus. Don't confuse the IP of the box with the IP of the entire assembly: even an IP65 box won't help if the cable enters through an unsealed entry.

What is clarified before ordering

  • Wall type: concrete, brick, or drywall determines the seating method — core bit, chase, or clamping lugs.
  • Number of groups: up to three, a round 68 mm box is enough; from four — a block with a jumper.
  • Connection method: Wago terminals for copper, sleeves or soldering for aluminum in old housing stock.
  • Estimate: installation of a junction box price depends on the volume of chasing and the number of groups, not on the cost of the product.
  • Replacing the assembly: installation of a junction box price when dismantling an old assembly is calculated separately — cleaning the chase and reconnecting take more time than the initial installation.
  • Exact calculation: installation of a junction box price is confirmed by the technician after inspection — the total can't be quoted from a photo without a 20-30% margin of error.

How distribution box installation is carried out: stages of work

We show the full cycle — from marking the point according to the diagram to testing the unit under load. This way the customer sees what each operation consists of and what they are paying the electrician for.

Marking and chasing for the box

We mark the point according to the wiring diagram, chase a channel for the cable and drill a socket with a core bit of the required diameter. In the panel buildings of Tashkent — Chilanzar, Yunusabad, Sergeli — the walls are load-bearing, so we keep the channel depth within the limits permissible for reinforced concrete and run the route strictly vertically. A rotary hammer with a concrete drill bit and a diamond core bit of 68 or 80 mm produce a clean edge without chipping the plaster, and dust extraction via a construction vacuum cleaner keeps the stairwell and apartment clean. Installation of the distribution box begins with this very operation: without precise marking and a level socket, the enclosure will not sit flush. During chasing, Eco-Service first checks the wall with a hidden wiring detector — hitting someone else's cable costs more than the work itself. Horizontal chases longer than 3 m in a panel are prohibited, so a long route is run along the ceiling or along the vertical — this is precisely why the box is often shifted from the original diagram.

Installing the distribution box in the wall

We seat the distribution box in the wall on mortar and set it flush with the finish plane. Gypsum mortar sets in 15-20 minutes, so we fix the box with wedges and check it with a level immediately — after it hardens, adjusting the position without chipping the plaster will no longer be possible. In the brick walls of old housing stock we seat the opening for the box on alabaster, in concrete — on a fast-setting compound with reinforced edges. The cable entries must face the panel: the box cannot be turned after seating, you would have to re-chisel the socket. We remove the factory plugs on the entries only after pulling all the lines, otherwise mortar gets inside and clogs the seats for the terminals.

Wiring the groups and connecting wires inside the box

  • Wago terminal blocks: lever models of the 221 and 222 series for copper up to 4 mm² — quick installation without tools, they hold contact under vibration and are convenient for future inspection.
  • Crimping with ferrules: a copper ferrule plus a hydraulic press give a permanent connection for aluminum and large cross-sections, with heat-shrink tubing with an adhesive layer on top.
  • Soldering: POS-61 with flux for critical groups where minimal transition resistance is needed on a long line up to 30 m.
  • Twisting without a ferrule: we do not leave it — under load it heats up, oxidizes and after 1-2 years gives contact resistance above the norm.
  • Core marking: heat-shrink tags on each line before connection, so as not to confuse phase and neutral when reworking.

Testing the unit under load and marking the groups

After assembly we ring out each group, measure the current under load and mark the lines right on the box cover. A multimeter in continuity mode shows the integrity of the core, a clamp meter — the actual current on each group, and a thermal imager detects overheating at the terminals already at 5-10 °C above background. We take the measurement with the appliances switched on: the lighting line is loaded with lamps, the power line — with connected equipment, and the discrepancy with the calculated breaker current is visible immediately. On the cover we label the groups: kitchen, bedroom, hallway sockets — without this label the next electrician looks for the needed line by trying breakers one by one, not by the marking.

Box replacement and relocation: old housing stock and stretch ceilings

Two situations most often require reworking a finished assembly: old Tashkent housing stock with aluminum wiring, and a renovation where the box is covered by a stretch ceiling fabric. Let's look at how we work in each case.

