Ремонт техники Специалисты Строительство и ремонт Другое Страны

Heating installation specialist in Tashkent

Heating installation Tashkent

We calculate heat losses and make a layout before starting work, so that radiators heat evenly and the boiler does not overpay for gas. 2-year warranty.

Installation in 3 days
14 years of experience
120+ projects
Examples of work — heating installation
Aziz Karimov
Plumber
4.9
Types of services

Our heating installation work in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Development of a heating scheme
We design the scheme for the layout of the house: the location of the boiler, radiators, risers and slopes, so that heat is distributed evenly
Дверная москитная сетка
Thermal engineering calculation
We calculate heat loss through walls, windows and the volume of the rooms, and select the boiler output and the number of radiator sections
Сетка Плиссе
Marking of routes and risers
We transfer the project onto the walls and ceilings: we mark the axes of the routes, the locations of risers and fastenings before chasing begins
Антикошка PetScreen
Installation of a wall-mounted boiler
We hang the boiler on brackets, level it, connect it to the chimney and run the heating and water circuits
Антипыль Micro Mesh
Installation of a floor-standing boiler
We place the floor-standing boiler on a level base, align it, and connect the supply, return, gas and safety group
Нестандартная москитная сетка
Boiler piping
We assemble the piping with a pump, expansion tank, filter and shut-off valves so that the circuit works without overheating
Раздвижная москитная сетка
Chimney installation
We route the chimney through the wall or roof, seal the penetration, install a condensate drain and check the draft
Магнитная рамка
Water heater installation
We connect an indirect heating water heater to the boiler: coil, circulation pump, safety group and thermostat
Сетка-штора на магнитах
Installation of polypropylene pipes
We solder polypropylene mains and supply lines to the radiators, and hold pressure during pressure testing
Pricing

Prices for heating installation in Tashkent

Service type Description Price Warranty
Heating scheme development For home and apartment от 149 000 сум 2 years
Thermal engineering calculation Calculation of room heat loss от 199 000 сум 2 years
Marking of routes and risers Preparation for installation от 129 000 сум 2 years
Installation of a wall-mounted boiler One circuit, installation от 449 000 сум 2 years
Installation of a floor-standing boiler Heavy equipment, installation от 549 000 сум 2 years
Boiler piping Pipes, fittings, shut-off valves от 349 000 сум 2 years
Chimney installation Coaxial or separate от 299 000 сум 2 years
Indirect heating boiler installation Storage tank, connection от 399 000 сум 2 years
Polypropylene pipe installation Distribution around the room от 249 000 сум 2 years
Metal-plastic pipe installation Press or compression от 279 000 сум 2 years
Cross-linked polyethylene installation Manifold distribution от 319 000 сум 2 years
Installation of steel pipes Threaded connection от 379 000 сум 2 years
Manifold unit installation Manifold, balancing от 419 000 сум 2 years
Steel radiator installation Wall-mounted, side connection от 219 000 сум 2 years
Installation of a bimetallic radiator Sectional, installation от 239 000 сум 2 years
Aluminum radiator installation Sectional, installation от 229 000 сум 2 years
Cast iron radiator installation Heavy section, installation от 259 000 сум 2 years
Convector installation In-floor or wall-mounted от 209 000 сум 2 years
Installation of thermostat For radiator, installation от 135 000 сум 2 years
Installation of water underfloor heating Pipe into screed, laying от 499 000 сум 2 years
Installation of electric underfloor heating Cable or mat, laying от 339 000 сум 2 years
Installation of underfloor heating manifold With flow meters, assembly от 359 000 сум 2 years
Pressure testing of underfloor heating circuits Pressure check от 159 000 сум 2 years
Heating system pressure testing Leak tightness check от 179 000 сум 2 years
Flushing of the heating system Removal of scale and sludge от 289 000 сум 2 years
Filling the system with coolant Start-up, air removal от 139 000 сум 2 years
Heating system balancing Flow rate adjustment от 309 000 сум 2 years
Boiler commissioning First start-up, adjustment от 329 000 сум 2 years
Turnkey heating installation House or apartment, full cycle от 1 190 000 сум 2 years
Replacement of heating risers Apartment building, riser от 599 000 сум 2 years
Heating system reconstruction Rework of old piping от 699 000 сум 2 years
Installation of boiler room Private house, unit piping от 899 000 сум 2 years
Why Us

Our advantages in heating installation

Installation in 3 days without rework

A team of 4 installers completes a facility up to 100 m² in 72 hours: 120+ facilities in Tashkent delivered on time, 2-year warranty on all components.

