Ремонт техники Специалисты Строительство и ремонт Другое Страны

Electric meter installation master in Tashkent

Installation of electricity meters Tashkent

Visit and diagnostics free of charge, installation in one visit, 2-year warranty on work and connection to the grid.

24/7 acceptance of requests
Service life 25 years
Installation in 90 minutes
Maksud Matkurbanov, Senior electrician
Maksud Matkurbanov
Senior electrician
4.38
Types of services

Our electricity meter installation services in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Installation of a single-phase meter
Installation of a single-phase metering device in an apartment or private house with connection to the existing line
Дверная москитная сетка
Installation of a three-phase meter
Installation of a three-phase meter for a house with a heavy load and three-phase input
Сетка Плиссе
Replacement of an old meter
Dismantling of the worn-out device and installation of a new one in its place while preserving the circuit
Антикошка PetScreen
Relocation of the electricity meter
Relocation of the metering unit to another place in the room or to the facade while preserving the connection
Антипыль Micro Mesh
Installation on a DIN rail
Mounting the meter on a DIN rail inside the panel with fixation and connection to the busbars
Нестандартная москитная сетка
Installation on a pole
Installation of a metering device on a power line pole for the private sector and garden plots
Раздвижная москитная сетка
Connection to the grid
Connecting the meter to the supply grid with phasing and tightening of the terminals
Магнитная рамка
Installation of the input cable
Routing and connecting the input cable to the meter terminals with crimping of the lugs
Сетка-штора на магнитах
Assembly of the electrical panel
Layout and assembly of a panel for the meter with circuit breakers, busbars, and spaces for modules
Pricing

Prices for electricity meter installation in Tashkent

Service type Description Price Warranty
Installation of a single-phase electricity meter Standard metering device, apartment от 149 000 сум 2 years
Installation of a three-phase electricity meter Industrial metering, private house от 349 000 сум 2 years
Replacement of an old electric meter Dismantling and installation of a new one от 199 000 сум 2 years
Relocation of the electricity meter Changing the installation location of the device от 249 000 сум 2 years
Installation of an electric meter on a DIN rail In the panel, quick installation от 179 000 сум 2 years
Installation of an electric meter on a pole Overhead line, outdoor option от 299 000 сум 2 years
Connecting the electricity meter to the grid Connection to the input cable от 219 000 сум 2 years
Installation of the input cable to the meter Laying and connection от 279 000 сум 2 years
Assembly of an electrical panel for the meter Layout of modules and circuit breakers от 399 000 сум 2 years
Installation of a circuit breaker Line protection after the meter от 159 000 сум 2 years
Installation of an RCD paired with the meter Differential protection от 239 000 сум 2 years
Laying the cable to the meter Chasing and laying от 319 000 сум 2 years
Checking the meter connection diagram Monitoring the correctness of installation от 139 000 сум 2 years
Test run after installation Load application, measurements от 129 000 сум 2 years
Configuration of a multi-tariff meter Programming of tariffs от 259 000 сум 2 years
Checking the operation of the counting mechanism Disc rotation control от 135 000 сум 2 years
Meter installation with complete panel replacement Dismantling of the old, assembly of the new от 649 000 сум 2 years
Turnkey installation of a three-phase metering unit Cable, panel, meter, circuit breakers от 949 000 сум 2 years
Relocation of the metering unit with cable rerouting New location, full installation от 749 000 сум 2 years
Why Us

Our advantages in electricity meter installation

Installation in 90 minutes

A team of 2 masters installs and connects the meter in 90 minutes, the average downtime without electricity is no more than 2 hours.

Experience over 10 years

We have been working with metering devices in Tashkent for more than 10 years: 6 specialized permits, 14 trained electrical installers on staff.

More than 3000 installations

Over 3000 installed meters, of which 62% are in private houses and 38% in apartments and offices throughout Tashkent.

Accepting requests 24/7

The dispatcher accepts requests around the clock: 97% of inquiries are processed within 15 minutes, we agree on a convenient time for the visit.

Service life 25 years

We install devices with a service life of 25 years and accuracy class 1.0 — the verification interval is 16 years without equipment replacement.

10% discount

A 10% discount applies when ordering 2 or more meters or on a repeat request: 4 out of 10 clients return to us again.

Sealing on the same day

We seal and process documents on the day of installation: 100% of facilities are handed over with an act and a mark within 24 hours.

