Ремонт техники Специалисты Строительство и ремонт Другое Страны

Wiring replacement master in Tashkent

Rewiring Tashkent

Free site visit and diagnostics, work on the day of request, 2-year warranty on installation and materials.

12 years of experience
850+ projects
Installation in 1 day
Work examples — wiring replacement
Jasur Rakhimov
Electrician
4.9
Types of services

Our wiring replacement work in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Turnkey wiring replacement
Complete replacement of old aluminum wiring with copper throughout the apartment, with new lines run to every point
Дверная москитная сетка
Partial wiring replacement
We replace worn-out circuit sections in one room or the kitchen without dismantling the remaining lines
Сетка Плиссе
Wall chasing for cable
We cut grooves in concrete and brick for cable laying, chase mounting boxes and junction boxes
Антикошка PetScreen
Laying cable in corrugated conduit
We lay cable in a corrugated tube along the ceiling and walls to protect against mechanical damage
Антипыль Micro Mesh
Laying cable in a cable duct
We lay cable in a plastic cable duct in an open manner with decorative covers installed
Нестандартная москитная сетка
Installation of a junction box
We install and connect a junction box for branching lines to the rooms
Раздвижная москитная сетка
Connecting wires in the box
We connect the wires in the box with terminal blocks or welding, insulate the twists and lay them inside
Магнитная рамка
Assembling an apartment electrical panel
We assemble the apartment panel: install circuit breakers, RCDs, busbars and connect outgoing lines
Сетка-штора на магнитах
Replacing a circuit breaker
We replace a burnt-out or tripping circuit breaker with a new one, selecting the rating for the line load
Pricing

Prices for wiring replacement in Tashkent

Service type Description Price Warranty
Replacement of electrical wiring in an apartment Full replacement, turnkey apartment от 1 490 000 сум 2 years
Electrical wiring replacement in a private house Full replacement, turnkey home от 1 390 000 сум 2 years
Replacement of electrical wiring in the office Full replacement, commercial premises от 1 190 000 сум 2 years
Wall chasing for wiring Channel preparation, concrete and brick от 449 000 сум 2 years
Cable laying in corrugated conduit Open laying, fastening от 349 000 сум 2 years
Cable laying in cable duct Installation of cable duct, laying от 399 000 сум 2 years
Distribution box installation Installation, connecting cores от 249 000 сум 2 years
Connecting wires in the box Welding, terminals, insulation от 199 000 сум 2 years
Apartment electrical panel assembly Installation of circuit breakers, busbars, enclosure от 799 000 сум 2 years
Assembly of a private house electrical panel Installation of circuit breakers, RCDs, busbars от 949 000 сум 2 years
Assembly of an office electrical panel Installation of circuit breakers, metering, busbars от 849 000 сум 2 years
Circuit breaker replacement Dismantling, installation of the new от 179 000 сум 2 years
RCD installation Connection, checking operation от 219 000 сум 2 years
RCD installation Connection, protection check от 239 000 сум 2 years
Electricity meter replacement Dismantling, installation, connection от 299 000 сум 2 years
Installation of a voltage relay Installation, threshold adjustment от 259 000 сум 2 years
Socket installation Installation of socket box, connection от 159 000 сум 2 years
Socket replacement Dismantling of the old, installation of the new от 149 000 сум 2 years
Installation of a socket block Group installation, connection от 279 000 сум 2 years
Switch installation Single-key, connection от 155 000 сум 2 years
Installation of a two-way switch Circuit for two locations от 209 000 сум 2 years
Socket relocation Dismantling, wall chasing, installation от 319 000 сум 2 years
Switch relocation Dismantling, wall chasing, installation от 309 000 сум 2 years
Chandelier installation Assembly, fastening, connection от 289 000 сум 2 years
Installation of a spot light Connection, fastening от 169 000 сум 2 years
Track lighting installation Busbar, fastening, connection от 379 000 сум 2 years
LED strip installation Installation, power supply, connection от 339 000 сум 2 years
Outdoor lighting installation Fastening, connection, sealing от 419 000 сум 2 years
Sconce installation Fastening, connection от 165 000 сум 2 years
Internet cable installation Laying, crimping connectors от 269 000 сум 2 years
TV cable installation Laying, socket installation от 329 000 сум 2 years
Grounding loop installation Installation of rods, tying от 599 000 сум 2 years
Connecting grounding to the panel Laying, busbar connection от 359 000 сум 2 years
Wiring fault detection Line testing, break detection от 229 000 сум 2 years
Finding the short circuit location Instrument diagnostics, localization от 255 000 сум 2 years
Replacement of the input cable Dismantling, pulling, connection от 499 000 сум 2 years
Full wiring replacement in a cottage Large volume, several floors от 1 790 000 сум 2 years
Emergency wiring restoration Emergency repair, damage elimination от 549 000 сум 2 years
Why Us

