Ремонт техники Специалисты Строительство и ремонт Другое Страны

ATS installation technician in Tashkent

ATS installation Tashkent

The lights don't go out when the grid fails, the panel is assembled to standards, the site visit and diagnostics are free, 2-year warranty.

Installation in 1 day
500+ panels assembled
12 years of experience
Examples of work — ATS installation
Aziz Nazarov
Electrician
4.9
Types of services

Our ATS installation services in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
ATS installation
Mounting the enclosure on a DIN rail, wiring the power lines and testing switching under load.
Дверная москитная сетка
Connection to the incoming cable
Stripping and crimping the cores of the incoming cable, connecting to the terminals with the tightening torque specified in the datasheet.
Сетка Плиссе
Configuration for the backup input
Transferring power to the backup line when the main phase is lost, setting the tripping thresholds.
Антикошка PetScreen
ATS installation in a private house
Installation in a private house panel taking into account the incoming cable, grounding and the load on the boiler and pumps.
Антипыль Micro Mesh
ATS installation in an apartment
Compact installation in an apartment panel, connection to the riser and configuration for household appliances.
Нестандартная москитная сетка
Installation of a three-phase ATS
Three-phase installation with monitoring of phase rotation, neutral and load symmetry across the lines.
Раздвижная москитная сетка
Assembling a panel with an ATS
Layout of the panel, installation of circuit breakers, relays and the ATS, marking of the groups and assembly according to the circuit.
Магнитная рамка
Replacement of a failed ATS
Dismantling the faulty unit, installing a new one and testing switching to the backup.
Сетка-штора на магнитах
Relocating the ATS to a new place
Disconnection, removal from the old place, installation at the new location and connection according to the circuit.
Pricing

Prices for ATS installation in Tashkent

Service type Description Price Warranty
ATS installation Main circuit breaker, panel, connection от 549 000 сум 2 years
Connecting the ATS to the input cable Power cable, terminals, phasing от 349 000 сум 2 years
Configuring the ATS for backup input Generator, priority, switching от 399 000 сум 2 years
ATS installation in a private house Single-phase network, panel, load от 599 000 сум 2 years
ATS installation in an apartment Panel, riser, coordination от 499 000 сум 2 years
Three-phase ATS installation Three-phase input, balancing от 749 000 сум 2 years
Panel assembly with ATS Enclosure, circuit breakers, busbars, marking от 849 000 сум 2 years
Replacing a failed ATS Dismantling, installing a new one от 449 000 сум 2 years
Relocating the ATS to a new place Cable, fasteners, rewiring от 649 000 сум 2 years
Connecting the ATS to the generator Cable, terminals, test start от 699 000 сум 2 years
Configuring the ATS input priority Main network, backup, delay от 379 000 сум 2 years
ATS installation with overload protection Relays, circuit breakers, setpoints от 799 000 сум 2 years
ATS installation in an office space Panel, load, cable duct от 899 000 сум 2 years
ATS installation in a store Display cases, refrigerators, backup от 949 000 сум 2 years
ATS installation at a production facility Machines, line, three-phase input от 1 490 000 сум 2 years
Commissioning of the ATS after installation Inspection, switching test от 419 000 сум 2 years
Laying cable to the ATS panel Corrugated conduit, fasteners, wall chasing от 479 000 сум 2 years
Installation of the main circuit breaker Rating, terminals, sealing от 299 000 сум 2 years
Installation of a voltage monitoring relay Protection, settings, indication от 319 000 сум 2 years
Connecting a backup generator Cable, ATS, grounding от 990 000 сум 2 years
Installation of a grounding loop Ground rods, strip, resistance measurement от 1 090 000 сум 2 years
Distribution panel assembly Circuit breakers, RCDs, busbars, marking от 1 190 000 сум 2 years
Replacing the old panel with a new one Dismantling, installation, connection от 1 290 000 сум 2 years
Connecting the stabilizer to the ATS Input, output, bypass от 519 000 сум 2 years
Installation of cable trays for the ATS Route, fasteners, grounding от 679 000 сум 2 years
Diagnostics of the ATS system Continuity testing, measurements, conclusion бесплатно 2 years
ATS maintenance Tightening terminals, cleaning, test от 279 000 сум 2 years
Fault finding in the ATS circuit Measurements, diagram, fault localization от 359 000 сум 2 years
Repair of the ATS switching mechanism Disassembly, lubrication, adjustment от 579 000 сум 2 years
Replacing the contactor in the ATS Dismantling, installation, testing от 439 000 сум 2 years
Configuring the ATS switching delay Time relay, setpoint от 339 000 сум 2 years
Testing the ATS under load Simulation of power outage, measurements от 719 000 сум 2 years
Why Us

Our advantages in ATS installation

ATS installation in 1 day

Our own crew of 4 electricians completes the full cycle of work at a site in a single visit — no waiting for supplies and no repeat visits.