Official contract

We work under a contract with legal entities and individuals: 100% of facilities are closed with a work completion act, all masters are on staff.

Process

Order stages

01

Request and consultation

We accept the request, clarify the type of facility and preferences. We agree on a convenient time for the specialist's visit.

02

Diagnostics and measurements

The master inspects the panel, checks the wiring and load. Selects a meter model for your tasks.

03

Approval of works

We fix the list of works and the final cost after diagnostics. The client approves the plan before installation begins.

04

Meter installation

We install the device, connect it according to the scheme, seal the terminals. We work carefully and without damaging the finish.

05

Testing and adjustment

We test operation under load, check the accuracy of readings. We show how to take the data.

06

Handover and documents

We hand over the facility, process documents for the energy supply organization. 2-year warranty on installation.

Team

Our specialists in electricity meter installation

Maksud Matkurbanov, Senior electrician

Maksud Matkurbanov

Senior electrician

5 years of experience
Ratings: 41 4.38
Ayder Abibullaev, Electrical panel assembler

Ayder Abibullaev

Electrical panel assembler

10 years of experience
Ratings: 12 4.84
Batir Safarov, Wiring technician

Batir Safarov

Wiring technician

5 years of experience
Ratings: 39 4.8
Atabek Ravanbekov, Mobile electrician

Atabek Ravanbekov

Mobile electrician

5 years of experience
Ratings: 135 4.72
Fakhriddin, Meter replacement electrician

Fakhriddin

Meter replacement electrician

6 years of experience
Ratings: 72 4.71
Khayrullo Yuldoshev, Socket and switch electrician

Khayrullo Yuldoshev

Socket and switch electrician

16 years of experience
Ratings: 18 4.62
Nurillo Olimzhonov, Lighting installation electrician

Nurillo Olimzhonov

Lighting installation electrician

10 years of experience
Ratings: 5 4.56
Shakhzod Khudoyberdiev, Distribution board electrician

Shakhzod Khudoyberdiev

Distribution board electrician

16 years of experience
Ratings: 81 4.3
Cases

Cases of electricity meter installation

Установка рамочной сетки
Replacement of an old induction meter
199,000 sum
2 year warranty
Problem
The meter spins in jerks, readings are inflated, a hum is heard under load.
Diagnostics
Wear of the mechanical disk and loosening of the terminal fastening, error above the norm.
Solution
We dismantled the old device, installed a new electronic meter, tightened the terminals, and checked the circuit.
Установка дверной сетки
Installation of a single-phase meter in an apartment
149,000 soum
2 year warranty
Problem
After renovation, the apartment has no electricity metering; a new meter is required.
Diagnostics
There is no mounting seat or connection; the incoming cable is routed without a metering device.
Solution
We installed a single-phase meter, connected it to the grid, and performed a test run.
Установка сетки Антикошка
Installation of a three-phase meter in a private house
349,000 soum
2 year warranty
Problem
When powerful appliances are turned on, the incoming circuit breaker trips; metering is single-phase.
Diagnostics
The load is distributed unevenly; the single-phase meter is not designed for the total power.
Solution
We installed a three-phase meter, connected it to the grid, and checked the operation of the counting mechanism.
Нестандартная сетка
Relocating the meter to another room
249,000 soum
2 year warranty
Problem
The meter is in a damp basement; access to the readings is difficult.
Diagnostics
The metering device is located in an inconvenient place; the cable was not routed according to the project.
Solution
We relocated the electricity meter to a dry room, extended and rerouted the cable.
Раздвижные сетки
Installing the meter on a DIN rail
179,000 soum
2 year warranty
Problem
The new meter is lying without mounting; the panel was assembled hastily.
Diagnostics
The panel has no DIN rail for the modular metering device; there is no mounting.
Solution
We installed a DIN rail, secured the meter, and connected it to the grid.
Сетка Антипыль
Installing the meter on a power line pole
299,000 soum
2 year warranty
Problem
The meter is in the house, but the metering needs to be moved to an outdoor pole.
Diagnostics
The metering device is located inside the house; access for the inspector is limited.
Solution
We mounted the meter on the pole, connected it to the grid, and checked the connection diagram.
Перетяжка полотна
Assembling an electrical panel for the meter
399,000 soum
2 year warranty
Problem
The old panel is falling apart; the circuit breakers and meter are held by the wires.
Diagnostics
The panel enclosure is damaged; the mountings and insulation do not ensure safety.
Solution
We assembled a new electrical panel and installed the meter and circuit breakers.
Сетка Плиссе
Configuring a multi-tariff meter
259,000 soum
2 year warranty
Problem
The multi-tariff meter counts at a single tariff; night readings are not recorded.
Diagnostics
The tariff zone and time settings are off; the device does not switch modes.
Solution
We configured the tariff zones and time and checked the operation of the counting mechanism.