Our advantages in wiring replacement

Turnkey rewiring in 1 day

A team of 4 craftsmen completes a facility up to 90 sq. m in one shift: dismantling, wall chasing, installation, connection and line testing.

In-house team with no subcontracting

A staff of 12 electricians with 7+ years of experience, electrical safety certification every 12 months, staff turnover below 10%.

2-year warranty on all work

Written contract and warranty card: 2 years on installation, 3 stages of inspection before handover and a free call-out for claims.

Measurement and estimate in 2 hours

An engineer arrives within 2 hours across Tashkent, the estimate is fixed on site and does not change during the work.

850+ facilities in Tashkent

Portfolio: apartments, offices, mahalla houses and commercial premises, 96% of clients confirm deadlines were met.

15% discount on comprehensive installation

The 15% discount applies when rewiring together with the panel and circuit breakers, saving time on 2 team visits.

Only certified cable

We use cable with copper conductors per GOST, select the cross-section according to the load, 3 stages of testing: resistance, insulation, RCD.

We work without shutting off the riser

Installation is done room by room in stages, 80% of facilities are handed over with working electricity, downtime for residents is minimal.

Process

Order stages

01

Diagnostics and measurements

Inspection of the premises, checking the condition of the electrical panel and lines. We determine the scope of work and connection points.

02

Drawing up the diagram

We design the layout of sockets, switches and lighting groups. We agree the plan with you before starting work.

03

Wall chasing and preparation

We carefully chase walls for cable channels, drill holes for back boxes. We remove dust and construction debris.

04

Cable laying

We lay copper cable of the required cross-section, install back boxes and junction boxes. We comply with safety standards.

05

Panel assembly and connection

We assemble the electrical panel with circuit breakers and RCDs, connect the lines, install sockets and switches. We check each group.

06

Testing and handover

We test the load, measure insulation resistance, eliminate defects. We give a 2-year warranty on all work.