500+ panels assembled

Over 12 years of practice, more than 500 panels have been assembled: from apartment panels to industrial ones, each undergoes 3 stages of testing under load.

12 years of experience

The site foreman with a permit up to 1000 V personally leads the project: 12 years in automation, more than 200 sites in Tashkent and the region.

Site visit within 2 hours

The engineer arrives within 2 hours in Tashkent, diagnoses the incoming line and records the connection diagram before work begins.

15% discount

When ordering ATS installation together with incoming cable replacement, a 15% discount on the second type of work at the same site.

Load up to 63 A

We assemble 63 A ATS units for apartments, offices and shops: 2 inputs, automatic switching in 0.5 seconds.

2-year warranty

2-year warranty on panel assembly and automation setup, including a free site visit if the protection trips.

Protocol and diagram

After installation we issue a resistance measurement protocol and a single-line diagram — 2 documents for the management company and energy supervision.

Process

Order stages

01

Request and consultation

We accept the request, clarify the type of site, load power and preferences for automation. We agree on a convenient time for the visit.

02

Site visit and diagnostics

The engineer inspects the incoming panel, generator and existing power supply diagram. Records the grid parameters and installation conditions.

03

Design and ATS selection

We prepare the connection diagram and select automation for your load. We agree on the solution and cost before work begins.

04

Equipment installation

We install the ATS, lay cable lines and connect the generator. We carry out the work according to the design and electrical safety standards.

05

Commissioning and testing

We set the trip thresholds and switching time. We test operation under load and simulate a grid failure.

06

Handover and warranty

We demonstrate the system's operation and hand over the diagram and documents. The completed work carries a 2-year warranty.