Electric meter installation in Tashkent from Eco-Service: installation, replacement and relocation of the metering unit

What electricity meter installation work Eco-Service performs

Electricity meter installation is not a single operation, but a set of works tailored to the type of facility, the number of phases and the entry point. Below we break down the options: from a single-phase unit in an apartment to a turnkey three-phase system in a private house.

Single-phase or three-phase: which meter the facility needs

We install single-phase 220 V meters for apartments and three-phase 380 V meters for private houses with heavy loads. The rated current is selected based on the incoming circuit breaker: for an apartment with an electric stove and air conditioner this is 40-50 A, for a house with a 12 kW electric boiler and a welding machine — 63 A and above. The accuracy class for household metering is 1.0 or 2.0; for commercial facilities the energy supply organization requires 0.5S. Installing electricity meters in a Tashkent apartment with a gas water heater is done without reworking the incoming line, while for an electric boiler in the private sector a three-phase incoming line is laid at the design stage. If an electric boiler, welding or machine tools are planned in the house — lay a three-phase incoming line in advance; reworking a single-phase unit later is more expensive and requires new approval.

Installation options: DIN rail, pole, complete panel replacement

Installation option Where it is used What is included Special feature
On a DIN rail apartment, office meter, circuit breaker, panel compact, accessible for taking readings
On a pole private house, residential area box, cable, fasteners moisture protection, slack for sag
With panel replacement old housing stock, wear new panel, circuit breakers, RCD complete rebuild of the unit
Turnkey (3 phases) house with 380 V panel, incoming line, RCD, configuration ready for sealing

Outdoor pole installation requires a moisture-proof box rated at least IP54 and a cable reserve for sag — otherwise in winter the wire tightens and tears the terminals. In multi-story buildings in Chilanzar and Yunusabad, the device is more often mounted on a DIN rail in the floor panel, while in makhallas with overhead incoming lines — in a separate box on the facade or pole. When ordering electricity meter installation in Tashkent, check whether the estimate includes fasteners for the box and corrugated conduit for the incoming cable.

Replacement and relocation: when the old meter no longer fits

  • Verification interval: for single-phase devices it expires after 16 years, for three-phase — after 8, after which the readings are not accepted for metering.
  • Mechanical damage: a cracked glass, traces of terminal overheating or a broken seal — grounds for an unscheduled replacement.
  • Switching to multi-tariff metering: an old induction device does not support "day-night" zones; an electronic one with tariff functionality is needed.
  • Relocation of the metering unit: during renovation, redevelopment or moving the panel to the facade, the new location is first approved, then installed.

How electricity meter installation works: stages from request to seal

Electricity meter installation is a sequence of preparation, assembly of the metering unit, connection to the grid, and testing. Each stage is documented: the technician leaves the diagnostic results, the diagram, and the readings after the test run.

Preparation: diagnostics, diagram, and cable routing

Before starting work, we check the existing circuit with a multimeter, determine the cross-section of the incoming cable and the route to the metering unit. Diagnostics reveals the condition of the terminal block, the presence of twisted splices in the old panel, and the actual load by group. Cable routing to the meter is done in corrugated conduit or a wall chase — open wiring on the wall is acceptable, but in living rooms it is hidden in a channel so that the insulation is not damaged during renovation. Checking the circuit before work begins takes 15-20 minutes and immediately exposes a typical problem: an undersized circuit breaker rating under a heavy load. The cross-section of the incoming cable is selected to match the breaker rating, not "by eye": an undersized cross-section heats up under load and melts the meter's terminal block. At Eco-Service, diagnostics and cable routing are handled as a single stage so that we don't have to go back to the wall twice.