Team

Our wiring replacement specialists

Абдуллаев Шухрат

Abdullaev Shukhrat

Electrical installer

8 years of experience
119 reviews 4.8
Юлдашев Дилшод

Yuldashev Dilshod

Electricity metering specialist

5 years of experience
120 reviews 4.9
Смирнова Елена

Smirnova Elena

Service center administrator

11 years of experience
120 reviews 4.7
Рахимов Фарход

Rakhimov Farkhod

Power engineer

17 years of experience
205 reviews 4.9
Каримов Бахтиёр

Karimov Bakhtiyor

Meter replacement technician

8 years of experience
119 reviews 5.0
Кузнецова Ольга

Kuznetsova Olga

On-site service coordinator

6 years of experience
117 reviews 4.7
Тошматов Санжар

Toshmatov Sanjar

Electrical technician

17 years of experience
112 reviews 4.9
Мирзаев Азиз

Mirzaev Aziz

Customer relations manager

9 years of experience
144 reviews 4.9
Cases

Wiring replacement cases

Установка рамочной сетки
Electrical wiring replacement in a two-room apartment
1,490,000 sum
2 year warranty
Problem
When several household appliances were turned on at the same time, the fuses tripped, the sockets heated up, and there was a smell of burnt insulation.
Diagnostics
The inspection revealed aluminum wiring with crumbling insulation and twists in the junction boxes; the conductor cross-section did not match the load.
Solution
We dismantled the old lines, laid VVGng copper cable in chases and corrugated conduit, assembled new junction boxes and replaced the circuit breakers in the panel.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.9
Установка дверной сетки
Wiring replacement in a private house
1,390,000 soum
2 year warranty
Problem
Periodically, the voltage in the far rooms would drop out, and a slight electric shock was felt when touching the switch.
Diagnostics
Old aluminum wiring without grounding was discovered, damaged by moisture at the points where it passes through walls, and there was no RCD.
Solution
The wiring was completely replaced with copper wiring with a grounding conductor, an RCD and RCBOs were installed, and a grounding loop was connected.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
4.8
Установка сетки Антикошка
Replacement of electrical wiring in an office
1,190,000 soum
2 year warranty
Problem
When office equipment was operated simultaneously, the circuit breaker tripped, and some of the sockets stopped working.
Diagnostics
Overloaded old wiring with insufficient cross-section was identified, along with worn-out socket groups and no separation into lines.
Solution
Cable lines were replaced with separation into lighting and socket groups, new circuit breakers and an RCD were installed, and additional socket blocks were mounted.
Смирнова Елена
Smirnova Elena
Service center administrator
4.9
Нестандартная сетка
Wall chasing for new wiring
449,000 soum
2 year warranty
Problem
After the renovation, it was necessary to hide the cable lines in the walls; the old chases did not match in location.
Diagnostics
An inspection of the walls showed the need to lay new routes for the cable, taking into account load-bearing structures and partitions.
Solution
We chased the walls for the cable, laid the wiring in the prepared channels, and plastered over the chases.
Рахимов Фарход
Rakhimov Farkhod
Energy engineer
4.7
Раздвижные сетки
Laying cable in corrugated conduit along the ceiling
349,000 soum
2 year warranty
Problem
It was necessary to run a new lighting line in a room with concrete ceilings without chasing.
Diagnostics
The inspection showed that open cable laying without protection is unacceptable; corrugated conduit must be used.
Solution
We laid the cable in corrugated conduit along the ceiling with clip fastening, ran it into the junction box, and connected the light fixtures.
Каримов Бахтиёр
Karimov Bakhtiyor
Meter replacement technician
5.0
Сетка Антипыль
Laying cable in a cable duct
399,000 soum
2 year warranty
Problem
In the office space, it was necessary to neatly run additional lines to workstations without damaging the walls.
Diagnostics
We determined the route along the skirting boards and posts, and selected a cable duct of suitable cross-section for power and low-voltage lines.
Solution
We mounted the cable ducts, laid the cable in them, and installed sockets and switches at the workstations.
Кузнецова Ольга
Kuznetsova Olga
On-site service coordinator
4.9
Перетяжка полотна
Installation of a junction box
249,000 soum
2 year warranty
Problem
After the renovation, exposed wire twists remained; the connections sparked and heated up.
Diagnostics
The absence of a junction box was discovered; the wires were connected with twists without insulation, which created a fire hazard.
Solution
We installed a junction box, connected the wires with terminal blocks, and closed the box with a lid.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.8
Сетка Плиссе
Connecting wires in a junction box
199,000 soum
2 year warranty
Problem
In one of the rooms, the lighting periodically went out; when the wires in the box were shaken, the light flickered.
Diagnostics
Opening the box revealed oxidized and loose twists; some of the wires were overheating.
Solution
We stripped and connected the wires with terminal clamps, restored the insulation, and checked the reliability of the contacts.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
5.0
Compatibility

We work with brands from any manufacturer

Professional wiring replacement for all popular brands

Wiring replacement in Tashkent by Eco-Service: apartments, private houses and offices turnkey

When old wiring in a home becomes dangerous

In Tashkent buildings of Soviet construction, the service life of the aluminium line was exhausted long ago: it was designed for light bulbs and a television, but today it powers air conditioners and induction cookers. Let's look at the signs that determine wear and when the line needs to be replaced entirely.

Signs that the wiring needs replacing

  • Warm sockets: the plastic heats up when a kettle or heater is switched on — the contact has loosened and heats up under load.
  • Smell of burnt plastic: the insulation is breaking down from the inside, and the smell is noticeable before any visible soot appears.
  • Flickering lights: when a powerful appliance is switched on, the light dims — the aluminium has oxidised in the twists and no longer carries the current.
  • Circuit breaker tripping for no reason: the protection trips even under a normal load — the line can't handle it.
  • Twists instead of terminals: in the junction boxes the wires are connected with a twisted pair without ferrules or clamps — a typical mistake of old installations.

