We will assemble a multi-level scheme so that when there is a leakage on one line, the whole house doesn't go dark: we'll separate the groups, set up selectivity and test each device under load.

Installation in 1 day
2-year warranty
12 years of experience
Examples of work — RCD installation
Shukhrat Yuldashev
Electrician
4.9
Types of services

Our RCD connection work in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Connecting an RCD to the input
Connecting an RCD to the input: we install the device first after the meter, distribute phase and neutral, and check with the "Test" button.
Дверная москитная сетка
Connecting several RCDs
Connecting several RCDs: we divide the lines into groups, power each protection separately, so that tripping one does not cut power to the whole apartment.
Сетка Плиссе
Replacing an RCD in the panel
Replacing an RCD in the panel: we remove the old device, install a new one on the same DIN rail, re-terminate the terminals and check for leakage.
Антикошка PetScreen
Installing an RCBO
Installing an RCBO: we mount leakage and overload protection in a single housing, taking up less space on the rail.
Антипыль Micro Mesh
Assembling a panel for RCDs
Assembling a panel for RCDs: we arrange the modules by groups, cut the busbars, mark the lines and label each circuit breaker.
Нестандартная москитная сетка
Relocating a panel with RCDs
Relocating a panel with RCDs: we dismantle the old box, move the modules to a new location, and extend the cable without losing protection.
Раздвижная москитная сетка
Finding false tripping
Finding false tripping: we measure leakage current along the lines and find the damaged section or a damp junction box.
Магнитная рамка
Connecting a voltage relay
Connecting a voltage relay: we install the device after the input circuit breaker and set the trip threshold for mains surges.
Сетка-штора на магнитах
Installing the input circuit breaker
Installing the input circuit breaker: we install the main switch at the input and select the rating according to the cable cross-section and load.
Pricing

Prices for RCD installation in Tashkent

Service type Description Price Warranty
RCD installation Installation of protective disconnection in the panel от 54 900 сум 2 years
RCD connection Assembling a circuit with protection от 59 900 сум 2 years
RCD replacement Dismantling the old, installing the new от 69 900 сум 2 years
RCBO installation Combined leakage protection от 79 900 сум 2 years
Input circuit breaker installation Incoming line protection от 74 900 сум 2 years
Electrical panel assembly Layout of modules in the box от 149 000 сум 2 years
Electrical panel relocation Dismantling and installation at a new location от 179 000 сум 2 years
Circuit breaker replacement in the panel Single-pole or two-pole от 64 900 сум 2 years
Circuit breaker connection Commutation of conductors in the panel от 49 900 сум 2 years
Voltage relay installation Protection against power surges от 84 900 сум 2 years
Contactor installation Power load control от 89 900 сум 2 years
Meter installation Meter installation от 119 000 сум 2 years
Meter replacement Dismantling of old, installation of new от 129 000 сум 2 years
Socket installation Installation of socket box and mechanism от 44 900 сум 2 years
Switch installation Single-gang or double-gang от 42 500 сум 2 years
Cable laying Wall chasing and line laying от 199 000 сум 2 years
Wall chasing For concealed wiring от 219 000 сум 2 years
Cable channel installation Open wiring installation от 94 900 сум 2 years
Chandelier connection Assembly and mounting of light fixture от 55 500 сум 2 years
Spotlight installation Ceiling or wall installation от 50 500 сум 2 years
Grounding installation Circuit and connection to the panel от 249 000 сум 2 years
Fault finding in the network Continuity testing and fault localization от 99 000 сум 2 years
Wiring replacement in the room Complete line replacement от 299 000 сум 2 years
Washing machine connection Separate line and socket от 109 000 сум 2 years
Electric stove connection Power line and circuit breaker от 139 000 сум 2 years
Boiler installation Connection to network and protection от 125 000 сум 2 years
Stabilizer installation Connection to input panel от 159 000 сум 2 years
Generator input installation Changeover switch in the panel от 169 000 сум 2 years
Socket replacement Dismantling and installation of mechanism от 47 500 сум 2 years
Switch replacement Dismantling and installation of the mechanism от 45 900 сум 2 years
Junction box installation Connecting and insulating conductors от 60 500 сум 2 years
Electric boiler connection Power line and protection от 135 000 сум 2 years
Timer installation in the panel Programmable control от 105 000 сум 2 years
Priority relay installation Load distribution in the panel от 115 000 сум 2 years
Pump connection Motor power supply and protection от 90 500 сум 2 years
Outdoor lighting installation Laying and connection от 189 000 сум 2 years
Motion sensor installation Connection to lighting line от 70 500 сум 2 years
Underfloor heating installation Connection to thermostat от 145 000 сум 2 years
Air conditioner connection Separate line and circuit breaker от 155 000 сум 2 years
Doorbell installation Button and unit installation от 42 900 сум 2 years
Meter panel installation Layout and connection от 179 000 сум 2 years
Input cable replacement Laying a new incoming line от 219 000 сум 2 years
Electric vehicle socket installation Power line and protection от 349 000 сум 2 years
Protection unit installation Module connection in the panel от 94 900 сум 2 years
Hob connection Power line and circuit breaker от 159 000 сум 2 years
Transformer installation Voltage drop in the network от 399 000 сум 2 years
Emergency shutdown button installation Connection to the power circuit от 54 900 сум 2 years
Compressor connection Motor power supply and protection от 279 000 сум 2 years
Cable route installation Preparing the path for the line от 69 900 сум 2 years
Phase control relay installation Three-phase network protection от 129 000 сум 2 years
Why Us