Team

Our ATS installation specialists

Абдуллаев Шухрат

Abdullaev Shukhrat

Electrical installer

14 years of experience
76 reviews 5.0
Юлдашев Дилшод

Yuldashev Dilshod

Electricity metering specialist

10 years of experience
105 reviews 4.8
Смирнова Елена

Smirnova Elena

Service center administrator

6 years of experience
72 reviews 4.9
Рахимов Фарход

Rakhimov Farkhod

Power engineer

5 years of experience
94 reviews 4.7
Каримов Бахтиёр

Karimov Bakhtiyor

Meter replacement technician

13 years of experience
168 reviews 5.0
Кузнецова Ольга

Kuznetsova Olga

On-site service coordinator

6 years of experience
132 reviews 5.0
Тошматов Санжар

Toshmatov Sanzhar

Electrical technician

15 years of experience
198 reviews 4.9
Мирзаев Азиз

Mirzaev Aziz

Customer relations manager

9 years of experience
197 reviews 5.0
Cases

ATS installation cases

Установка рамочной сетки
ATS installation in a private house after voltage surges
599,000 sum
2 year warranty
Problem
When the city network was cut off, the lights went out completely, the refrigerator and boiler were left without power.
Diagnostics
The incoming panel had no automatic switching to backup, the generator was connected manually via an extension cord.
Solution
An ATS was installed in the private house, connected to the incoming cable and backup generator, and commissioning was carried out.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.9
Установка дверной сетки
Connecting the ATS to the incoming cable in an apartment
349,000 sum
2 year warranty
Problem
After the riser was replaced, the incoming cable was left hanging on a twist joint, and the ATS was not connected to power.
Diagnostics
The cable is not long enough, there is no terminal connection and no protection for the incoming line.
Solution
The ATS is connected to the incoming cable, an incoming circuit breaker is installed, and the line has been tested under load.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
4.8
Установка сетки Антикошка
Setting up the ATS for the backup input
399,000 sum
2 year warranty
Problem
When switching to the generator, the ATS tripped with a delay, and the equipment managed to shut down.
Diagnostics
The switching time and main input priority settings were knocked off.
Solution
The ATS is configured for the backup input, delays and priority are set, and a test under load has been carried out.
Смирнова Елена
Smirnova Elena
Service center administrator
4.9
Нестандартная сетка
Assembling a panel with an ATS for a house
849,000 sum
2 year warranty
Problem
The panel was assembled crudely, the breakers were heating up, and the plugs tripped when switching inputs.
Diagnostics
There is no matching of ratings, and there is no separate line for the backup input.
Solution
A new panel with an ATS, incoming circuit breaker and voltage monitoring relay has been assembled, and the groups are labeled.
Рахимов Фарход
Rakhimov Farkhod
Energy engineer
4.7
Раздвижные сетки
Replacing a failed ATS
449,000 sum
2 year warranty
Problem
The ATS stopped switching the load to backup, the contacts turned black and melted.
Diagnostics
The contact group of the power relay burned out, the cause being current overload.
Solution
The failed ATS has been replaced, the terminals tightened, and the operation of both inputs checked.
Каримов Бахтиёр
Karimov Bakhtiyor
Meter replacement technician
5.0
Сетка Антипыль
Installing a three-phase ATS in a workshop
749,000 sum
2 year warranty
Problem
When one phase was lost, the equipment ran on two, the machines hummed and overheated.
Diagnostics
A single-phase ATS does not monitor all three phases, and there is no protection against phase imbalance.
Solution
A three-phase ATS with phase monitoring has been installed, connected to the incoming cable and the generator.
Кузнецова Ольга
Kuznetsova Olga
On-site service coordinator
4.9
Перетяжка полотна
Connecting the ATS to the generator in a store
699,000 sum
2 year warranty
Problem
The generator started, but the load did not switch to it, and the cash register and refrigerators were down.
Diagnostics
The ATS is not connected to the generator, and the backup cable is not routed to the panel.
Solution
The ATS is connected to the generator, the cable to the panel is routed, and the input priority is configured.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.8
Сетка Плиссе
Relocating the ATS to a new place after renovation
649,000 sum
2 year warranty
Problem
After the redevelopment, the ATS remained in the dismantled niche, and access to it was closed off.
Diagnostics
The cable routes are cut, and the mounting and incoming cable require re-laying.
Solution
The ATS has been relocated to a new place, the lines extended, and the connection to the incoming cable restored.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
5.0

ATS installation in Tashkent by Eco-Service: selection, installation and panel assembly with a 2-year warranty

What an ATS is and when you can't do without one

An automatic transfer switch is not a "breaker in a panel" but a system of several coordinated devices that keeps a site powered when the grid fails. Below we'll look at what it consists of, how it differs from a manual switch, and who needs one.

What an ATS is and what the system consists of

An ATS (automatic transfer switch) is an assembly consisting of an incoming circuit breaker, a contactor, a voltage monitoring relay and a priority relay, which in seconds switches a site's power from the main line to the backup one. The incoming circuit breaker protects the line from overload and short circuit, the contactor physically closes and opens the power circuits, the voltage monitoring relay monitors the level on the main line, and the priority relay decides which input is considered the working one at any given moment. Terminal blocks and installation wire inside the panel tie it all together: they carry the signal from the relay to the contactor coil. The tripping sequence is simple — the main line, the voltage monitoring relay, switching to backup. A contactor alone without a priority relay does not provide correct switching: when the main line returns, the power may "jitter" between inputs, so the logic is always assembled as a complete set.

How an ATS differs from a manual switch

A manual switch requires a person to physically act, whereas an ATS trips on its own — the typical switching time is a fraction of a second, while manual switching takes from several minutes. The difference is critical not in calm mode but at the moment of an accident: while the operator is looking for the panel and turning the handle, the site is already de-energized. Automatic switching happens on a signal from the voltage monitoring relay, and the backup input picks up the load without human involvement. During brief grid "flickers" a manual switch is useless — a person physically cannot react in time, and the equipment (refrigerators, servers, machine tools) has already taken a surge. Installing an automatic transfer switch covers exactly this scenario: the automation responds faster than any operator's reaction.

Who needs an ATS: house, apartment, office, shop, production

  • Private house: an overhead line causes frequent outages, and the automation picks up the load without manually starting a generator.
  • Apartment: a single-phase scheme with a voltage monitoring relay is enough; a three-phase assembly here makes the project more expensive with no benefit.
  • Office: switching to backup preserves servers, cash registers and workstations during a failure on the city grid.
  • Shop: pairing with a generator keeps refrigerated display cases and the checkout unit running; downtime directly hits revenue.
  • Production: a three-phase ATS with input priority keeps machine tools from stopping and protects equipment from a phase-loss condition.
  • Eco-Service: installs automation at all five types of sites, selecting the scheme and capacity for each.