Why old wiring is dangerous in panel buildings and khrushchyovkas

In the panel buildings and khrushchyovkas of Tashkent, the line was designed for a load of 1-2 kW, while a modern kitchen with an electric kettle, microwave and multi-cooker draws three times as much. Aluminium with a cross-section of 2.5 mm² heats up under such conditions, oxidises at the contacts and gradually loses conductivity; in the corridors and kitchens of Soviet series, the socket groups often ran on a single line for the whole apartment. In panel buildings the routes are cast into the slabs, and in khrushchyovkas the channels run in the seams between blocks, so the path of the new line is determined in advance so as not to weaken the load-bearing structures. In my view, it's cheaper to open up the seam once for a new route than to chase a load-bearing panel blindly.

When a partial replacement is enough

We do a partial replacement when the wear is local: we replace the line of one room or the kitchen without touching the rest of the wiring. This scenario is suitable if the incoming cable and the distribution board are in order, and the old line has burnt out at a single point — for example, after an overload in the kitchen. This scope of work in one room takes one or two days and doesn't require opening up the floors throughout the apartment; the incoming cable must still be checked under load, and the breaker in the board checked for compliance with the cross-section. A partial repair is justified only if the incoming cable and the board are in order — otherwise the new line will run into an old breaker and won't provide protection. In our practice, it's Eco-Service that people most often contact specifically for a local repair after a socket group has overheated. Clients often phrase their request as wiring replacement in Tashkent when what they actually need is a specific section, not the whole apartment.

What a turnkey wiring replacement includes

The crew manages the project from the first site visit to handover: dismantling the old cable, marking out, wall chasing, laying new lines, assembling the panel, connecting the points. This isn't "pulling a cable," but tying cable, circuit breakers, RCDs and every socket into a single system.

Stages of work: from dismantling to connection

  • Site visit and measurements: the technician records the points, calculates the length of the runs and selects the cable cross-section for the load of each line.
  • Dismantling: we remove the old aluminium cable, take off sockets, switches and the panel, and clear the chases for the new line.
  • Marking out the runs: we mark the routes along the walls and ceiling before chasing — this way the runs don't intersect with gas and water pipes.
  • Chasing and laying: we cut chases for the cable, run the line in corrugated conduit or cable duct, secure it and bring the ends out into the mounting boxes.
  • Panel and connection: we assemble the panel with circuit breakers, RCDs and a voltage relay, connect the wires in the junction boxes and hook up every point.

What a turnkey apartment wiring replacement includes

A turnkey apartment wiring replacement includes the full cycle: new wiring distribution across the rooms, assembly of the apartment's electrical panel, installation of sockets and switches, connection of the lighting. We run the wiring in separate lines — kitchen, bathroom, rooms and lighting each go on their own circuit breakers, so an overload in the kitchen doesn't cut the lights in the bedroom. For each line we calculate the current and select the cross-section: the socket group gets one cable, the hob and boiler get a separate one, with a power reserve. We connect the lighting through a separate circuit breaker, so that replacing a bulb or chandelier doesn't require shutting off the whole panel. Eco-Service agrees on the number of points before chasing begins: adding a socket after the cutting means a new chase and an extra day of work.

Connecting wires and installing junction boxes

We connect the wires in the junction boxes with terminal blocks and welding, not with twists — a twist heats up and oxidises under load. We check every connection for tightness and continuity, and we position the box so that it remains accessible. In search, clients often type "wiring replacement in a house Tashkent" — and land here, although what's meant is specifically the connections and boxes. One apartment usually ends up with three to six junction boxes: one per room plus a common one for the lighting. If a line is long, we install an intermediate box — this reduces the voltage drop at the far sockets. Every box must remain accessible: if it's walled in without an access hatch, a fault will mean breaking open the finish. That's why we bring the boxes out under a hatch in advance or leave them in the ceiling space.

How we select cable, circuit breakers and RCDs for the load

Cable cross-section and breaker rating cannot be chosen "by eye" — an error in the calculation leads to overheating of concealed wiring. Below we explain how we calculate the load for each line and select the equipment.