Our advantages in RCD installation

Installation in 1 day without shutting off the riser

A team of 3 electricians completes up to 6 points per shift, 92% of sites are handed over on the day of request without shutting off the riser.

2-year warranty on work and materials

Written contract with a 2-year warranty; over 12 years the share of claims did not exceed 1.8% out of 500+ completed sites.

12 years of experience in Tashkent's power grids

The master has completed 3400+ RCD installations and knows the substation schemes and typical construction mistakes of all 11 districts of the city.

500+ sites across Tashkent and the region

Among them are 180 apartments, 140 private houses, 90 offices and 60 shops; 96% of clients return again.

3-stage check before handover

Loop resistance measurement, test with the "Test" button and 30 mA leakage current — 3 protocols in hand, 100% of points are checked.

10% discount when ordering from 3 points

The discount stacks with a free visit by a surveyor within 60 minutes across Tashkent and applies to the entire scope of work.

Selection of an RCD for the site's load

We calculate the leakage current based on 4 network parameters, set the rating at 16–63 A, and eliminate false tripping in 98% of cases.

Protection against electric shock and fire

A 30 mA RCD trips in 0.03 seconds, reduces the risk of wiring ignition and protects 100% of household appliances.

Process

Order stages

01

Accepting the request

Consultation by phone, clarification of the address and a convenient visit time. We record the task and select a specialist.

02

Diagnostics of the panel

The master inspects the electrical panel, checks the condition of the wiring and determines the place for installing the RCD. We agree on the solution with you.

03

Selection of the device

We select an RCD for your load and network scheme. We explain why exactly this rating and type were chosen.

04

RCD installation

We carefully install the device on the DIN rail, connect it according to the scheme, check the terminals and the reliability of the contacts.

05

Operation check

We test with the "Test" button, measure the network parameters, and make sure the protection trips correctly.

06

Handover and warranty

We show the result and give operating recommendations. The work is covered by a 2-year warranty.