Replacing a distribution box in old housing stock with aluminum

We perform replacement of a distribution box in old housing stock and connect aluminum to copper only through terminal blocks or sleeves — we do not make direct twists. In buildings of old construction in Tashkent, Chilanzar and Mirzo-Ulugbek district, aluminum conductors with a cross-section of 2.5 mm² sit alongside copper taps for sockets and lighting, and installing distribution boxes in such assemblies requires disassembling every twist and checking its condition. Aluminum and copper in direct contact form a galvanic pair: the connection point heats up and deteriorates within one or two heating seasons. Through Eco-Service, such a replacement is done with an inspection of all taps and labeling of the groups. Before starting work, measure the load current on each group — if the total current on the old line exceeds the rating of the circuit breaker, no terminal blocks will save the assembly from overheating.

Relocating a box under a stretch ceiling

We relocate a distribution box under a stretch ceiling onto the wall or into a hidden hatch to preserve access for inspection. When installing a stretch fabric in khrushchyovkas and panel buildings in Sergeli, a box embedded in the ceiling slab has to be brought out onto the wall next to the chandelier or hidden behind a decorative inspection hatch in the corner of the room — in this case, installation of distribution boxes is done after dismantling the old ceiling covering. If the box is left behind the fabric without a hatch, the very first overload of the group will mean the ceiling has to be dismantled — that costs more than the relocation itself. Plan the relocation point before measuring the fabric: a shift of 10-15 cm already changes the cutting layout and adds work.

Reconnecting old wiring and finding a hidden box

We find a hidden box with a cable locator and reconnect the old wiring without opening up the entire wall. Installing a distribution box after the search takes less time than continuous wall chasing: the device detects the metal of the enclosure through a layer of plaster up to 40 mm, then we open up only a 15×15 cm area under the assembly itself. Clients often write briefly in a request — installation of a junction box — and the technician at the address immediately understands that a search for the assembly and an inspection of the taps are needed. Another common wording in requests — installation of distribution boxes — means the same scenario: find the assembly, check the taps, reconnect the groups. Before reconnecting, we check the conductor cross-section: if the cross-section is too small for the new load, the connection in the box will heat up regardless of the quality of the terminals. In Tashkent apartments with 2.5 mm² aluminum wiring, replacing the assembly without recalculating the cross-section for an air conditioner or a cooktop leads to a repeat call for the technician within a month.

How many groups can be connected and how to avoid overload

We break down how many lines one box can really handle, how to link them to circuit breakers and RCDs, and what to do if the wires inside the junction start heating up.

Calculating the number of groups per box

We calculate the number of groups per box based on the total current and the cross-section of the incoming cable — usually this is 3-6 groups for a standard apartment. For a 6 mm² copper feed with a single-phase 220 V scheme, the working current stays within 40 A, and each line with a 2.5 mm² cable accounts for up to 16 A: the kitchen socket group, room sockets, lighting, a separate branch for the boiler or air conditioner. Clients searching often type "Distribution box installation" — and land on this breakdown, because the number of lines determines the layout of the junction. In a Tashkent apartment with a stove and two air conditioners, exactly six lines are needed — a 10 mm² feed, a 50 A breaker, and each group runs its own cable to its own device. More groups in one box means more connections: every extra connection is a potential hot spot, so it's better to split lines across separate boxes.

Circuit breakers and RCDs: how they protect the groups in the box

We select the breaker to match the cross-section of each group, and we install an RCD on wet zones and socket lines. A 2.5 mm² cable gets a 16 A module, a 1.5 mm² lighting line gets a 10 A one, and the hob gets a separate device rated for its nameplate current, more often 32 A with 6 mm² copper. We install a 30 mA RCD on the socket network and the bathroom, and on the feed — a fire-protection one at 100 or 300 mA with a time delay; in an Eco-Service panel such combinations are assembled with selectivity so that only the faulty line trips. A breaker protects the cable, not a person: without an RCD on a socket group, if there's a breakdown to the enclosure, the breaker may not trip, because the leakage current is below the trip threshold.