How ATS works and how to select a scheme for the load

We break down the logic of automatic transfer switching and how load power determines the choice of a single-phase or three-phase scheme, priority, and protections.

Logic of automatic transfer switching

A voltage monitoring relay keeps an eye on the main line; when parameters go beyond acceptable limits, it sends a command to the contactor, and the load is transferred to the backup input, and when restored — it switches back. In a typical scheme, the relay monitors the 170–265 V range on each phase: going beyond the limits for longer than 0.5–1 second triggers switching, and a 40–63 A contactor breaks the main circuit and closes the backup one within 0.3–0.8 seconds. There is a delay between commands: return to the main line does not happen immediately, but 5–180 seconds after voltage stabilization. Installing automation at facilities with an unstable grid is exactly the task where the return delay matters more than the contactor's power: it protects against chatter when voltage jumps several times in a row, and with frequent switching, the resource of a contactor rated for 100,000 cycles is used up in just a few months.

Single-phase or three-phase ATS: how to choose

ATS type For which facilities Load nature What it protects
Single-phase Apartments, houses up to 7 kW Lighting, sockets, household appliances One phase and neutral
Three-phase Cottages, shops, offices, workshops Motors, pumps, furnaces All three phases and neutral
Hybrid Facilities with mixed input Single-phase and three-phase part Each group separately

We select a single-phase ATS for apartments and small houses with a load of up to 7 kW, and a three-phase one for facilities with a three-phase input: cottages, shops, offices, and production sites. Power is calculated based on the total current of all consumers with a 20–30% margin: for a 15 kW house, this is a 25 A input circuit breaker, for a workshop with motors — 63 A and above.

Setting input priority and protection selectivity

We set the input priority so that the main line is always primary, and the backup is switched on only when it fails — this eliminates false switching. The priority relay operates on the "main input first" logic: as long as the voltage on it is normal, the backup contactor is held open, even if the generator is already running and ready for load. Protection selectivity is selected by ratings: the input circuit breaker is set one step higher than the group ones, so that in the event of a short circuit on the line, the group breaker trips, not the entire facility. At facilities with two inputs from different feeders, priority is fixed on a permanent basis — switching occurs only on command from the voltage monitoring relay. If the input circuit breaker and the group breaker have the same current rating, in the event of an accident the entire facility will be disconnected, not just the individual line, so the ratings are separated by at least one step — for example, 25 A at the input versus 16 A on the groups.

ATS installation: stages of work and what the service includes

We will show the sequence of work — from cable laying to commissioning, so it is clear what the installation consists of and what is checked at each stage.

Preparation: cable laying and installation of the input circuit breaker

  • Cross-section calculation: the input cable is selected for the rated current of the input circuit breaker, not "by eye" — an undersized cross-section heats up under load and negates the protection.
  • Laying to the ATS panel: the route is run from the entry point to the installation location, walls are chased or the cable is laid in corrugated conduit and cable tray.
  • Installation of the input circuit breaker: the device is installed first in the circuit so that it disconnects both the main and backup line in the event of an overload.
  • Marking: each conductor is labeled by phase and purpose — during servicing this saves hours of diagnostics.
  • Check before energizing: before the first start, the line is continuity-tested and the ratings are verified against the design — this way work whose cost is calculated after inspecting the site does not turn into rework.

Connecting the ATS to the input cable and backup supply

Eco-Service connects the ATS to the input cable and configures it for the backup supply — after that the unit is ready for automatic switching. The terminals of the main line and the backup are tightened to the torque specified in the device's datasheet: a loose contact under load heats up within minutes of operation. The phase sequence of both supplies is checked with a phase rotation indicator — if the phase rotation order differs, a three-phase motor of a pump or machine will go into reverse when switched and fail. On the backup supply, the setpoints are additionally configured and the mechanics of the changeover contactor are tested manually, before energizing. If the main and backup lines are phased differently, the connection order at the terminals is changed, rather than "treating" the consequences on the consumer side.