Team

Our RCD installation specialists

Абдуллаев Шухрат

Abdullaev Shukhrat

Electrical installer

12 years of experience
191 reviews 4.9
Юлдашев Дилшод

Yuldashev Dilshod

Electricity metering specialist

18 years of experience
175 reviews 4.9
Смирнова Елена

Smirnova Elena

Service center administrator

9 years of experience
220 reviews 4.7
Рахимов Фарход

Rakhimov Farkhod

Power engineer

17 years of experience
106 reviews 4.8
Каримов Бахтиёр

Karimov Bakhtiyor

Meter replacement master

12 years of experience
129 reviews 4.9
Кузнецова Ольга

Kuznetsova Olga

On-site service coordinator

10 years of experience
149 reviews 4.7
Тошматов Санжар

Toshmatov Sanzhar

Electrical technician

9 years of experience
217 reviews 4.9
Мирзаев Азиз

Mirzaev Aziz

Customer relations manager

18 years of experience
152 reviews 4.8
Cases

RCD installation cases

Установка рамочной сетки
Installing an RCD in an apartment panel
54,900 sum
2 year warranty
Problem
When touching the body of the washing machine, you get an electric shock, and the circuit breakers do not trip.
Diagnostics
There is no residual current device, and the body of the household appliance is not grounded.
Solution
We installed a 30 mA RCD in the existing electrical panel and connected it to the neutral and phase busbars.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.9
Установка дверной сетки
Connecting an RCD after rewiring
59,900 sum
2 year warranty
Problem
After the renovation in the room, no RCD was installed; the sockets are without protection.
Diagnostics
The new line has been laid, but the protective module is not connected to the network.
Solution
We connected the RCD to the input circuit breaker and the load, and checked operation with the "Test" button.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
4.8
Установка сетки Антикошка
Replacing a faulty RCD in the panel
69,900 sum
2 year warranty
Problem
The RCD periodically cuts off the lights for no apparent reason.
Diagnostics
The RCD contacts are burnt, and the tripping mechanism is jammed.
Solution
We removed the old RCD, installed a new one, and checked the insulation and operation of the protection.
Смирнова Елена
Smirnova Elena
Service center administrator
4.9
Нестандартная сетка
Installing an RCBO instead of a combination
79,900 sum
2 year warranty
Problem
There is not enough space in the panel for a separate circuit breaker and RCD.
Diagnostics
A compact solution is required for protection against leakage and overload.
Solution
We installed an RCBO combining the functions of a circuit breaker and an RCD, and connected the line.
Рахимов Фарход
Rakhimov Farkhod
Power engineer
4.7
Раздвижные сетки
Installation of an input circuit breaker with an RCD
74,900 sum
2 year warranty
Problem
When powerful appliances are turned on, the breakers trip throughout the entire apartment.
Diagnostics
The input circuit breaker is not rated for the total load, and there is no leakage protection.
Solution
We installed an input circuit breaker with an RCD and distributed the load into groups.
Каримов Бахтиёр
Karimov Bakhtiyor
Meter replacement technician
5.0
Сетка Антипыль
Assembling an electrical panel with an RCD
149,000 sum
2 year warranty
Problem
The old panel is loose, the circuit breakers spark, and there is no RCD.
Diagnostics
A complete replacement of the panel is required, with an RCD installed for each group.
Solution
We assembled a new panel, installed the RCD, circuit breakers, busbars, and connected all the lines.
Кузнецова Ольга
Kuznetsova Olga
On-site service coordinator
4.9
Перетяжка полотна
Relocating an electrical panel with an RCD
179,000 sum
2 year warranty
Problem
The panel is in the way of the renovation, and access to the RCD is difficult.
Diagnostics
The panel needs to be moved to another location while preserving all protective devices.
Solution
We moved the panel, extended the cables, installed the RCD in the new location, and checked operation.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.8
Сетка Плиссе
Replacing a circuit breaker in a panel with an RCD
64,900 sum
2 year warranty
Problem
The circuit breaker in the panel does not trip on overload, and the RCD trips falsely.
Diagnostics
The circuit breaker has failed; the RCD is working properly.
Solution
We replaced the circuit breaker and checked that it works correctly with the RCD.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
5.0

RCD installation in Tashkent by Eco-Service: wiring diagrams, device selection and protection without false tripping

Why an RCD in an apartment and house: what it really protects

An RCD is not a "second circuit breaker", but protection against current leakage to the enclosure and through a person. Let's look at what it catches and what it doesn't, why a circuit breaker won't save you without it, and why the device sometimes trips for no reason.