14 years of experience at Tashkent facilities

More than 10 years of experience and 120+ completed facilities: we know the main networks, pressure and water quality in every district of the city.

120+ facilities and 0 accidents per season

120+ systems installed, 0 accidents during the heating season: 100% of circuits pressure-tested before handover and a certificate for each component.

Measurement within 24 hours with a thermal imager

An engineer arrives within 24 hours, measures heat losses in 1 hour and provides a wiring layout: 100% of facilities receive calculations before work starts.

10% discount when ordering within 24 hours

We fix the 10% discount in the contract on the day of measurement: 120+ clients have already saved, the price depends on the scope of work.

We calculate heat losses in 1 hour

Thermal imaging survey in 1 hour: we find 100% of cold bridges and select the boiler and radiators precisely for the area.

2-year warranty on installation and components

2-year warranty on welding, wiring and piping: 120+ facilities under maintenance, warranty visit within 24 hours.

Turnkey installation without subcontracting

All 4 installers are on staff, 0% subcontracting: 120+ facilities delivered by one team, the 3-day installation deadline is never missed.

Process

Order stages

01

Consultation and measurement

We discuss the tasks, study the layout and features of the facility. We record preferences for comfort and budget.

02

Design and estimate

We prepare the wiring layout, select the boiler, radiators and pipes. We agree on the scope of work, the price depends on the complexity of the system.

03

Preparation of premises

We dismantle old devices if necessary and mark out the routes. We protect furniture and floors from dust and construction marks.

04

Installation of equipment

We install the boiler, manifolds, radiators and pipelines. We observe slopes, fastenings and manufacturer requirements.

05

Pressure testing and commissioning

We test the system under pressure and eliminate leaks. We fill the circuit and adjust the pumps and balancing.

06

Handover and warranty

We demonstrate the operation of the components and explain the operating rules. Installation is covered by a 2-year warranty.

