Ремонт техники Специалисты Строительство и ремонт Другое Страны

Electrical wiring specialist in Tashkent

Install electrical wiring in a house in Tashkent

Estimate before work begins, we chase walls without dust in living rooms, 2-year warranty on hidden lines and the panel.

12 years of experience
500+ projects
Arrival within 2 hours
Examples of work — electrical wiring in the house
Dilshod Umarov
Specialist
4.9
Types of services

Our wiring work in an apartment in Tashkent

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Marking the route for wiring
Marking lines for sockets, switches and light fixtures taking into account the layout and load on each group
Дверная москитная сетка
Chasing walls for cable
Chasing concrete and brick for power and lighting cable, depth and width according to the wire cross-section
Сетка Плиссе
Chasing the ceiling for cable
Cutting grooves in the floor slab to run cable down to chandeliers and light fixtures without damaging load-bearing beams
Антикошка PetScreen
Drilling through holes
Running cable through walls and floor slabs with a drill, with neat edges for a sleeve or sealant
Антипыль Micro Mesh
Installation of socket boxes
Setting socket boxes with a socket box crown in concrete and drywall, leveling them in one plane
Нестандартная москитная сетка
Installation of junction boxes
Installation of junction boxes in walls and ceiling with a wire reserve for soldering and terminals
Раздвижная москитная сетка
Open cable laying
Fastening cable along walls and ceiling with staples and clips when chasing is impossible or unnecessary
Магнитная рамка
Hidden cable laying
Laying cable in a groove with subsequent sealing and plastering, hidden wiring for final finishing
Сетка-штора на магнитах
Laying cable in corrugated conduit
Running cable into a corrugated pipe for protection from moisture and mechanical damage in walls and screed
Pricing

Prices for electrical work in a house in Tashkent

Service type Description Price Warranty
Marking the route for wiring Walls, ceilings, floors от 49 900 сум 2 years
Wall chasing for cable Concrete, brick, depth от 84 900 сум 2 years
Ceiling chasing for cable Dust removal, neatly от 94 900 сум 2 years
Drilling through holes Inter-floor slabs, walls от 69 900 сум 2 years
Installation of back boxes Concrete, drywall, brick от 59 900 сум 2 years
Installation of junction boxes Concealed and open wiring от 54 900 сум 2 years
Open cable routing Cable channel, staples, clips от 50 500 сум 2 years
Concealed cable routing In a chase, under plaster от 74 900 сум 2 years
Laying cable in corrugated conduit On ceiling, walls от 64 900 сум 2 years
Laying cable in a metal conduit Fire-hazard zones от 89 900 сум 2 years
Pulling cable through conduits Ready routes, cable pulling от 79 900 сум 2 years
Installation of cable trays Main lines от 119 000 сум 2 years
Assembly of the distribution board Modular, wall-mounted от 249 000 сум 2 years
Installation of the main circuit breaker Single-phase, three-phase от 99 000 сум 2 years
Installation of circuit breakers on lines Group, modular от 70 500 сум 2 years
Installation of RCDs and RCBOs Leakage protection, groups от 109 000 сум 2 years
Connecting a voltage relay Protection against surges от 85 500 сум 2 years
Installation of contactors and relays Load management от 105 000 сум 2 years
Installation of a concealed socket Back box, connection от 60 500 сум 2 years
Installation of an outdoor socket Open wiring от 55 500 сум 2 years
Installation of a grounded socket Three-wire circuit от 65 500 сум 2 years
Installation of a single-gang switch Concealed, external от 50 900 сум 2 years
Installation of a multi-gang switch Two-gang, three-gang от 70 900 сум 2 years
Installation of two-way switches Two-point control от 90 500 сум 2 years
Ceiling chandelier installation Assembly, connection от 95 500 сум 2 years
Installation of spotlights Drywall, stretch ceiling от 75 500 сум 2 years
Installation of track systems Busbars, adapters, lamps от 149 000 сум 2 years
Installation of LED strip Power supply, profile от 85 900 сум 2 years
Connecting sconces and wall lights Walls, lounge areas от 71 500 сум 2 years
Installation of outdoor lighting Facade, yard, entrance от 129 000 сум 2 years
Connecting an electric stove Separate line, terminals от 125 000 сум 2 years
Connecting a cooktop Powerful line, circuit breaker от 135 000 сум 2 years
Connecting an oven Separate group от 115 000 сум 2 years
Connecting a washing machine Socket, grounding от 90 900 сум 2 years
Connecting a water heater Boiler, separate line от 139 000 сум 2 years
Connecting an air conditioner Line, circuit breaker, socket от 145 000 сум 2 years
Laying internet cable Twisted pair, connectors от 60 900 сум 2 years
Installation of television cable Antenna, wiring от 65 900 сум 2 years
Installation of intercom and call system Handset, button, unit от 99 500 сум 2 years
Video surveillance installation Cameras, recorder, cable от 199 000 сум 2 years
Laying a telephone line Sockets, wiring от 49 900 сум 2 years
Installation of a grounding loop Pins, strip, welding от 249 000 сум 2 years
Lightning rod connection Mast, down conductor, clamps от 299 000 сум 2 years
Installation of the equipotential bonding system Busbars, conductors от 199 000 сум 2 years
Insulation resistance check Devices, protocol от 99 000 сум 2 years
Finding and fixing a break Route, connections от 149 000 сум 2 years
Line continuity testing and marking Panel, groups, diagram от 119 000 сум 2 years
Checking the operation of circuit breakers Under load, tests от 79 900 сум 2 years
RCD testing Button, device, time от 69 900 сум 2 years
Measuring voltage in the network Points, panel, sockets от 59 900 сум 2 years
Comprehensive electrical commissioning House, apartment, facility от 599 000 сум 2 years
Why Us