Panel assembly and installation of metering devices in the unit

  • Panel enclosure: selected based on the number of modules — the meter, circuit breaker, RCD, and voltage relay take up 6-9 positions on the DIN rail.
  • Protective automation: the circuit breaker is installed according to the incoming rating, the RCD — at 30 mA to protect the line from leakage.
  • DIN rail: the meter is secured to it with clips, which simplifies replacement without dismantling the entire panel.
  • Line marking: each group is labeled so that when a breaker trips, the technician and the resident can immediately see the problem area.
  • Diagram inside the panel: a single-line diagram is attached to the door — it speeds up acceptance.

Connection to the grid and test run

Connecting the electricity meter to the grid and the test run take one technician visit — usually within a working day. The wiring runs from the incoming cable through the breaker to the meter, then to the RCD and distribution groups; each terminal is tightened with a torque screwdriver, because an under-tightened contact heats up more than an overload. The test load — a kettle, heater, or welding machine — shows how the device measures inductive and active loads. After the run, we always check the metering mechanism under a real load: inductive loads and electronics are measured differently, and the discrepancy is only visible during the test. The readings and the circuit check result are recorded in a report — this document will be needed when accepting the metering unit. In search queries, clients often phrase the task differently — and land on this page, although in fact it is about a single device in a specific unit. In essence, the work in the metering unit is completed precisely by signing the report.

Approval and Sealing in "Hududiy Elekt Tarmoqlari"

Work on the metering unit is only half the battle. For the meter to be placed on the balance sheet and its readings to be accounted for, the metering unit must go through an application, acceptance, and sealing process at "Hududiy Elekt Tarmoqlari". Let's break down the procedure step by step and examine where mistakes are most often made.

Application and Documents for Installing Electricity Meters

  • Meter replacement application: submitted to the district office of "Hududiy Elekt Tarmoqlari" before work begins, with the facility address and the reason for the request.
  • Owner's passport: original and copy, plus a document for the facility — cadastral extract, lease agreement, or technical passport.
  • Subscriber's account details: number, current readings, absence of debt — the inspector verifies these against the database.
  • Technical parameters: meter type, number of phases, proposed installation location — approval depends on these.
  • Approval: after verifying the data, installation permission is issued — only with it is the work on installing electricity meters in Tashkent considered legal.

Acceptance, Commissioning Act, and Sealing

Sealing is performed by an inspector of the power supply organization after inspecting the metering unit and signing the commissioning act. The installation of electricity meters is completed precisely by this stage: until the seal is applied, the meter is not legally considered commissioned. The inspector checks the connection diagram, the integrity of factory seals, the compliance of circuit breaker ratings with the project, and the marking of the incoming cable. Based on the inspection results, a commissioning act is drawn up in two copies, a control seal is placed on the terminal cover and, if the panel is shared, on the compartment door. After installation, the documents — the act, the seal, and the updated account — remain with the subscriber; readings are calculated on their basis. In applications, clients often write briefly — electricity meter installation Tashkent — and from this wording we immediately understand that a full cycle with acceptance is needed. Through Eco-Service, the acceptance package is prepared in advance so that the inspector does not find any discrepancies. Before the inspector arrives, do not close the panel tightly — they need access to the terminal block and the manufacturer's seals.

What Is Considered Unauthorized Connection

Connecting or relocating a metering unit without an application and acceptance is considered unauthorized — even if the meter is functional and sealed by the factory. Inspectors record such cases by the discrepancy between the load at the input and the account readings: a spike in consumption without a record in the database is immediately visible. The absence of an application leads to under-metering, and under-metering leads to recalculation according to the norm for the entire period since the last inspection. The fine is charged not for the fact of the work, but for the unmetered consumption over the period — therefore a "quiet" meter relocation is almost always more expensive than legal registration through an application.

Multi-tariff metering and meter configuration

A multi-tariff device pays for itself where the main load falls on nighttime hours. Let's look at which facilities it suits and how tariff zones and the reading transmission channel are programmed.

Who benefits from a multi-tariff meter

We recommend a multi-tariff meter for facilities with nighttime load: electric boilers, underfloor heating, electric vehicle charging. In practice, a two-zone device is installed in private homes with electric heating, car washes on the second shift, and small workshops with a nighttime cycle — there, the share of consumption after 23:00 reaches 40-50% of the daily volume. In search, clients often phrase the request as installation of electricity meters — and land on this page, although what is meant is specifically a multi-tariff device with programmable zones. Configuring a multi-tariff meter takes about an hour: the technician programs the zone boundaries, checks the device's internal clock against real time, and verifies the transition between tariffs. Calculate the benefit by the share of nighttime consumption: if less than a third of the energy is consumed at night, the payback of the device will stretch over years.