Team

Our heating installation specialists

Смирнов Алексей Викторович

Smirnov Aleksey Viktorovich

Acrylic bathtub installer

6 years of experience
212 reviews 4.9
Абдуллаев Шухрат Бахтиёрович

Abdullayev Shukhrat Bakhtiyorovich

Waterproofing specialist

15 years of experience
160 reviews 4.9
Каримова Нилуфар Абдурашидовна

Karimova Nilufar Abdurashidovna

Service center administrator

7 years of experience
147 reviews 5.0
Кузнецов Дмитрий Сергеевич

Kuznetsov Dmitry Sergeyevich

Hydromassage installation master

6 years of experience
200 reviews 4.8
Юлдашев Фаррух Отабекович

Yuldashev Farrukh Otabekovich

Composite bathtub technologist

8 years of experience
151 reviews 4.7
Рахимова Зулфия Шавкатовна

Rakhimova Zulfiya Shavkatovna

Field work coordinator

11 years of experience
192 reviews 4.7
Мирзаев Санжар Алишерович

Mirzayev Sanzhar Alisherovich

Siphon connection specialist

15 years of experience
124 reviews 4.8
Тошматов Бекзод Улугбекович

Toshmatov Bekzod Ulugbekovich

Client relations manager

10 years of experience
118 reviews 4.7
Cases

Heating installation cases

Установка рамочной сетки
Radiator replacement in a private house
239,000 soum
2 year warranty
Problem
The old cast-iron radiator in the bedroom barely heats, water seeps through the joints between the sections
Diagnostics
The sections are clogged with years of deposits, the threaded connections have lost their tightness
Solution
We dismantled the old battery, installed a bimetallic radiator with new valves and flushed the supply lines
Смирнов Алексей Викторович
Smirnov Aleksey Viktorovich
Acrylic bathtub installer
4.9
Установка дверной сетки
Installation of a wall-mounted boiler in an apartment
449,000 soum
2 year warranty
Problem
The client bought a new gas boiler; the old unit constantly goes out and does not hold the temperature
Diagnostics
Wear of the heat exchanger and automation of the old boiler; complete replacement of the equipment is required
Solution
We removed the old boiler, mounted a wall-mounted boiler on a new bracket, and connected gas, water, and electricity
Абдуллаев Шухрат Бахтиёрович
Abdullaev Shukhrat Bakhtiyorovich
Waterproofing specialist
4.8
Установка сетки Антикошка
Gas boiler piping with a pump
349,000 soum
2 year warranty
Problem
After the boiler installation, the system works in fits and starts, and the radiators heat unevenly
Diagnostics
The boiler is connected directly without a safety group and circulation pump
Solution
We assembled the piping with a pump, safety group, expansion tank, and shut-off valves
Каримова Нилуфар Абдурашидовна
Karimova Nilufar Abdurashidovna
Service center administrator
4.9
Нестандартная сетка
Installation of a water-based underfloor heating system
499,000 soum
2 year warranty
Problem
The kitchen and hallway have cold tiles; the owners want underfloor heating instead of radiators
Diagnostics
The existing layout is not designed for a low-temperature circuit; a new installation scheme is needed
Solution
We laid the underfloor heating pipes with insulation and damping tape, and connected them through a manifold unit
Кузнецов Дмитрий Сергеевич
Kuznetsov Dmitry Sergeevich
Hydromassage installation master
4.7
Раздвижные сетки
Installation of polypropylene pipes in a house
249,000 soum
2 year warranty
Problem
The new building has no heating distribution, the walls are bare, pipes and radiator connections are needed
Diagnostics
There is no project; the risers are only brought to the entrance of the apartment
Solution
We ran polypropylene pipes through the rooms, installed radiators, and connected them to the risers
Юлдашев Фаррух Отабекович
Yuldashev Farrukh Otabekovich
Composite bathtub technologist
5.0
Сетка Антипыль
Installation of a manifold unit on a floor
419,000 soum
2 year warranty
Problem
In a two-story house, the far radiators are barely warm; pressure is lost along the way
Diagnostics
Series piping does not allow the coolant to be distributed evenly across the circuits
Solution
We installed a manifold unit with balancing valves and converted the system to a radial scheme
Рахимова Зулфия Шавкатовна
Rakhimova Zulfiya Shavkatovna
On-site work coordinator
4.9
Перетяжка полотна
Installation of a chimney for a boiler
299,000 soum
2 year warranty
Problem
The boiler in the private house shuts off due to the draft sensor, and there is a smell of burning in the room
Diagnostics
The old chimney is clogged with soot and has a reverse slope; there is no draft
Solution
We assembled a new coaxial chimney through the wall with the required slope and sealing of the passage
Смирнов Алексей Викторович
Smirnov Aleksey Viktorovich
Acrylic bathtub installer
4.8
Сетка Плиссе
Installation of an indirect heating boiler
399,000 soum
2 year warranty
Problem
Hot water in the house runs out after two people; you have to wait for it to heat up
Diagnostics
The tankless heater cannot cope with the volume; a storage tank connected to the boiler is needed
Solution
We installed an indirect heating boiler, connected it to the boiler, and ran the hot water circuit
Абдуллаев Шухрат Бахтиёрович
Abdullaev Shukhrat Bakhtiyorovich
Waterproofing specialist
5.0

Heating installation in Tashkent by Eco-Service: turnkey systems for a private house

How we design the system before the first joint: calculation, schematic, marking

Work begins not with pipes or the boiler, but with the engineering stage: heat engineering calculation, distribution schematic and marking of the runs. Let's look at what this stage delivers before the first weld.