Our advantages in electrical work in a house

12 years of experience at sites in Tashkent

More than 500 completed projects in private houses and new buildings, we know the norms and specifics of local networks

Site visit within 2 hours across the city

The engineer arrives with tools and diagnostic equipment, measures the load and condition of the incoming cable on site

Estimate within 1 day after inspection

We calculate based on actuals: number of points, length of routes, circuit breakers and RCDs — no hidden extra charges during the process

3 stages of work acceptance

Rough wiring, panel assembly, final resistance measurements — each stage is documented with a report

2-year warranty on installation

Written warranty on cable lines, panels and connections, warranty visit within 24 hours

10% discount for a volume of 50+ points

We fix the discount in the contract before work begins, it is not cancelled if deadlines change

Panel design and diagram as a gift

We prepare a single-line diagram and group labeling so you understand which breaker is responsible for what

Only certified cable

We use cable with copper conductors according to GOST, we check the cross-section with a micrometer before installation

Process

Order stages

01

Inspection and measurements

We arrive at the site, study the layout, calculate the load and connection points. We record your wishes for sockets and lighting.

02

Diagram and design

We prepare the panel and route diagram, agree on the location of groups. We take into account future appliances and power reserve.

03

Chases and routes

We mark the walls, chase for the cable, drill passages. We work carefully, with dust extraction and surface protection.

04

Cable installation

We lay the cable along the routes, install back boxes and junction units. We observe cross-sections and insulation rules.

05

Panel assembly

We assemble the electrical panel, install circuit breakers, RCDs and relays. We label the groups, check contacts under load.

06

Testing and handover

We test the lines, measure resistance and phasing. We clean up after ourselves, hand over the diagram and a 2-year warranty.