What an RCD is and how it differs from a circuit breaker

An RCD trips on the difference in currents between phase and neutral — from 10 to 300 mA, whereas a circuit breaker responds only to overload and short circuit. Inside the device there is a differential transformer: it compares the current that went into the load with the current that came back. If the difference exceeds the setpoint, the contacts open within 20-40 milliseconds. A modular circuit breaker is designed differently: the entire line current passes through it, and it trips on a thermal or electromagnetic release at 16-40 amperes. Installing a protective device does not replace a circuit breaker — they are two different devices in one panel. A circuit breaker will not "see" a 30 mA leakage through a person: this current is enough to stop the heart, but not enough to trip short-circuit protection, so during installation, install a "circuit breaker + RCD" pair rather than choosing one of the two.

What an RCD protects against, and what it doesn't

  • Protects against leakage to the enclosure: if insulation breaks down to the metal enclosure of a washing machine or water heater, the device will disconnect the line before contact occurs.
  • Protects a person: a current of 30 mA is life-threatening, and an RCD with such a setpoint opens the circuit in fractions of a second.
  • Protects against leakage to ground: if a cable gets wet or insulation is damaged in a wall, the differential current is detected and the line is disconnected.
  • Does not protect against overload: if the total power of the appliances exceeds the rating of the line, the RCD will not respond — the wire will heat up and melt until a fire starts.
  • Does not protect against short circuit: in the event of a short circuit, the device will fail before it disconnects the line, which is why in a panel they always work as a pair with a circuit breaker.

Why an RCD trips falsely and how to fix it

When our technician arrives, the first thing he checks is the total leakage current on the line: most often the cause is old wiring, a damp cable, or several RCDs with the same rating in one panel. In Tashkent apartments in old housing stock with aluminum wiring, accumulated leakage through the insulation often reaches 15-20 mA — that is half the setpoint, and any additional appliance "pushes" it up to tripping. A damp cable in the bathroom or kitchen causes leakage spikes in wet weather, and two devices with a 30 mA setpoint in one panel trip one after another for no apparent reason. The RCD connection diagram with grounding also matters: if there is no grounding conductor, the leakage looks for a path through the neutral wire and behaves unstably. If the RCD "trips" without a load, it is almost always accumulated leakage through the insulation, not a failure of the device itself; replacing the RCD will not help here — the line needs to be inspected.

How to choose an RCD for an apartment, house and wet areas

The rating and leakage current are selected for the load and purpose of the line. Below are working combinations that we use in Tashkent apartments and private houses.

Leakage current and rating: what values to set for groups and for the incoming line

Line / zone Leakage current Rating What it protects
Incoming line to the apartment 100 mA 40A The whole house, selectivity with groups
Socket groups 30 mA 16A People and appliances on each line
Bathroom, kitchen, boiler 10 mA 16A Wet areas where the risk of contact is high
Washing machine 10 mA 16A Pump, heating element, leakage to the body
Air conditioner, boiler 30 mA 25A Inverter appliances, heavy load

We select the rating for the load of each group separately: on the incoming line of a capital apartment with an electric stove and boiler this is more often 40A, while 16A is sufficient for a lighting line. Installing a 30 mA RCD on the incoming line is a typical mistake: at the slightest leakage on any line the entire apartment will trip, not just one group.

Type AC or A: when each is needed

Type AC responds only to alternating leakage current, while type A also responds to pulsating direct current, which is produced by washing machines, inverter air conditioners and appliances with switched-mode power supplies. In apartments with new appliances, type AC is formally permitted by the standards, but switched-mode power supplies create a leakage of the direct component, to which type AC does not respond — the zone remains unprotected. Type A closes this blind spot: it catches the pulsating current from variable-frequency drives, LED drivers and laptop chargers. Installing an RCD on lines with a washing machine, dishwasher or inverter air conditioner pays for itself faster than repairs after a leakage. For lighting groups and simple sockets without powerful electronics, type AC remains a workable option.