Why a heat engineering calculation is needed before installation

The Eco-Service engineer starts with a heat engineering calculation: it determines the boiler output, the number of radiator sections and the pipe diameter for the specific area and insulation of the house. The specialist calculates heat losses through walls, windows, roof and ventilation — for a 120 m² house with brick walls and single-chamber double-glazed units they reach 9-11 kW, for the same floor area with an insulated facade and double-chamber units — 6-7 kW. This difference sets the boiler class and the number of sections: for 9 kW a 12 kW unit is installed, for 6 kW a 9-kilowatt one is enough. In Tashkent in winter the temperature drops to minus 10-12 °C, and here the power reserve works not as a safety margin but as excess gas consumption. Without a calculation the boiler is chosen "by eye" with double the reserve — this means excess fuel consumption in winter and burner cycling; an accurate heat engineering calculation pays for itself in the first heating season.

Developing the heating schematic and marking the runs

  • Developing the heating schematic: choosing the type of distribution, positioning the boiler, radiators and manifold unit on the floor plan.
  • Marking the runs and risers: laying out the pipe axes on walls and floor taking into account load-bearing structures and furniture.
  • Calculating the heat load by room: distributing the output across the rooms so that the bedroom and the kitchen are equally warm.
  • Material specification: the exact footage of pipes, the number of fittings, valves and sections — without buying anything extra.
  • Approval of the schematic: final check of the distribution taking into account future finishing and furniture.

What the design stage delivers before work starts

Work on heating systems without design documentation turns into fitting units on site: the crew welds the circuit, then it turns out that the radiator does not have enough sections and the boiler cannot handle the peak load. We fix the schematic, specification and marking before purchasing materials — and on site all that remains is to assemble the units according to the drawing. Clients often find us via the search "heating system installation" and come precisely for this order of work: first the calculation, then the schematic, then the welding. On houses of 150-200 m² in Tashkent and the suburbs this order shortens the work period by 2-4 days compared with working "off the cuff" and eliminates re-welding of already installed sections. The schematic should be approved before buying pipes: changing the distribution after marking costs less than re-welding a finished circuit.

Which heating system suits your home

The system is selected to match the heat source, the area of the house and the living pattern. Below are three basic scenarios and a comparison of distribution schemes that helps you decide before the surveyor's visit.

Autonomous heating of a private house

For a private house in Tashkent, Eco-Service most often assembles an autonomous circuit with a gas boiler — it does not depend on the central network and operates on its own schedule. A wall-mounted unit with a capacity of 24–32 kW covers a house of 120–200 m²: it heats radiators and prepares hot water via a built-in boiler or a separate storage tank. What distinguishes such a system from a mains circuit are three components — the boiler, the circulation pump and the expansion tank, which are assembled in the boiler room rather than spread across the floors. Clients often write to us briefly — heating installation — and from that request we immediately understand that a surveyor's visit and a circuit calculation are needed. The autonomous scheme requires a chimney and supply ventilation: these are planned in advance, otherwise the gas boiler will not be commissioned according to the standards of the supervisory authorities.

Water-based underfloor heating and central heating

Water-based underfloor heating is installed as a supplement to the radiator circuit or as the main system in certain zones — with a manifold unit and a thermostat for each loop. Central heating in Tashkent high-rise buildings supplies heat on a schedule and with seasonal shutdowns, so in apartments on the upper floors autonomous loops are often added for the kitchen, bathroom and balcony. The pipe laying spacing is taken as 150 mm in living rooms and 100–120 mm along the perimeter of external walls, where heat losses are higher. Underfloor heating cannot be installed on wooden joists without preparing the base — a screed is made first, otherwise the pipe "moves" and heats unevenly.