Why wires in a distribution box heat up and what to do

  • Weak contact: a twist without a ferrule or terminal block oxidizes, resistance grows, the connection point heats up under load — we redo the junction using Wago or a crimped ferrule.
  • Undersized cross-section: 2.5 mm² aluminum on a group with a kettle, microwave and washing machine heats up already at 3.5 kW — we replace the section with 2.5-4 mm² copper.
  • Group overload: one line carries the sockets of two rooms and the kitchen, the total current exceeds the breaker rating — we split the consumers into separate branches.
  • Poor terminal tightening: screws loosen from thermal expansion, the contact burns at the edges — we tighten with a torque screwdriver and check with a thermal imager.
  • Copper-aluminum oxidation: direct contact between the two metals causes electrochemical corrosion — we connect only through a terminal block with grease.

2-year warranty, in-house crew and request intake in Tashkent

The work is performed by a staff team, not outside contractors, so a single contractor is responsible for the result. Below — how the warranty works, to which standards the installation is carried out, and how to submit a request for a master's visit.

2-year warranty on installation and connections

Eco-Service provides a 2-year warranty on the installation of the distribution box, the wiring of groups and wire connections — including Wago terminal blocks, crimping with ferrules and soldering of twists. We process a warranty case based on the completed work act and receipt: the master records the condition of the assembly with photos before and after installation, so that when a claim is made there is something to compare with. The coverage extends to the mechanics of the connection, the contact under screw clamps and the integrity of the insulation at cable entry points, and not just the housing itself. The warranty is valid as long as the assembly has not been opened by third parties: if after our work the box was opened by another electrician, the cause of the fault can no longer be established. In requests, clients often write briefly — installation of a distribution box — and from this wording the dispatcher immediately understands that a visit is needed for installing the connection assembly. In my opinion, it is precisely this point that most often eliminates disputes — the client sees that responsibility is not diluted.

In-house crew of masters and PUE standards

The work is performed by Eco-Service's own crew of masters according to PUE standards — without subcontracting or random contractors. Electricians with permits up to and above 1000 V visit the site; they handle both power and lighting groups, work with copper and aluminum cable, select the cross-section for the load and balance it across circuit breakers. PUE standards set requirements for chasing depth, core bend radius, stripping length for the terminal block and the prohibition of twists without welding or crimping — these parameters are specified in the acceptance checklist and are checked before closing the box. In our practice, at old-building sites it is most often precisely the connection assembly that has to be redone, and not the box itself. An in-house crew means that a single provider is responsible for the result: you won't have to figure out who exactly ruined the connection if something goes wrong.

How to submit a request and receive a master

  • Request: you submit it via the website, Telegram or by phone — you describe the task: installation, replacement or relocation of the box.
  • Clarification: the dispatcher asks about the type of wiring, the core material and the number of groups in order to select a master for the task.
  • Inspection: the electrician arrives at the site, checks the panel, the condition of the cable and the place for the box.
  • Estimate: after the inspection we state the scope of work and the timeframe — without a visit the figures are not fixed.
  • Installation: the work is carried out at the agreed time; after acceptance we issue an act and a warranty document; before the visit, photograph the panel and the place for the box — based on the photos we will tell you in advance whether the existing groups are sufficient or rewiring will be required.

Conclusion

Briefly about what defines a working assembly: the type of box, the connection method and the calculation of groups. Below are five conclusions worth keeping in mind before starting work.