Copper or aluminum: which cable we install

We install VVGng copper cable: it handles a higher load, does not break at bends and lasts longer than aluminum. Copper withstands a current density of about 10 A per 1 mm² versus 4-6 A for aluminum, so with the same cross-section a copper conductor can carry a line with a stove or boiler, while an aluminum one heats up even on a socket group. VVGng does not spread fire during a short circuit — this is important for concealed installation in a chase, where the cable is covered by plaster and does not cool. Aluminum must not be twisted directly with copper — at the junction of the two metals a galvanic pair forms, and the contact breaks down within just a few months. In search, clients often type "electrical wiring replacement in an apartment Tashkent" — and land on this page, so we explain the logic behind choosing the metal. If aluminum branches remain in an old house, we do not extend them with copper by twisting, but replace the section entirely or install terminal blocks. In the private sector with an aluminum service drop from the pole, we separately check the contact at the service entrance — it heats up first when the connection is poor.

Cable cross-section for the load of each line

Line Cross-section Breaker
Lighting 1.5 mm² C10
Socket groups 2.5 mm² C16
Kitchen, washing machine 2.5-4 mm² C20-C25
Electric stove 4-6 mm² C32
Apartment service entrance 6-10 mm² C40-C50

An undersized cross-section is the main cause of concealed cable overheating: the wire heats up unnoticed, and the insulation ages several times faster. We calculate the load for each line separately: we add up the power of the appliances, divide by the voltage of 220 V and take a cross-section with a 20-30% margin. For the capital's market this is especially sensitive — in old buildings a single 2.5 mm² aluminum line ran the entire apartment, and today an air conditioner, microwave and washing machine are all hung on it at the same time.

Breakers, RCDs, RCBOs and voltage relays in the panel

  • Circuit breaker per line: we install C10 for lighting, C16 for sockets, C25-C32 for the stove — we select the rating according to the cable cross-section so that the breaker trips before the wire heats up.
  • RCD for wet areas: for the bathroom and kitchen — at 30 mA, it disconnects the line in case of leakage through water or damaged insulation, protecting a person from electric shock.
  • RCBO instead of a pair: where there is little space in the panel, we install an RCBO — it combines protection against overload, short circuit and leakage in a single module.
  • Voltage relay at the service entrance: disconnects the apartment when the voltage goes beyond 190-250 V, before the surge burns out the appliances.
  • Panel assembly: we label the lines, group the breakers by zone, and leave room for 2-3 spare modules for future connections. Through Eco-Service you can have an apartment or office panel assembled with ratings selected for the specific load.

Installation methods: wall chasing, corrugated conduit, or cable trunking

Cable to sockets and the distribution board can be routed in three ways: hidden in the wall, laid in corrugated conduit under the screed, or run exposed in trunking. The choice depends on the stage of renovation, the wall material, and whether you plan to change the line in the future.

Wall chasing for wiring

Wall chasing is concealed cable routing: after the work, the wires in the wall are not visible, but the surface requires plastering and finishing. In an apartment undergoing a full renovation, the work almost always follows this route: we cut a chase 20-30 mm deep and wide enough for 2-3 cables, lay them, secure them, and plaster over them. In panel buildings in Tashkent, the route is run along the ceiling or along the floor, because in load-bearing walls the chase depth is limited by regulations and you cannot cut through the wall — this weakens the structure. In brick and monolithic buildings there is more freedom: horizontal chases are permitted, but no longer than a third of the wall. Plan wall chasing before the final finish — after tiles or wallpaper are laid, opening up the walls again is more expensive than immediately laying in a reserve in the number of lines.

Laying cable in corrugated conduit

Corrugated conduit protects the cable from mechanical damage and allows it to be pulled under the screed or in the voids of the floor structure. In our practice, this is how lines are run to kitchen sockets, to underfloor heating, and along inter-floor slabs: a PVC pipe 16-20 mm in diameter is laid before pouring, and VVGng-LS of the required cross-section is pulled inside. Corrugated conduit does not burn and does not support combustion, and in the event of a short circuit it keeps the products of combustion inside — this reduces the risk of fire in voids. In the private sector of Tashkent, it is often laid in a screed on the ground, where direct cable installation is prohibited. Do not embed corrugated conduit in concrete tight to its diameter: leave a reserve, otherwise it will no longer be possible to replace the cable inside without opening up the floor.

Cable trunking: replacing wiring without wall chasing

Scenario Trunking type What to consider
Rented apartment PVC 40×25 mm Removable without marks on the wall
Office, open space Main-line 60×40 mm Separation of power and low-current lines
Home workshop Trunking with a divider Protection from dust and moisture
Temporary line Self-adhesive mini-trunking Up to 3-4 cables of 2.5 mm² cross-section
Through Eco-Service Turnkey trunking Installation with fasteners and end caps

Cable trunking is a way to run a new line without wall chasing: the cable runs along the wall in trunking that covers it and protects it from damage. This option is convenient in rented apartments and offices: the line can be rerouted or extended without renovating the walls, and when moving out, it can be dismantled and taken along. The only limitation is that the exposed route is visible and takes up 2-4 cm from the wall, so in living rooms the trunking is placed under the ceiling or behind furniture.