Distribution schemes: single-pipe, two-pipe, manifold

Scheme How it works Where it is appropriate Controllability
Single-pipe radiators in one chain small houses up to 80 m² low
Two-pipe supply and return separately houses of 1–2 floors medium
Manifold a beam from the unit to the appliance large areas, 2+ floors high

Manifold distribution is more expensive in terms of pipe, but it allows one radiator to be shut off without stopping the entire circuit — this is important during repairs. In the private sector of Tashkent, a two-pipe scheme with dead-end movement of the coolant is more often used: it is 20–30% cheaper than manifold distribution in terms of pipe footage and does not require a separate cabinet for the manifold. In my opinion, for a house up to 100 m², a two-pipe system with balancing valves on each appliance wins — the extra cost for a manifold does not pay off.

Pipes and distribution: what to choose for the Uzbek climate

The pipe material determines the service life of the circuit, its repairability, and what the cost of heating installation will be in a particular house. Let's look at four options that we use on sites, and the rules for laying routes in a house.

Polypropylene, metal-plastic, PEX and steel

Material Operating temperature Connection method Where we use it
Polypropylene (PPR) up to 95 °C fitting soldering exposed distribution in the boiler room
Metal-plastic up to 95 °C press fittings radiator branches
Cross-linked polyethylene (PEX) up to 95 °C press and crimp underfloor heating, hidden routes
Steel up to 110 °C welding and threading risers, inlets, sections near the boiler

How we lay pipes in a house

  • Route slope: we run the pipe with a slope toward the air vent so that the air pocket escapes into the automatic valve instead of getting stuck in the radiator.
  • Fastening: we install clips at a spacing at which the pipe does not sag under its own weight; on horizontals longer than two meters we add an intermediate support.
  • Hidden sections: we lay only a solid length without joints into the screed — a fitting under the screed is not visible, and a leak will show up on the ceiling of the floor below.
  • Pressure testing: after assembly, we test each circuit with pressure before pouring the screed; a connection defect is visible immediately, not after finishing.
  • Fittings: on exposed sections we install press fittings — they do not require soldering and give a smooth joint without beads.

Equipment: boiler, radiators, underfloor heating, water heater

Equipment is selected based on the design capacity and fuel source, not the other way around. Let's break down the key components of the system: the boiler, heating appliances, piping, chimney, and manifold unit.

How to choose a gas boiler for a home

For a private house in Tashkent, we select a wall-mounted gas boiler based on design capacity, and a floor-standing one when cast-iron heat retention and operation with an indirect heating water heater are needed. Wall-mounted models take up less space and more often come with a closed combustion chamber, so they draw air from outside through a coaxial chimney. A floor-standing cast-iron boiler is heavier but retains heat longer and easily heats a 150-200 liter indirect heating water heater. We calculate capacity from area and heat losses: for a 120-150 m² house in the city, 18-24 kW is usually sufficient with a margin for hot water supply. For Uzbekistan's gas, the boiler is adjusted to local pressure and calorific value — factory settings for a different fuel cause incomplete combustion and soot on the heat exchanger. Clients often search for the cost of heating system installation — and end up here, although the estimate is put together only after the boiler is selected. Before startup, ask to measure the inlet pressure and adjust the gas valve to the actual network parameters. At Eco-Service, boiler selection goes together with a heat engineering calculation so that the capacity doesn't turn out to be overstated.

Radiators and convectors: what we install

Appliance Heat output Inertia Where we install
Steel high low autonomous circuit
Bimetallic high medium high pressure
Aluminum high low autonomous circuit
Cast iron medium high long warm-up
Convector medium low large windows

Aluminum is sensitive to pressure surges and water quality: in an autonomous circuit with prepared heat transfer fluid it lasts a long time, while in a central system it corrodes faster. The cost of heating system installation depends on the number of appliances and the type of distribution — a house of the same area with cast-iron sections and with convectors will produce a different estimate.

Boiler piping, chimney, and manifold unit

  • Boiler piping: we assemble it with a safety group, expansion tank, filter, and shut-off valves — protection against overheating and contamination.
  • Chimney installation: we route it in compliance with the slope, height, and clearance from combustible structures according to standards; for wall-mounted boilers we install a coaxial one.
  • Manifold unit: we install it on the supply and return with flow meters so that each circuit receives its own volume of heat transfer fluid.
  • System balancing: after startup we set the flow rate by circuit — without this, distant radiators heat less than nearby ones.
  • Thermostats: we install them on appliances and on the manifold so that rooms maintain temperature independently of each other.