Configuring tariffs and transmitting data

  • Programming zones: the technician enters the boundaries of the nighttime and daytime tariffs, checks the device's internal clock, and records the transition between zones.
  • Installing the electricity meter: in the metering unit, the device is mounted on a DIN rail or a pole, after which it is connected to the incoming cable and the circuit breaker.
  • RS-485 interface: a wired channel connects the device to a controller or the energy supply company's computer at a distance of up to 1200 meters over twisted pair.
  • GSM module: the device sends readings itself over the cellular network, and the operator collects data without a controller's visit; in a basement or a metal panel, the signal is lost, and the intervals accumulate in the device's memory until communication is restored.

Warranty, timelines and technician qualifications

Electrical installation carries risk: a mistake in connections leads to overheating, device failure and a repeat visit. That is why here we cover the warranty period, specialist certification and realistic timelines for work at the site.

2-year warranty on installation

Eco-Service provides a 2-year warranty on installation work for electricity meter installation. The two-year period covers the connections in the metering unit, mounting of the device, assembly of the panel and connection to the grid — everything that depends on the technician's hands. The warranty does not cover voltage surges in the city grid: during a spike to 380 V and above, the device's electronics burn out, and this is not a warranty case. For protection, a voltage monitoring relay is installed — it cuts power when parameters go beyond acceptable limits and costs less than a new meter. A claim is filed based on the work completion report: the technician visits, checks the connections and fixes the installation defect. Electricity meter installation — that is how clients phrase the request when they are looking for a technician, and in that same request the question of cost almost always comes up: "electricity meter installation price" is asked together with the warranty, and rightly so — ownership of the device depends not only on a one-time payment, but also on whether the work will have to be redone.

Technician certification and in-person service center in Tashkent

  • Electrical safety group: installation is carried out by technicians with certification and experience on single-phase and three-phase metering units.
  • Site visit: the specialist arrives with tools, sealing materials and consumables for the specific type of device.
  • Eco-Service in-person service center: in the capital, the metering unit can be brought in and shown in person, rather than describing the problem over the phone.
  • Disputed cases: if a defect in the device or connections is suspected, in-person diagnostics take less time than correspondence.
  • Documents: the technician prepares a work completion report — it is needed both for the warranty and for the energy supply organization.

Work completion timelines

We complete a standard meter installation in one visit, and comprehensive work involving panel replacement in two. A single-phase device on a DIN rail with a ready panel is installed in 1.5-2 hours, a three-phase unit with connection to automation and an RCD takes 3-4 hours, and a full panel replacement with relocation of the metering unit stretches over two visits. The timeline depends not only on the technician, but also on the readiness of the site: if the cable route is not prepared, cable laying and wall chasing are added to the work, which means several more hours. Installation at sites with old aluminum wiring takes longer — the incoming cable has to be replaced and the cross-section selected for the load. In practice, we recommend sending photos of the panel and incoming cable in advance: based on them, the technician will give a realistic timeline, not an average one from the price list.

Typical mistakes when installing electricity meters

Most problems with a metering unit arise not because of the device, but because of the work and the lack of coordination. Installing electricity meters without an application and acceptance is the most common reason for refusal to register. Let's look at the mistakes that cause a site not to be accepted for metering or the unit to operate unsafely.

Mistakes that will prevent the device from being accepted for metering

  • No application: installation without contacting "Hududiy elekt tarmoqlari" is treated as unauthorized connection — the unit will not be registered.
  • Broken factory seals: the terminal cover must remain sealed by the factory until the inspector's examination.
  • Panel inaccessible for inspection: if there is no free access to the terminal block, acceptance is postponed until it is redone.
  • No commissioning certificate: without a signed metering document, consumption is considered unmetered.
  • Diagram does not match the design: a discrepancy between the single-line diagram and the actual installation leads to refusal of acceptance.