Rewiring in an apartment, private house and office: how the work differs

The principle is the same — new wiring and line protection. But the amount of cable, the panel layout and the order of work depend on the type of property: an apartment, a private house and an office are calculated differently.

Electrical installation in an apartment in Tashkent: what we take into account

Switching from aluminium to copper, routing lines to the rooms and assembling an apartment panel with an RCD for the kitchen and bathroom — that is what a typical project in an apartment in Tashkent looks like. In panel buildings and khrushchyovkas, old aluminium conductors with a cross-section of 2.5 mm² cannot handle the modern load: an induction hob, a boiler and a washing machine together draw up to 8-10 kW on a single group. We run separate lines for each high-power point: the hob — 6 mm², the boiler and washing machine — 4 mm² each, socket groups — 2.5 mm², lighting — 1.5 mm². We assemble the apartment panel with 12-18 modules, with a 30 mA RCD for wet areas and 16-25 A circuit breakers per line. Clients often search for "apartment rewiring price" — and land here, so we calculate the estimate after a site survey: it depends on the floor area and the number of points. In an apartment, the most important thing is to agree on the points before wall chasing — moving a socket after renovation will cost more than installing it in the right place from the start.

Electrical installation in a house in Tashkent: the private sector

Work in a private house starts with the supply from the pole: we run the cable to the panel, install earthing and route lines to the rooms, outbuildings and outdoor lighting. In the private sector the supply is more often single-phase, so grid surges hit all the equipment at once — the fridge, the boiler and the pump fail simultaneously. We install a voltage relay at the supply, circuit breakers for each group and a separate line for outdoor lighting with moisture protection. For outdoor use we take cable in corrugated conduit or armoured cable, and for outbuildings — cable with double insulation. We make the earthing as a loop of three rods or connect to an existing one. For the private sector, earthing and a voltage relay are critical: with a single-phase supply from the pole, grid surges hit all the equipment at once.

Electrical installation in an office: load and continuity

Office zone Line cross-section Protection
Workstations 2.5 mm² 16 A circuit breaker per group
Server room 4 mm² 30 mA RCD + voltage relay
Climate control equipment 4 mm² 25 A circuit breaker
Lighting 1.5 mm² 10 A circuit breaker
Kitchen and coffee area 4 mm² 30 mA RCD
Office panel — Main circuit breaker + RCD

In an office we run separate lines for workstations, the server room and climate control equipment, so that the load does not drag down a single group. We plan office work by zones so that some of the premises remain operational — a full shutdown is only needed at the stage of connecting the panel.

Timelines, a 2-year warranty and how we control quality

We fix the scope and timelines in the estimate before work begins, and after handover we are responsible for the result under the contract. Below — how we plan the schedule, what the two-year warranty covers and who exactly carries out the installation.

Wiring replacement timelines and how we plan them

We complete a standard apartment within a few working days, a private house and an office take longer, and we fix the exact timeline in the estimate after the inspection. The inspection takes about an hour: the technician counts the connection points, assesses the wall material and the condition of the incoming cable, after which a specific handover date appears in the estimate. The timeline is affected not by the floor area but by the number of points and the density of the walls: in a concrete slab, chasing is two to three times slower than in brick or gypsum block, and hidden cable routing in panel buildings adds a day or two for passing through load-bearing sections. In search, clients often type "wiring replacement Tashkent" — and land on our page, so we break down the timelines by stage. We agree on the estimate and schedule in writing so that the date does not shift during the work. Request a breakdown of timelines by stage — that way you can see at which step a delay is possible and how it is compensated.

2-year warranty on work and materials

We give a 2-year warranty on electrical installation work: it covers both the work and the installed equipment — circuit breakers, RCDs, voltage relays, RCBOs. The terms are set out in the contract: a warranty case is documented by an act and a receipt, and the technician's visit for diagnostics is included in the service. The two-year term applies to the assembly of the distribution board, the connections in the junction boxes and the socket group lines, not just the visible part. The warranty is valid as long as the board remains accessible and is not reworked by a third-party technician — otherwise it is impossible to confirm the cause of the fault. Keep the act and do not seal the junction boxes shut: access to them is needed both for the warranty inspection and for checking the connections after a few years.