Underfloor heating and water heater: connection to the boiler

We lay hydronic underfloor heating at the screed stage: PEX pipe is laid at a spacing of 150-200 mm, and the supply temperature in the circuit is maintained at 35-45 °C through a mixing unit. We connect a 150-200 liter indirect heating water heater to the boiler with a separate hot water supply circuit with priority — when hot water is drawn, heating is temporarily paused. The cost of heating work in a house increases if underfloor heating runs across all floors: manifold groups, pump mixing units, and edge insulation tape around the perimeter are added. On wooden floors, instead of a wet screed we install a dry-laid system in the joists — it is lighter and doesn't require 28 days to dry.

How heating installation is carried out: stages and timelines

The work follows a strict sequence — from marking out the runs to commissioning and balancing. Below we'll break down the stages, the real timelines, and how the season affects the schedule.

Stages of work from marking to commissioning

  • Marking out runs and risers: we transfer the layout onto the walls and floor, mark the locations of radiators, the manifold unit, and penetrations through the floors.
  • Laying pipes and installing units: we install the mains using the chosen material, fit radiators, convectors, or water underfloor heating loops.
  • Boiler and chimney piping: we connect the boiler to the circuit, assemble the safety group, install the chimney and the indirect heating boiler.
  • Pressure testing the system: we pressurize the circuit above the working pressure and hold it for several hours — this way we find leaks before the screed is poured.
  • Commissioning and balancing: we start the boiler, warm up the circuit, adjust the flow across the branches, and set the thermostats.
  • Handover of the project: we show the customer how the units work, and hand over the as-built diagram and equipment documents.

Can heating be installed in winter

We carry out this work all year round: in winter, indoors, it doesn't get in the way, and commissioning is done right after the boiler piping. In the cold season, the crew arrives at the site with a finished design and markings, so laying the runs and installing radiators proceed at the same pace as in summer. There is one limitation — water underfloor heating: pouring the screed requires the room to maintain a positive temperature for several days, otherwise the concrete won't gain strength. For this, we use a heat gun or a temporary heating circuit, and we lay the loops after the base has warmed up. Clients often find us with the query heating systems installation — and land on this page, so let us clarify: heating installation in Tashkent and the timelines are fixed in the contract before work begins — this way the customer sees an estimate without surprises after pressure testing. In winter, it's harder to pour the screed for underfloor heating — the room needs to be warmed up, otherwise the loop will lie unevenly.

2-year warranty, service and documents for gas equipment

After installation, the warranty, service and legality of the gas connection are important. Let's break down what you receive in hand and how it works during further operation of the system.

2-year warranty on installation

Eco-Service provides a 2-year warranty on heating installation — it covers the boiler piping, pipe laying, radiator installation and commissioning. The terms are the same for both a wall-mounted Ariston and a floor-standing Ferroli, and for bimetallic sections: the term does not depend on the equipment model or the type of distribution. The warranty is recorded in the acceptance certificate with a list of specific components, rather than a general wording "work has been performed." Clients often search for heating installation in a private house price — and end up here, because the total depends on the area, the number of circuits and the pipe material, not on the price per point. In my view, it is a transparent calculation based on the project that distinguishes work under a contract from verbal promises by private crews. Once a year, it is worth checking the pressure in the circuit and cleaning the coarse filter — the maintenance schedule extends the service life of components and preserves the warranty.

Own service center and gas documents

  • Technical project: distribution diagram, equipment specification and calculation of heat losses by room in the house.
  • Chimney certificate: confirmation of draft and compliance of the channel with the requirements of the district gas service.
  • Boiler certificates: product passport, warranty card and document on verification of the gas meter.
  • Certificate of completed work: list of installed components with signatures of the technician and the customer.
  • Service contract: schedule of annual maintenance with a specialist visit in Tashkent.