RCD or RCBO: what to install in the panel

Criterion RCD + circuit breaker RCBO
Space on the DIN rail 3 modules 2 modules
Tripping diagnostics Visible: leakage or overload Does not separate the cause
Selectivity in a cascade Configured flexibly Limited
Repairability One module is replaced The whole unit is replaced

We install an RCBO as an alternative to the RCD + circuit breaker combination when there is little space in the panel or there is only one line. For a complex panel with a cascade and several groups, we choose the "RCD + circuit breaker" pair: when it trips, it is immediately clear what happened — leakage or overload — and finding the cause takes minutes, not hours. An RCD circuit breaker connection in a single housing simplifies the circuit but complicates diagnostics — this compromise should be evaluated by the number of groups, not by the price of the device.

Connection diagrams: single-phase network, circuit breaker and grounding

The order of elements in the panel and the neutral connection point determine whether the RCD will trip at all. Let's look at working diagrams for a single-phase network and the specifics of two-wire wiring in old housing stock.

Connecting the RCD and circuit breaker: order in the panel

  • Step 1: the main circuit breaker is installed first on the DIN rail — it protects the entire downstream circuit from overload and short circuit.
  • Step 2: immediately after the main circuit breaker, the RCD is mounted, to which the phase and working neutral from the meter are connected.
  • Step 3: from the RCD output, the neutral goes to a separate neutral busbar that is not connected to the panel's common N busbar.
  • Step 4: group circuit breakers are installed after the RCD, each on its own line: sockets, lighting, wet zone.
  • Step 5: the PE busbar runs separately from the entire path and is not broken by any device in the panel.
  • Step 6: the connection of the circuit breaker and RCD is checked with a tester before applying load, and the neutral after the RCD is never connected to the panel's common neutral.

Connecting an RCD with grounding: TN-C-S and TN-S diagrams

In TN-C-S and TN-S systems, the protective conductor is routed to a separate busbar and does not pass through the device, and its operability after installation is checked with the "T" button. In the TN-C-S diagram, the neutral and protective conductors are separated at the building's service entrance, after which the PE runs as an independent core to sockets and appliance enclosures. In the TN-S system, both conductors are separated along the entire length of the line from the substation, which provides the most stable grounding loop. The "T" test button simulates a leakage and should disconnect the device within fractions of a second — if this does not happen, the circuit is wired incorrectly. The device will also trip without grounding, but only when a person touches a live part, whereas with a PE conductor it will disconnect the line earlier — when insulation breaks down to the appliance enclosure.

What to do in a two-wire network of old housing stock in Tashkent

In homes with a two-wire network without a PE conductor, Eco-Service installs 30 mA RCDs on groups and 100 mA at the service entrance — the device will protect against leakage through a person even if there is no grounding in the apartment. In Tashkent's khrushchyovkas and panel buildings of the 1960s-1980s, there is no grounding conductor in the riser, and it is impossible to restore it without reconstructing the riser. In such a situation, the RCD remains the only working protection: it detects the current difference between phase and neutral and disconnects the line within 0.03 seconds when there is leakage to the appliance enclosure. You must not "borrow" the neutral instead of ground or install a neutral-to-ground jumper in the socket: this does not create protection but makes appliance enclosures dangerous if the neutral breaks — a phase potential appears on them.

Connecting an RCD in a three-phase network

In a three-phase network, Eco-Service installs a four-pole RCD: three phases and neutral pass through it, and the load across the phases must be distributed evenly, otherwise the device will trip for no reason. Phase imbalance above the norm causes false tripping even on a working device, so installing an RCD in a private house with a three-phase service entrance begins with measuring the current on each phase. The technician checks the load distribution before installation and, if necessary, moves groups between phases so that the current difference does not exceed the permissible value.

Several RCDs in a panel: cascade and selectivity

When there is more than one RCD in a panel, it is important that when a leakage occurs on one line, only that line is disconnected. This is selectivity — let's look at how to achieve it.