Our own technicians and payment via Click, Payme, Uzcard

  • Our own technicians: the work is carried out by Eco-Service's in-house electricians without subcontracting, so the same person who performs the installation is responsible for the quality.
  • Direct contract: the client signs the agreement directly with the contractor, not with an intermediary — there is no need to look for a subcontractor down the chain.
  • Payment: we accept via Click, Payme, Uzcard and Humo, in cash or by transfer to an account; we issue a receipt for the entire scope of work.
  • Reviews: clients leave ratings on Google Maps, Yandex.Maps and Telegram — they show the real timelines and the quality of board assembly.
  • Feedback: for a warranty request we visit within the period agreed in the contract, and we carry out diagnostics and replacement of the faulty element at no extra charge.

Conclusion

Electrical installation is work where every calculation error becomes visible not immediately, but after months of overheating and failures. Below — brief conclusions that will help you make a decision before work begins.

Key takeaways

  • Cable: aluminium wiring older than 25-30 years is replaced with copper — it does not handle the load of modern appliances and heats up at the twists.
  • Calculation: the core cross-section and the rating of the circuit breaker are selected for the load of each line separately, not "by eye" and not on the principle of "the thicker, the better".
  • Routing: the method — chasing, corrugated conduit or cable duct — is chosen according to the type of walls (brick, panel, drywall) and plans for the final finish.
  • Property: in an apartment, house and office the scope of work differs — from wiring distribution across rooms to the incoming supply from a pole and separate zones for the server room and air conditioners.
  • Documents: a fixed estimate before the start and 2-year warranty obligations protect against additional charges during the process and rework after handover.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
5 окт. 2026
I ordered wiring replacement in the apartment, everything was done neatly and quickly. 2-year warranty, very satisfied!
ЕВ
Елена В.
2 окт. 2026
I ordered wiring replacement in a private house, the masters arrived on time, they work cleanly. The cost is calculated after diagnostics, but the result is excellent.
ШТ
Шухрат Т.
29 сен. 2026
I changed the wiring in the office, everything went smoothly, no problems. The price depends on the scope of work, but the quality is top-notch.
ОС
Ольга С.
27 сен. 2026
I ordered wiring replacement in a new building, the electricians are professionals, they did everything in a day. 2-year warranty, I recommend!
БР
Бекзод Р.
16 сен. 2026
I ordered wiring replacement in an old house, the wires were in terrible condition. The masters fixed everything, now I don't worry about safety.
НМ
Наталья М.
29 авг. 2026
I ordered wiring replacement in an apartment, very pleased with the work. Everything is neat, without dust and dirt.
ТА
Тимур А.
25 авг. 2026
I ordered wiring replacement in a cottage, everything was done with quality and on time. The cost is calculated after diagnostics, but it's worth it.
ИП
Ирина П.
6 авг. 2026
I ordered wiring replacement in a two-room apartment, the masters are polite, explained everything. 2-year warranty, I'm confident in the result.
РШ
Рустам Ш.
5 авг. 2026
I ordered wiring replacement in a store, they worked quickly and professionally. The price depends on the scope of work, but the result exceeded expectations.
АК
Анна К.
3 авг. 2026
I ordered wiring replacement in a country house, everything was done turnkey. Very satisfied, thank you!
ДБ
Джасур Б.
24 июл. 2026
I ordered wiring replacement in the apartment, the old wires were sparking. The masters arrived the same day and fixed everything. 2-year warranty.
МЛ
Марина Л.
15 июл. 2026
I ordered wiring replacement in a three-room apartment, the work was done excellently. The cost is calculated after diagnostics, but the price is reasonable.
СИ
Санжар И.
14 июл. 2026
I ordered wiring replacement in a new building, the electricians did everything neatly and quickly. I recommend!
ТН
Татьяна Н.
8 июл. 2026
I ordered wiring replacement in the private sector, the masters are professionals in their field. 2-year warranty, very satisfied.
ФЮ
Фарход Ю.
7 июл. 2026