Payment and installments

  • Click and Payme: card transfer in a couple of minutes, the receipt arrives in the app immediately after payment.
  • Uzcard and Humo: card payment via terminal at the site or in the office, with no commission for the customer.
  • Installments: for sites from 100 m² — under a contract with a payment schedule and a fixed down payment.
  • Staging: payment is divided into a design payment and an installation payment, the second transfer — after the work is handed over.
  • Closing documents: the certificate, invoice and warranty card are issued after signing the acceptance.

Heating installation in Tashkent is often ordered before the heating season, so the schedule and payment are agreed in advance.

Conclusion

We have gathered the main things that determine the result of heating work: from calculation and distribution diagram to pressure testing and gas documents. Below are the conclusions worth keeping in mind before starting.

Main conclusions

  • Calculation before work: the heat engineering calculation sets the boiler power and pipe diameters — without it, the system either underheats the far rooms or operates with excessive gas consumption.
  • Distribution diagram: a single-pipe one is used for compact houses up to 80 m², two-pipe and manifold — where independent regulation of each radiator is needed.
  • Pipe material: polypropylene and metal-plastic are cheaper to lay, cross-linked polyethylene and steel last longer on hidden routes in screed and walls.
  • Pressure testing: pressure testing is done before pouring the screed and final finishing — after them, finding a leak costs several times more.
  • Gas documents: the service contract and boiler passport are issued before the first start-up — without them, gas services do not give permission for operation.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
3 окт. 2026
I ordered heating installation in a new house — the guys did everything neatly and quickly, now in winter in Tashkent it's warm and cozy. A 2-year warranty, which is very pleasing.
ДР
Дилноза Р.
30 сен. 2026
We finally got heating installed in our apartment! The craftsmen arrived on time, installed everything without any mess, thank you for the work.
ШТ
Шухрат Т.
28 сен. 2026
I searched for a team to install heating for a long time, and these guys didn't let me down: they did everything with quality, and it holds pressure perfectly.
ЕВ
Елена В.
22 сен. 2026
I ordered heating installation in a private house, and was very pleased: clean, neat, and finished on schedule.
БМ
Бекзод М.
12 сен. 2026
Heating in Tashkent is a serious matter, and these specialists know their trade. Everything works without complaints, 2-year warranty.
НС
Нилуфар С.
25 авг. 2026
They installed the heating quickly and without unnecessary noise, now the house has a comfortable temperature. Thank you to the craftsmen!
ТА
Тимур А.
17 авг. 2026
The heating installation was done conscientiously, everything was thought through down to the smallest detail. I recommend them to anyone looking for reliable contractors.
ОП
Ольга П.
14 авг. 2026
I turned for heating installation and didn't regret it: the work was done professionally, everything is clean and neat.
ФЮ
Фарход Ю.
11 авг. 2026
The guys installed heating in a two-story house, everything works perfectly. The price depends on the scope of work, but the result is worth it.
ЗН
Зульфия Н.
29 июл. 2026
They installed heating in the apartment, and now we don't freeze in winter. The craftsmen are polite, they explained and showed everything.
РИ
Руслан И.
28 июл. 2026
I ordered heating installation, everything went smoothly: they arrived, did the work, cleaned up after themselves. The 2-year warranty inspires confidence.
МХ
Мадина Х.
21 июл. 2026
The heating in the new building was done quickly and with quality, no problems arose. Very pleased with the result.
СЛ
Сергей Л.
15 июл. 2026
The heating installation was completed on time, everything neat and reliable. The cost is calculated after diagnostics, which is fair.
ГА
Гулноза А.
29 июн. 2026
I entrusted the heating installation to these craftsmen and wasn't mistaken: they did everything cleanly, warmly, and without unnecessary hassle.
ЖБ
Жасур Б.
9 июн. 2026
The heating in the house was installed excellently, now it's warm even on the coldest days. Thank you for your professionalism!
НК
Наталья К.
6 июн. 2026
I ordered heating installation, and everything went wonderfully: the craftsmen were punctual, the work was neat, the result is pleasing.
СК
Сауле К.
31 мая 2026
I ordered heating installation — they arrived on time and did everything neatly. I'm satisfied!
СК
Сауле К.
15 мая 2026
Good work, the craftsmen know their business. The heating installation was done conscientiously.
НБ
Нурлан Б.
11 мая 2026
They did the heating installation faster than promised. Pleasantly surprised.
ЖУ
Жанар У.
7 мая 2026
They completed the heating installation faster than promised. I'm pleasantly surprised.
СШ
Сергей Ш.
2 мая 2026
I ordered heating installation — they arrived on time and did everything neatly. I'm satisfied!
РД
Руслан Д.
26 апр. 2026
They did the heating installation faster than promised. Pleasantly surprised.
БМ
Бекзат М.
22 апр. 2026
Excellent service! The heating installation was completed on time, without any unnecessary questions.
ДС
Дамир С.
2 апр. 2026
Quality heating installation, neat and without unnecessary mess. I will come back again.
ГС
Гульнара С.
27 мар. 2026
Very polite craftsman, explained everything about the heating installation. I recommend to friends.
КЕ
Канат Е.
14 мар. 2026
A very polite craftsman, he explained everything about heating installation. I recommend him to friends.
ДС
Дамир С.
11 мар. 2026
Ordered heating installation — they arrived on time, did everything neatly. Satisfied!
ТН
Тимур Н.
21 фев. 2026
I ordered heating installation — they arrived on time and did everything neatly. I'm satisfied!
ГС
Гульнара С.
20 янв. 2026
Quality heating installation, neat and without unnecessary mess. I will come back again.
СК
Сауле К.
17 янв. 2026
Good work, the craftsmen know their business. The heating installation was done conscientiously.
АТ
Алмас Т.
15 янв. 2026
Ordered heating installation — they arrived on time, did everything neatly. Satisfied!
ОВ
Олег В.
11 янв. 2026
Ordered heating installation — they arrived on time, did everything neatly. Satisfied!