Why several RCDs are needed and how the cascade works

We install a 100 mA main RCD and 30 mA group devices: when a leakage occurs on one line, only its device trips, rather than the entire apartment being disconnected. The cascade is built as follows: the main device protects the supply line from total leakage, while the group devices protect each line separately. For a kitchen with a wet zone, a washing machine and a boiler, separate 30 mA devices are installed, while lighting and room sockets get their own. In a private house, a line for the yard and a pump station are added, and the number of devices grows along with the number of independent consumers on the DIN rail. Installation in such a panel is not about the number of devices, but about logic: each one protects its own section of the circuit. Without a cascade, a single device for the whole panel turns any minor leakage into a complete shutdown — with a cascade you lose one line, not the lights in the whole house.

Selectivity: how to stagger the ratings by level

Level Leakage current Type What it disconnects
Main 100 mA S (with delay) The entire apartment or house
Group (kitchen, bathroom) 30 mA AC or A One wet line
Group (rooms, lighting) 30 mA AC Sockets or lighting
Dedicated (boiler, pump) 10-30 mA A Only that appliance

The rule for staggering is simple: the leakage current of the main device must be at least 3 times higher than that of the group device, and in terms of tripping time the main device is chosen as type S or with a delay. If the main and group devices have the same leakage current, both will trip in the event of a fault — selectivity without staggered ratings does not work, even if there are two devices. This can only be verified by measuring the leakage current on each line before assembling the panel.

Connecting several RCDs in a panel: practical limitations

  • Space on the DIN rail: a standard 12-module box holds 4-5 devices together with circuit breakers, so a cascade often requires a 24-module panel.
  • Accumulated leakage: each line produces 0.5-2 mA of natural leakage, and with 8-10 groups the total approaches the threshold of the main device.
  • Two-wire network: in old housing stock without grounding, a cascade is assembled only after insulation testing, otherwise the devices trip for no reason.
  • Insulation audit: on lines older than 15 years, resistance measurement shows which groups cannot be included in a common cascade without repair.
  • Distribution across phases: in a three-phase panel, a separate main device is installed for each phase, otherwise load imbalance causes false tripping.

RCD installation: stages of work and what the service includes

Installing a protective device is not "putting a little box on a rail," but diagnosing the panel, selecting the device, installing it, and testing it under load. We show how the process goes from inspection to live testing.

Panel diagnostics before installation

  • Network diagram: an Eco-Service technician travels to the site in Tashkent and first of all determines the grounding system — TN-C-S, TN-S, or two-wire — because the correctness of the entire circuit depends on it.
  • Insulation: measuring resistance with a megohmmeter reveals background leakage, due to which the new device will start tripping immediately after being switched on.
  • Load distribution: we record which groups are powered from the panel, their total current, and cable cross-sections — this is the basis for selecting the rating.
  • Busbars and circuit breakers: we assess the condition of the neutral busbar, terminal heating, and free space on the DIN rail for the new module.
  • Grounding: we check the ground loop and the quality of the connection — without a working PE, protection of people will not operate.

RCD installation: step-by-step order of work

  • Step 1: we shut off the incoming supply and use a tester to make sure the voltage is removed.
  • Step 2: we mount the device on the DIN rail, placing it in a row with the circuit breakers according to the panel diagram.
  • Step 3: we connect the device — we route phase and neutral strictly according to the terminal markings, without confusing input and output.
  • Step 4: we tighten the terminals to the specified torque with a torque screwdriver, not "by feel."
  • Step 5: we apply power and press the "T" test button — the device must trip.
  • Step 6: we load the line and repeat the test with a multimeter and clamp meter.

What the service includes and what additional work may be needed

  • Included: panel diagnostics, selection of the device rating and type, mounting on the rail, RCD connection, and testing under load.
  • Included: marking of the lines and a photo report of the assembled unit for the owner.
  • Additional: assembly of the electrical panel if the enclosure is old or there are not enough modules.
  • Additional: installation of a main circuit breaker if outdated protection is installed at the incoming supply.
  • Additional: cable routing or wall chasing when there is no dedicated line to the panel.