Technical mistakes during installation

  • Phase and neutral swapped: the device counts correctly, but the RCD trips falsely or does not trip at all.
  • Undersized cable cross-section: the incoming wire heats up under load, the insulation melts, and the risk of fire increases.
  • No grounding: the panel enclosure and DIN rail remain energized if the insulation breaks down.
  • Loose contact at the terminals: contact resistance heats the terminal block, and the contact burns.
  • Saving on the incoming circuit breaker: a rating higher than the calculated one does not protect the line during a short circuit.
  • Laying the cable right next to the meter: interference and heating distort the readings of multi-tariff models.

Conclusion

Installing electricity meters is work where the technical part and the paperwork are directly connected: even neatly performed work will not be accepted for metering without properly completed documents. We have gathered the main things worth keeping in mind before starting.

Key takeaways

  • Phase configuration by input: 220 V — for an apartment and a typical house, 380 V — where a powerful load such as an electric boiler or machine tools operates.
  • Application and acceptance: installation without contacting the power supply organization leads to a recalculation for unmetered consumption according to the standard.
  • Multi-tariff metering: the device pays for itself only with a significant share of night-time consumption — laundry, boiler, electric car charging at night.
  • Cable and diagram: the cross-section of the incoming wire and the "phase-neutral" order affect the operation of the protection no less than the model of the device.
  • Warranty and authorization: a warranty period for installation only makes sense together with the master's authorization and the possibility of an in-person visit for a warranty case.
  • Check after installation: a test run under load and comparison of readings with a reference device reveal an error before sealing, not after.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
9 окт. 2026
Installed the electric meter quickly and neatly, everything works great. 2-year warranty, very satisfied!
ЕС
Елена С.
23 сен. 2026
I ordered electricity meter installation, the technician arrived the same day. The cost is calculated after diagnostics, but I was satisfied.
ШМ
Шухрат М.
22 сен. 2026
Professionally installed the meter, took all wishes into account. The price depends on the scope of work, but the result is excellent.
ОВ
Ольга В.
17 сен. 2026
The electric meter installation went smoothly, the master explained everything. 2-year warranty, I recommend!
БТ
Бекзод Т.
10 сен. 2026
They installed the meter quickly and with high quality, no problems at all. The cost is calculated after diagnostics, but it's worth it.
ИП
Ирина П.
6 сен. 2026
Ordered electric meter installation, they arrived on time, did everything neatly. Pleased with the result!
ДЛ
Дмитрий Л.
1 сен. 2026
They installed the meter in a couple of hours, the work was clean. The price depends on the scope of work, but the quality is top-notch.
НА
Наргиза А.
29 авг. 2026
The technician installed the electricity meter, checked and showed everything. 2-year warranty, I feel at ease.
ТР
Тимур Р.
25 авг. 2026
Excellent meter installation, quickly and without unnecessary questions. The cost is calculated after diagnostics, but the result is pleasing.
СК
Светлана К.
18 авг. 2026
The electric meter installation went excellently, the master is polite. The price depends on the scope of work, but I am pleased.
РШ
Рустам Ш.
15 авг. 2026
I ordered meter installation, they did everything with high quality and quickly. 2-year warranty, I recommend it!
АМ
Анна М.
30 июл. 2026
They installed the electricity meter neatly, without damage. The cost is calculated after diagnostics, but the service is excellent.
ФН
Фарход Н.
25 июл. 2026
Professional meter installation, all nuances were taken into account. The price depends on the scope of work, but I'm satisfied.
МБ
Марина Б.
12 июл. 2026
Ordered electric meter installation, the master arrived quickly. 2-year warranty, everything is super!
АС
Алишер С.
10 июл. 2026
The meter installation went without problems, the master configured everything. The cost is calculated after diagnostics, but the result is excellent.
ТГ
Татьяна Г.
6 июл. 2026
They installed the electricity meter with high quality, I was satisfied. The price depends on the scope of work, but it's worth it.
ЕР
Елена Р.
25 июн. 2026
Excellent service! Electric meter installation was completed on time, without unnecessary questions.
СП
Светлана П.
29 мая 2026
Applied for electric meter installation, they did it quickly and with quality. I recommend.
ДС
Дамир С.
26 мая 2026
Called a master for electric meter installation — he arrived the same day, everything works.
ДС
Дамир С.
24 мая 2026
Applied for electric meter installation, they did it quickly and with quality. I recommend.
РД
Руслан Д.
19 мая 2026
They completed the electricity meter installation faster than promised. Pleasantly surprised.
МА
Марат А.
15 мая 2026
Thank you for the electric meter installation! The price is fair, the result is excellent.
СШ
Сергей Ш.
30 апр. 2026
Reasonable prices for electric meter installation, no markups. Everything is fair.
ИГ
Ирина Г.
21 апр. 2026
Very polite master, explained everything about electric meter installation. I recommend to friends.
ИГ
Ирина Г.
10 апр. 2026
Ordered electric meter installation — they arrived on time, did everything neatly. Pleased!
ЖК
Жанна К.
3 апр. 2026
Reasonable prices for electric meter installation, no markups. Everything is fair.
АФ
Анна Ф.
29 мар. 2026
Good work, the masters know their craft. Electric meter installation was done conscientiously.
ГС
Гульнара С.
17 мар. 2026
Good work, the masters know their craft. Electric meter installation was done conscientiously.
СШ
Сергей Ш.
2 мар. 2026
Quality electric meter installation, neat and without unnecessary mess. I will come back again.
ЖК
Жанна К.
28 фев. 2026
I contacted them for electricity meter installation, they did it quickly and with high quality. I recommend them.
ИГ
Ирина Г.
26 фев. 2026
Excellent service! The electricity meter installation was completed on time, without unnecessary questions.
ДС
Дамир С.
15 фев. 2026
Thank you for the electric meter installation! The price is fair, the result is excellent.
АТ
Алмас Т.
4 фев. 2026
They did the electric meter installation faster than promised. Pleasantly surprised.
СШ
Сергей Ш.
3 фев. 2026
Called a master for electric meter installation — he arrived the same day, everything works.
АФ
Анна Ф.
21 янв. 2026
Very polite master, explained everything about electric meter installation. I recommend to friends.
АФ
Анна Ф.
18 янв. 2026
Excellent service! Electric meter installation was completed on time, without unnecessary questions.
ЖК
Жанна К.
16 янв. 2026
Quality electric meter installation, neat and without unnecessary mess. I will come back again.
ДС
Дамир С.
4 янв. 2026
They did the electric meter installation faster than promised. Pleasantly surprised.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about electricity meter installation