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about heating installation

Answers to the most popular questions from our clients

The final cost of heating installation consists of the project, pipes, radiators, and boiler, so we quote the exact amount after a free diagnostics and calculation. A guideline for a typical bill is 309,000 soum per point; complex sites — up to 1,190,000 soum.
Designing a heating scheme — from 149,000 soums; it includes selecting the boiler, radiators, and piping layout for your floor area. Without a scheme, we install heating only at simple sites.
Yes, a heat engineering calculation — from 199,000 soums; it shows the required boiler capacity and the number of radiator sections. This protects against overpaying for excess equipment and against being cold in winter.
The timeframe depends on the area of the house and the complexity of the scheme: on average, heating installation takes from a few days to two weeks. The specialist gives the exact timeframe after inspecting the site.
We work with proven materials: polypropylene, metal-plastic, cross-linked polyethylene, as well as steel, aluminum and bimetallic radiators. We select materials for heating installation to suit your home and budget.
Yes, heating installation is carried out all year round, including during the heating season. If necessary, we work in stages so that the house is not left without heat.
We collect and remove all waste after heating installation ourselves, and we leave the premises clean. You don't need to look for loaders or a container.
Turnkey heating installation includes pipe routing, installation of radiators, the boiler and shut-off valves, pressure testing of the system and commissioning. After checking, the specialist hands over the system and explains how to use it.
We accept payment for heating installation in cash and by card transfer; staged payment is also possible. The cost is calculated after diagnostics and agreement on the scope of work.
We give a 2-year warranty for heating installation; the manufacturer's warranty applies to the equipment. If something leaks or fails to start — we will come and fix it free of charge.
The visit and diagnostics are free if you agree to heating repair or installation. The technician will inspect the site, measure the areas, and immediately quote the cost of the work.
Clear access to the walls and the space under the boiler, move furniture away from the radiators, provide water and electricity. Payment — per point as stages are completed, in cash or by transfer; prepayment for materials is discussed separately.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на