ATS commissioning after installation

Eco-Service completes the installation with commissioning: it simulates a loss of the main line and checks that the ATS correctly switches the load to the backup and returns it back. First, power is removed from the main line and the response time is recorded — for household models this is a matter of seconds, for industrial ones with a return delay the parameter is configured separately. Then, under the actual load of the site, it is checked how the contactor handles the starting current of a pump, compressor or machine: at no load the unit works flawlessly, but under peak load both a weak contact and an incorrect setpoint become apparent. The return to the main line is also tested — with a delay, so that the generator does not "jitter" during short dips in the grid. Clients often search for ATS installation price — and land on this page, although the final estimate is formed only after inspecting the site and checking the input cable. Commissioning is carried out under the actual load of the site, not "at no load" — only this way can you see whether the contactor will withstand the starting current of a pump or machine.

Assembling a panel with ATS: layout and overload protection

The panel is where all the input switching logic comes together: commutation, priority, load protection. Let's break down what a well-designed layout consists of, which protective elements are installed alongside, and how to choose an enclosure for the conditions at the site.

What is included in assembling a panel with ATS

  • Main circuit breaker: protects the supply line from overcurrent and serves as the disconnection point for the entire panel during maintenance.
  • Input contactors: mechanically switch the load between the main and backup inputs based on a signal from the priority relay.
  • Voltage monitoring relay: monitors the grid parameters and issues a command to switch when there is a voltage sag or surge.
  • Priority relay: determines which input is considered the main one and which is only switched on when it fails.
  • Terminal blocks and busbars: combine neutral and grounding conductors, simplifying the connection of outgoing lines.
  • Line marking: labels and a diagram on the panel door that the technician uses for orientation during repairs.

Overload protection and voltage monitoring relay

Assembling a panel with ATS at Eco-Service is done as a complete set, not as a collection of separate modules: the work here finishes with marking each line and a diagram on the door. Marking is not a formality: during future repairs or relocation, a technician without a diagram spends hours on continuity testing instead of quickly replacing a module. Installing automation at sites with gas boilers and pumps requires narrowed thresholds — the electronics of control boards are sensitive to deviations, while for power equipment a standard corridor is left. At sites with frequent fluctuations, relays are installed on both inputs, not just the main one: the backup line from the generator also produces unstable parameters at startup. Overload protection is configured according to the rating of the main circuit breaker and the cable cross-section, while the voltage monitoring relay trips on sags below normal and on surges above the operating range.

Panel enclosure IP protection rating

For a panel with ATS indoors, an enclosure with an IP31–IP41 protection rating is sufficient, while for outdoors or an unheated room, IP54 and higher is needed. In a dry heated vestibule or electrical room, IP31 is enough: the enclosure protects against solid particles and vertical drips. In a garage, on a veranda, or under a canopy where moisture and dust are possible, IP54 is used with a sealed door and cable glands for the cable. In rooms with high humidity — a sauna, boiler room, laundry — IP65 and higher is installed, sometimes with enclosure heating in winter. Moisture and dust are the main enemies of a contactor: in a damp room, oxidized contacts stick, and the ATS stops switching precisely at the moment of an emergency. If the site is near open ground or outdoors, allow for an enclosure with an IP margin — the difference in panel cost is incomparable to the cost of replacing a burnt-out contactor and downtime without power.

Connecting the ATS to a generator and working with a backup source

A backup generator is the most common power source on the second input after the city grid. Let's break down how the automation links it to the panel, what auto-start changes, and which mistakes most often lead to unit failure.

How the ATS links to the generator

Eco-Service connects the ATS to the generator in such a way that when the main grid is lost, the unit sends a signal to start the generator and only after it reaches operating mode does it transfer the load to the backup. Installing automation at a site with a generator requires a separate control line between the panel and the generator: the start command travels along it, and the readiness status is returned via a contactor. The start automation holds a warm-up pause — usually from 5 to 15 seconds, until the engine reaches rated speed, and during all this time the backup input contactor remains open. This sequence is the basis of any installation at a site with a generator. The load cannot be transferred to the generator immediately after startup — in the first seconds the voltage and frequency are unstable, and the equipment gets the same surge that the ATS is designed to protect against.

ATS with auto-start: what it gives the site

  • Auto-start setup: at Eco-Service, the ATS controller is linked to the generator automation, setting the voltage trip threshold and the pause time before start.
  • Load test: we simulate a grid loss, measure the time from the command to the load transfer, and check that the generator holds its rated output without sagging.
  • Maintenance schedule: we set the frequency for checking the battery, fuel level, and automation contacts so that the unit doesn't fail at the critical moment.
  • Unattended backup: the site switches to generator power automatically, which is critical for stores, offices, and production facilities with a continuous cycle.