Main conclusions

  • A distribution box is the branching assembly for groups: without it, cable consumption increases, and inspection and troubleshooting turn into opening up the walls.
  • The type of box is chosen based on the wiring and the wall: concealed — for under plaster and into concrete, open — with IP44 protection and above.
  • Connections are made with terminal blocks, ferrules or soldering: a twist without a ferrule under load heats up and oxidizes within just a few months.
  • Aluminum and copper are connected only through terminal blocks or ferrules: direct contact between the two metals breaks down due to electrochemical corrosion.
  • The number of groups is calculated based on current and cross-section: when heating occurs, the contact, the core cross-section and the actual load on the circuit breaker are checked.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
7 окт. 2026
I ordered the installation of a distribution box in a new building, the master did everything neatly and quickly. A 2-year warranty, which is very pleasing.
ДР
Дилноза Р.
30 сен. 2026
They installed a distribution box in the apartment, the work was done with quality, the wires are laid evenly. The cost is calculated after diagnostics, but the result is worth it.
ШТ
Шухрат Т.
23 сен. 2026
I needed the installation of a distribution box, they arrived the same day. Everything was connected, checked, I am satisfied.
МА
Мадина А.
13 сен. 2026
The installation of the distribution box went great, the craftsman explained all the nuances. The price depends on the scope of work, but I was satisfied.
РН
Рустам Н.
25 авг. 2026
I ordered the installation of a distribution box for a dacha, they did it quickly and without unnecessary questions. 2-year warranty.
ЛС
Лола С.
15 авг. 2026
They installed a distribution box in a private house, everything works properly. The master is polite, I recommend.
БХ
Бекзод Х.
21 июл. 2026
I needed a distribution box installed, so I contacted them on a friend's recommendation. Everything was done at the highest level, I'm satisfied.
НМ
Наргиза М.
18 июл. 2026
The installation of the distribution box took a little time, the craftsman did everything cleanly. The price depends on the scope of work, but the result is excellent.
ТЮ
Тимур Ю.
25 июн. 2026
I ordered the installation of a distribution box in the office, they arrived on time, everything is neat. 2-year warranty.
ЗБ
Зульфия Б.
13 июн. 2026
They installed a distribution box in the apartment, the master explained in detail about further operation. The cost is calculated after diagnostics, but I am satisfied.
ОФ
Отабек Ф.
6 июн. 2026
The installation of the distribution box went smoothly, the master quickly figured out the wiring. I recommend.
ГИ
Гульноза И.
2 мая 2026
I ordered the installation of a distribution box, everything was done with quality and on time. 2-year warranty.
СД
Санжар Д.
1 мая 2026
I needed the installation of a distribution box, I chose this company and did not regret it. Everything works, I am satisfied.
ФК
Феруза К.
29 апр. 2026
The installation of the distribution box was done quickly, the master took all my wishes into account. The price depends on the scope of work, but the result was pleasing.
ИР
Ильхом Р.
15 апр. 2026
I ordered the installation of a distribution box in the garage, they did everything neatly and reliably. 2-year warranty.
ДТ
Джамиля Т.
7 апр. 2026
They installed a distribution box in a new building, the craftsman checked everything and gave advice. The cost is calculated after diagnostics, but I was satisfied.
ТН
Тимур Н.
31 мар. 2026
Quality installation of a distribution box, neat and without unnecessary mess. I will contact them again.
АМ
Алия М.
17 мар. 2026
I contacted them for the installation of a distribution box, they did it quickly and with quality. I recommend.
СШ
Сергей Ш.
22 фев. 2026
Thank you for the installation of the distribution box! The price is fair, the result is excellent.
АТ
Айгерим Т.
17 фев. 2026
I contacted them for the installation of a distribution box, they did it quickly and with quality. I recommend.
СК
Сауле К.
16 фев. 2026
Good work, the masters know their craft. The installation of the distribution box was done conscientiously.
ОВ
Олег В.
5 фев. 2026
Good work, the craftsmen know their trade. The distribution box installation was done conscientiously.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about distribution box installation

Answers to the most popular questions from our clients

Installation of a distribution box starts from 49,900 sum; the exact amount depends on the type of box and the complexity of the circuit.
Usually, installing a distribution box takes from 40 minutes to 2 hours, if no reworking of existing wiring is required.
Yes, for the installation of a distribution box we provide a 2-year warranty on the work and connections.
Yes, the technician comes to the address for the installation of a distribution box; the visit and diagnostics are free if you agree to the repair.
For the installation of a distribution box, the technician brings terminal blocks, ferrules, heat shrink, and tools; the box itself and the cable are usually purchased by the client, or we select them according to the scheme.
Yes, the installation of a distribution box in houses with aluminum wiring is performed using special transition terminals to avoid contact between copper and aluminum.
Yes, before installing a distribution box, the technician de-energizes the line and checks for absence of voltage with an indicator.
The installation of a distribution box is done for new wiring, while the replacement of a distribution box is done when the old box has melted, oxidized, or cannot accommodate the required number of connections.
Replacement of a distribution box is needed if crackling is heard, a burning smell is felt, the box heats up, or the connections have darkened.
Yes, moving a distribution box is done by extending the cable and installing a new box in a convenient location; the price is from 129,000 sum.
Payment for the installation of a distribution box is made after the work is completed and the connections are checked, in cash or by transfer.
Clear access to the wall and ceiling at the work site, remove furniture and valuables, and also inform the technician in advance about hidden wiring and places where you cannot chase grooves.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на