I ordered wiring replacement in the garage, everything was done with quality. The price depends on the scope of work, but the result is excellent.
ЮГ
Юлия Г.
5 июл. 2026
I ordered wiring replacement in the apartment, I was very worried, but the masters calmed me down and did everything perfectly. Thank you!
ТН
Тимур Н.
2 июл. 2026
Very polite master, explained everything about wiring replacement. I recommend to friends.
АТ
Алмас Т.
17 июн. 2026
Reasonable prices for wiring replacement, no markups. Everything is fair.
ВЛ
Виктор Л.
25 мая 2026
I contacted them for wiring replacement, they did it quickly and with quality. I recommend.
БМ
Бекзат М.
15 мая 2026
I ordered wiring replacement — they arrived on time, did everything neatly. Satisfied!
ОВ
Олег В.
14 мая 2026
I applied for wiring replacement, it was done quickly and with quality. I recommend.
МО
Мадина О.
13 мая 2026
Excellent service! The wiring replacement was done on time, without unnecessary questions.
ДС
Дамир С.
6 мая 2026
I ordered wiring replacement — they arrived on time, everything was done neatly. Satisfied!
АМ
Алия М.
23 апр. 2026
Very polite master, explained everything about wiring replacement. I recommend to friends.
ИГ
Ирина Г.
22 апр. 2026
The wiring replacement was done faster than promised. Pleasantly surprised.
НБ
Нурлан Б.
19 апр. 2026
Good work, the masters know their business. The wiring replacement was done conscientiously.
АМ
Алия М.
17 апр. 2026
I called a master for wiring replacement — he arrived the same day, everything works.
РД
Руслан Д.
8 апр. 2026
Good work, the masters know their business. The wiring replacement was done conscientiously.
ЕК
Ержан К.
29 мар. 2026
Excellent service! The wiring replacement was completed on time, without unnecessary questions.
ЖК
Жанна К.
27 мар. 2026
Quality wiring replacement, neat and without extra mess. I will contact them again.
ВЛ
Виктор Л.
18 мар. 2026
I called a master for wiring replacement — he arrived the same day, everything works.
АТ
Айгерим Т.
6 мар. 2026
I applied for wiring replacement, it was done quickly and with quality. I recommend.
ТН
Тимур Н.
25 фев. 2026
The wiring replacement was done faster than promised. Pleasantly surprised.
АБ
Асхат Б.
11 фев. 2026
I ordered wiring replacement — they arrived on time, everything was done neatly. Satisfied!
ЕК
Ержан К.
9 фев. 2026
Very polite master, explained everything about wiring replacement. I recommend to friends.
СК
Сауле К.
1 фев. 2026
Excellent service! The wiring replacement was done on time, without unnecessary questions.
ИГ
Ирина Г.
20 янв. 2026
Very polite master, explained everything about the wiring replacement. I recommend to friends.
МА
Марат А.
19 янв. 2026
Reasonable prices for wiring replacement, no markups. Everything is fair.
МА
Марат А.
14 янв. 2026
Thank you for the wiring replacement! Fair price, excellent result.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about wiring replacement

Answers to the most popular questions from our clients

Replacement of electrical wiring in an apartment — from 1,490,000 soum; the exact amount depends on the area and the number of points.
Replacement of electrical wiring in a private house — from 1,390,000 soum; in an office — from 1,190,000 soum.
Replacing wiring in a two-room apartment usually takes 2–4 days; the master gives the exact timeframe after inspection.
Yes, a 2-year warranty applies to wiring replacement and all related work.
Yes, the visit and diagnostics are free if you agree to the repair; the technician will inspect the site and draw up an estimate.
In most cases yes, chasing walls for wiring starts from 449,000 soum, but with open laying you can do without it.
Yes, we use a construction vacuum cleaner and protective films, and we lay the cable in a corrugated sleeve or cable duct.
Yes, apartment electrical panel assembly is often required — from 799,000 soum, for a private house — from 949,000 soum.
We install circuit breakers, RCDs and RCBOs from trusted manufacturers, selecting the rating according to the load.
Clear access to walls and sockets, move furniture away from the walls and provide electricity for tools — the technician will do the rest.
Yes, we completely dismantle the old aluminum and lay copper cable with wire connections in junction boxes.
Payment is made after the work is completed in cash or by transfer; the final cost is known after the free diagnostics.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на