Typical mistakes when connecting a generator to an ATS

  • Counter-switching: the generator remains running after the grid returns, the two lines converge at one point, and the protection trips.
  • Undersized capacity: the backup generator doesn't cover the starting current of a pump or machine, the voltage sags, and the automation enters a switching cycle.
  • Missing neutral: the generator is connected without a solidly grounded neutral, the voltage monitoring relay sees an imbalance, and blocks the transfer.
  • Single control circuit: the start command travels along the power line instead of a separate wire, causing the automation to pick up interference and trigger falsely.
  • No warm-up pause: the load is transferred immediately after the engine starts, and the equipment gets a surge in frequency and voltage.

Warranty, timelines and service: how Eco-Service manages a project

Let's break down what the warranty covers, how long installation takes and what service looks like after the project is handed over — from scheduled inspection of contactors to replacement or relocation of the unit to a new location.

Warranty on ATS installation — 2 years

Eco-Service provides a 2-year warranty on ATS installation — it covers work on connection to the incoming cable, panel assembly and commissioning. During this period, defects caused by our fault are rectified free of charge: loosened terminal connections, incorrect setting of the input priority, faults in the logic of switching to the backup input. The warranty is valid subject to compliance with the operating regulations: if the owner re-wires the panel themselves or connects additional load beyond the calculated one, warranty obligations for that unit are voided. In my experience, it's more often not the automation that fails, but specifically the connections — re-tightening them after the first month of operation is part of the service. Before signing the acceptance certificate, ask to be shown the terminal tightening torque on the input and on the contactor: this parameter is rarely documented, yet it determines the service life of the unit.

How long ATS installation takes

Eco-Service completes ATS installation in an apartment or private house within one working day, while on projects with a three-phase input and panel assembly the work takes up to two days. A full cycle fits into a standard day: laying the cable to the panel, installing the input circuit breaker, connecting to the backup input and commissioning with testing of switching under load. The timeline depends not on the unit itself, but on the preparation: if the cable to the panel is not laid and the input circuit breaker is not installed, a preparatory stage is added to the installation — on Tashkent projects this means plus one day. When a client asks about ATS installation price, I always clarify the scope of supply: preparation, panel assembly and automation setup are counted as separate items, so the total depends on what has already been done on the project.

Maintenance and replacement of the ATS after project handover

  • Scheduled inspection: once a year we inspect contactors, voltage monitoring relays and terminal connections for overheating and scorching.
  • Re-tightening connections: we tighten the terminals on the input and on the contactor — a loosened contact heats up and accelerates wear of the unit.
  • Switching test: we simulate a power failure and check that the automation switches to backup within the calculated time.
  • ATS replacement: if the unit fails, we replace it with a new one using the same connection diagram and repeat commissioning.
  • Relocation to a new location: when the input changes, we dismantle the unit, re-lay the cable and configure the priority.

Conclusion

We have gathered the key takeaways on ATS installation: from choosing the scheme to connecting the generator and maintenance. Below is what determines the stable operation of backup power on a project.