Replacing an old RCD and related work in the panel

We replace outdated RCDs, as well as install RCBOs, voltage relays, contactors, and meters — work in a single panel is done in one visit. Replacing an RCD without checking the paired circuit breaker and the condition of the neutral busbar is not advisable: the new device will operate in the same circuit as the broken old one and will repeat its behavior at the very first leakage. Before replacement, the technician checks the tightening torque on adjacent terminals and the integrity of the neutral busbar — otherwise tripping will recur on the new module.

Warranty, safety, and why installation is trusted to a professional

A protective device means safety: an installation error does not show up immediately, but it is exactly what determines whether the protection will trip or not. That is why the warranty and the contractor's responsibility matter.

2-year warranty on work and what it covers

Eco-Service provides a 2-year warranty on completed RCD installation and connection work — including the correctness of the circuit, the quality of the contacts, and the operability of the device after installation. The warranty period covers the connection of the RCD and circuit breakers in the panel, tightening of terminals with a torque wrench at the torque specified in the manufacturer's data sheet, and testing with the test button under load. In the work completion certificate we record the initial condition of the wiring: insulation resistance, presence of a grounding conductor, and the condition of the neutral busbar before any intervention. The warranty does not cover false tripping caused by the customer's old wiring — that is why diagnostics before installation are recorded in the certificate, so that there are no disputed situations later.

Own service center in Tashkent and on-site visits by a technician

Eco-Service has its own service center in Tashkent: a technician travels to the site, and device acceptance and panel consultations are done in person, without intermediaries or subcontractors. On site, the master electrician takes measurements with a multimeter and clamp meter, checks the selectivity of the cascade, and tests each device with the "Test" button under working load. The RCD installation is performed by the same specialist who is then responsible under the warranty — not a separate subcontractor crew. The direct provider of the service is fully responsible for the result: in a disputed situation, there is no need to figure out who exactly — the "installer" or the "supplier" — made the error in the circuit.

Typical mistakes of DIY RCD installation

  • The neutral after the RCD is connected to the panel's common neutral: the device trips immediately when switched on, and the person considers it faulty.
  • The RCD is installed without a paired circuit breaker: in the event of a short circuit, the device fails, and the line remains without protection until replacement.
  • Phase and neutral are swapped at the input: the test button does not trip, and the leakage protection does not work at all.
  • Terminals are tightened insufficiently: the contact heats up, the insulation melts, leakage current increases, and the protection trips for no reason.
  • Grounding is connected to the neutral busbar: the device enclosure ends up energized, and the RCD stops distinguishing real leakage.

Conclusion

We have gathered the main points that determine the outcome of leakage current protection work: selecting the rating, the circuit in the panel, and testing after installation. Below are the conclusions worth keeping in mind before placing an order.