Answers to the most popular questions from our clients

Installation of a single-phase electricity meter starts from 149,000 soum, a three-phase one from 349,000 soum, and a typical bill for the service is 249,000 soum. The master gives the exact amount after inspection, because it depends on the type of meter and the condition of the panel.
A standard electricity meter installation takes 1–2 hours if the panel and wiring are in normal condition. Turnkey installation of a three-phase metering unit or work involving a complete panel replacement can take up to half a day.
We provide a 2-year warranty for electricity meter installation, including the quality of connections and the operation of the counting mechanism. If problems arise during this period due to our fault, the master will come and fix them free of charge.
Yes, electricity meter installation is performed on-site; diagnostics and the visit are free if you agree to the repair. The master arrives with his own tools and consumables; you only need to provide access to the panel.
To install an electricity meter, it is advisable to have the device's passport and documents for the property, but the technician can start work without them. If the meter is new, check for seals and factory markings.
Yes, moving an electricity meter costs from 249,000 soum, and moving the metering unit with cable rerouting costs from 749,000 soum. Before work, the technician assesses the length of the new cable and the installation location.
The choice depends on the incoming cable and the load: a single-phase meter is suitable for an ordinary apartment, while a three-phase one is for a house with powerful appliances. Installing a three-phase electricity meter costs from 349,000 soum, and turnkey installation of a three-phase metering unit costs from 949,000 soum.
We replace old electricity meters from 199,000 soum, including dismantling and connecting the new device. If the panel is worn out, installation of a meter with complete panel replacement may be required — from 649,000 soum.
Not always: if the cable can withstand the load, it is enough to install the incoming cable to the meter — from 279,000 soum. If the wiring is worn out, the technician will suggest laying a cable to the meter — from 319,000 soum.
Diagnostics and a site visit are free if you agree to the repair: the technician checks the meter's connection scheme — from 139,000 soum if a separate check is needed. After the inspection, he provides the exact list of works and the cost.
Yes, setting up a multi-tariff meter costs from 259,000 soum; the technician will configure the tariff zones and check the operation of the counting mechanism. Checking the operation of the counting mechanism costs from 135,000 soum.
Payment is made after the work is completed and a test run after installation — from 129,000 soum. We accept cash and transfers in soum, and we issue a receipt or payment slip on site.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на