Main takeaways

  • An ATS is a system: correct operation depends on the set of devices — input circuit breaker, monitoring relay, contactors and panel — and not on a single switch.
  • Scheme matched to the load: the choice of single-phase or three-phase configuration is determined by the type of input and the nature of the consumers — from lighting to machine tools.
  • Full installation cycle: preparation, connection to the incoming cable, panel assembly and commissioning under real load — without the last stage the system is not tuned.
  • Backup source: pairing with a generator requires setting up auto-start, checking phase rotation and coordinating the priority of inputs.
  • Warranty and service: a two-year warranty and regular maintenance extend the service life of the unit and protect equipment on the project from surges and voltage drops.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АТ
Азиз Т.
7 окт. 2026
I ordered ATS installation for a house in Tashkent — the technician came the same day, connected everything neatly, now the lights don't go out even when the grid fails. 2-year warranty, very satisfied.
ДР
Дилноза Р.
2 окт. 2026
They installed an ATS at a dacha near Tashkent, now the generator starts by itself, no need to run around with wires. The cost is calculated after diagnostics, but the result is worth it.
СК
Сергей К.
29 сен. 2026
I needed an ATS for the store — the guys did everything quickly and cleanly, hid the wires, the breaker works like clockwork. 2-year warranty.
МА
Мадина А.
24 сен. 2026
I ordered an ATS installation for my apartment, the technician explained and configured everything, now when the power goes out the refrigerator doesn't defrost. Very satisfied.
БН
Бекзод Н.
25 авг. 2026
They installed an ATS for two inputs in a private house, switching is instant, nothing sparks. The price depends on the scope of work, but they did it with quality.
ОВ
Ольга В.
16 авг. 2026
I called a technician for ATS installation in Tashkent, he arrived on time, checked everything and connected it. Now I don't worry about my appliances during surges.
ШИ
Шухрат И.
6 авг. 2026
They made an ATS for a pumping station, it works without complaints, when the power goes out everything switches automatically. 2-year warranty.
НС
Нилуфар С.
30 июл. 2026
I ordered ATS installation for the office, the technician selected a suitable circuit breaker and installed everything in a couple of hours. The staff is happy, no more outages.
ТЮ
Тимур Ю.
28 июл. 2026
They installed an ATS at the house input, now the generator starts by itself, I don't even notice the outages. The cost is calculated after diagnostics, everything is fair.
ЕМ
Елена М.
22 июл. 2026
I requested ATS installation in Tashkent, the technician came with his own equipment and did everything neatly. 2-year warranty, I recommend.
ЖБ
Жасур Б.
16 июл. 2026
They installed an ATS for the heating boiler, now in winter I'm not afraid of being left without heat. It works quietly, switches quickly.
ГХ
Гульнара Х.
20 июн. 2026
I ordered an ATS installation for my dacha, the technician connected everything and showed how it works. The price depends on the scope of work, but the result is excellent.
РШ
Рустам Ш.
15 июн. 2026
They installed an ATS for a three-phase network, everything works stably, when a phase is lost it switches to backup. 2-year warranty.
КЭ
Камила Э.
12 июн. 2026
I needed an ATS for the store so the refrigerators wouldn't shut off. The technician handled it quickly, everything is neat, now we work without interruptions.
АП
Алексей П.
7 мая 2026
I ordered ATS installation for a private house, they came at a convenient time, installed everything and tested it under load. 2-year warranty, I'm satisfied.
ЗК
Зульфия К.
6 мая 2026
They installed an ATS for the apartment, now when the power goes out it automatically switches to the generator. The cost is calculated after diagnostics, but the work was done conscientiously.
ОВ
Олег В.
5 мар. 2026
Excellent service! The ATS installation was completed on time, without unnecessary questions.
ЕК
Ержан К.
2 мар. 2026
They completed the ATS installation faster than promised. Pleasantly surprised.
СШ
Сергей Ш.
6 фев. 2026
Excellent service! The ATS installation was done on time, without unnecessary questions.
СП
Светлана П.
3 фев. 2026
Thank you for installing the ATS! The price is fair, the result is excellent.
РД
Руслан Д.
18 янв. 2026
Very polite technician, explained everything about the ATS installation. I recommend to friends.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about ATS installation

Answers to the most popular questions from our clients

ATS installation in an apartment starts from 499,000 sum, and the master gives the exact amount after inspecting the panel and incoming cable.
Standard ATS installation takes 2–4 hours if the panel is ready and no rewiring is required.
Yes, we provide a 2-year warranty for ATS installation and all work.
Yes, diagnostics and the visit are free if you agree to the repair; the master arrives, inspects the panel and gives an exact estimate.
ATS installation requires the transfer switch itself, an incoming circuit breaker, a voltage monitoring relay and a cable of suitable cross-section — all of this is selected for the power of your network.
Technically it is possible, but ATS installation requires working with the incoming cable under voltage, so without experience and tools there is a high risk of damaging the wiring and equipment.
First the master checks the input, generator and load, then installs the ATS, connects it to the incoming cable and configures the input priority.
Yes, during the installation of the ATS the input is de-energized, this usually takes 1–2 hours, the technician arranges the time in advance.
Call us: most likely the input priority setting has gone wrong, the technician will come and fix everything free of charge under warranty.
Yes, installation of an ATS for three phases is carried out, such work is more complicated and requires balancing the load across each phase.
Payment after the work is completed, in cash or by transfer; the technician states the exact amount before installation begins, so there are no surprises.
Free access to the panel and the input cable is needed, as well as space for the device itself; if the panel is old and cramped, the technician will suggest options for rebuilding it.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на