Main conclusions

  • Protection against leakage, but not against overload: an RCD responds to the difference in currents between phase and neutral, while protection against overload and short circuit is provided only by the circuit breaker paired with it.
  • Rating according to the purpose of the line: 10 mA is installed for wet areas, 30 mA for socket and lighting groups, and 100 mA for the incoming line, and the connection of the RCD with the circuit breaker is selected so that the breaker comes first on the phase.
  • A cascade provides selectivity: an incoming device rated 100 mA and group devices rated 30 mA with staggered ratings disconnect a single line rather than the entire apartment at once.
  • Two-wire network without PE: the device continues to protect a person from leakage to the enclosure, but using neutral instead of ground is absolutely unacceptable.
  • Testing with the "T" button: correct installation is confirmed with the test button under working load — without this check, the work is not considered completed.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
9 окт. 2026
They installed the RCD in the panel in a couple of hours, everything was neat and clearly explained. Now I'm calm about the safety of the house, 2-year warranty.
ДР
Дилноза Р.
5 окт. 2026
I ordered RCD installation in the apartment, the master arrived on time and did everything cleanly. Very pleased that the wiring is now protected.
СМ
Сергей М.
3 окт. 2026
I needed an RCD for the dacha — they installed it quickly, checked for leakage. Works great, I recommend.
ГТ
Гулноза Т.
28 сен. 2026
We installed an RCD in a new building, didn't damage the wall chases, connected everything to the panel. The price was calculated after inspection, no surprises.
ТА
Тимур А.
20 сен. 2026
The master correctly selected an RCD for my load and installed it in the electrical panel. Now the washing machine and boiler are protected.
ЕВ
Елена В.
19 сен. 2026
Called an electrician to install an RCD — he arrived the same day, did everything quickly and without mess. 2-year warranty, which is pleasing.
БН
Бекзод Н.
13 сен. 2026
They installed an RCD at the house input and also checked the grounding. Satisfied with the work, the price depends on the scope of work.
НС
Наргиза С.
20 авг. 2026
I ordered RCD installation for the bathroom, the master explained everything and showed how to test with the button. I feel calm about the children.
РШ
Рустам Ш.
2 авг. 2026
The RCD installation took less than an hour, connected to the old panel without modifications. Everything works, thank you.
ОП
Ольга П.
1 авг. 2026
The specialist installed the RCD and also replaced the circuit breaker that was sparking. Neatly, quickly, 2-year warranty.
ШЮ
Шухрат Ю.
28 июл. 2026
I searched for a long time for an electrician who would properly install an RCD — here everything was done according to the diagram. Now the house is protected from leakage.
МЭ
Мадина Э.
21 июн. 2026
We installed an RCD in the kitchen for the dishwasher, hid everything in the panel. Very neat work.
ИЛ
Игорь Л.
3 июн. 2026
I ordered RCD installation after a voltage surge, the specialist arrived with equipment and installed everything. It works as it should.
ЗБ
Зулфия Б.
2 июн. 2026
We installed an RCD in a private house, checked every line. Pleased that leaks are no longer a concern.
ФД
Фарход Д.
19 мар. 2026
The RCD installation was quick, the specialist gave operating tips. 2-year warranty, I will come back again.
НГ
Наталья Г.
2 мар. 2026
I called a master for RCD installation, he arrived exactly on time, did everything cleanly. The price was discussed after diagnostics.
ЕР
Елена Р.
25 фев. 2026
They did the RCD installation faster than promised. Pleasantly surprised.
МО
Мадина О.
7 фев. 2026
They did the RCD installation faster than promised. Pleasantly surprised.
МА
Марат А.
3 фев. 2026
Good work, the craftsmen know their business. The RCD installation was done conscientiously.
СШ
Сергей Ш.
28 янв. 2026
They did the RCD installation faster than promised. Pleasantly surprised.
АФ
Анна Ф.
25 янв. 2026
They did the RCD installation faster than promised. Pleasantly surprised.
МА
Марат А.
19 янв. 2026
I contacted them for RCD installation, they did it quickly and with quality. I recommend.
СК
Сауле К.
13 янв. 2026
Called a specialist for RCD installation — he arrived the same day, everything works.
СШ
Сергей Ш.
8 янв. 2026
I called a master for RCD installation — he arrived the same day, everything works.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about RCD installation

Answers to the most popular questions from our clients

RCD installation starts from 54,900 sum; the exact cost depends on the type of panel and the number of lines.
RCD installation usually takes 30–60 minutes if the panel is already mounted and there is access to the wiring.
Yes, RCD installation comes with a 2-year warranty, including the work and connection.
Yes, the technician comes to install the RCD within the city; diagnostics and the visit are free if you agree to the repair.
We install RCDs from trusted brands, selecting the rating to match your load and panel scheme.
Clear access to the electrical panel and warn your household members about the power being cut off during the RCD installation.
Yes, you can pay for RCD installation in cash or by card immediately after the work is completed.
RCD installation is the mounting of the device in the panel, while RCD connection starts from 59,900 sum, when the device is already secured and the lines need to be connected.
Usually the master arrives to install the RCD on the day of the request or the next day at a convenient time.
After installing an RCD, tripping is most often caused by current leakage or a wiring error — the master will check the lines and eliminate the cause.
Yes, RCD installation is carried out both in apartments and in private houses, including distribution boards.
RCD installation includes selecting the rating, mounting on a DIN rail, connecting, and testing tripping under load.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на