Team

Our specialists in electrical work in a house

Абдуллаев Шухрат

Abdullaev Shukhrat

Electrical installer

18 years of experience
189 reviews 4.7
Юлдашев Дилшод

Yuldashev Dilshod

Electricity metering specialist

13 years of experience
69 reviews 5.0
Смирнова Елена

Smirnova Elena

Service center administrator

8 years of experience
207 reviews 4.9
Рахимов Фарход

Rakhimov Farkhod

Power engineer

8 years of experience
202 reviews 4.9
Каримов Бахтиёр

Karimov Bakhtiyor

Meter replacement technician

15 years of experience
194 reviews 4.9
Кузнецова Ольга

Kuznetsova Olga

On-site service coordinator

5 years of experience
173 reviews 4.9
Тошматов Санжар

Toshmatov Sanzhar

Electrical technician

15 years of experience
100 reviews 4.9
Мирзаев Азиз

Mirzaev Aziz

Customer service manager

10 years of experience
158 reviews 4.7
Cases

Cases of electrical work in a house

Установка рамочной сетки
Marking the route for wiring in a new building
49,900 sum
2 year warranty
Problem
The client received an apartment without electrical wiring and did not know where to start the wiring.
Diagnostics
The inspection showed the absence of a design scheme and the need for precise marking for future lines.
Solution
Marking of the route for wiring was carried out taking into account the placement of furniture and appliances.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.9
Установка дверной сетки
Chasing walls for cable in a panel building
84,900 sum
2 year warranty
Problem
For hidden wiring, channels in concrete walls were required.
Diagnostics
The walls are panel, reinforced, so grooving with depth control was required.
Solution
Wall grooving for cable was completed, followed by cleaning of the channels.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
4.8
Установка сетки Антикошка
Grooving the ceiling for lighting cable
94,900 sum
2 year warranty
Problem
The client wanted hidden wiring to the light fixtures without a stretch ceiling.
Diagnostics
The floor slab allowed laying the cable in a groove up to 20 mm deep.
Solution
Ceiling grooving for cable was completed with outlet points for the light fixtures.
Смирнова Елена
Smirnova Elena
Service center administrator
4.9
Нестандартная сетка
Drilling through holes between floors
69,900 sum
2 year warranty
Problem
It was necessary to run the cable from the first floor to the second in a private house.
Diagnostics
The floor slab was monolithic, so a neat through hole was required without damaging the reinforcement.
Solution
A through hole was drilled with the installation of a sleeve to protect the cable.
Рахимов Фарход
Rakhimov Farkhod
Power engineer
4.7
Раздвижные сетки
Installation of back boxes for sockets and switches
59,900 sum
2 year warranty
Problem
After grooving, it was necessary to install back boxes for all points.
Diagnostics
The depth and diameter of the holes were checked, and back boxes for concrete were selected.
Solution
Back boxes were installed, leveled and fixed with mortar.
Каримов Бахтиёр
Karimov Bakhtiyor
Meter replacement technician
5.0
Сетка Антипыль
Installation of junction boxes on the floor
54,900 sum
2 year warranty
Problem
It was required to connect the lighting and socket lines into a single circuit.
Diagnostics
The installation locations of the boxes were determined taking into account ease of maintenance.
Solution
Junction boxes were installed with all wiring groups brought out.
Кузнецова Ольга
Kuznetsova Olga
On-site service coordinator
4.9
Перетяжка полотна
Laying cable in a hidden way in an apartment
74,900 sum
2 year warranty
Problem
The client wanted fully hidden wiring without visible cable ducts.
Diagnostics
The grooves and back boxes were checked, and a laying scheme by groups was drawn up.
Solution
The cable was laid in a hidden way with fixation and the ends brought out into the boxes.
Абдуллаев Шухрат
Abdullaev Shukhrat
Electrical installer
4.8
Сетка Плиссе
Assembling a distribution board for a house
249,000 sum
2 year warranty
Problem
The old board could not accommodate all the lines and did not protect against overloads.
Diagnostics
A shortage of modules and the absence of protection for individual groups were identified.
Solution
A new distribution board was assembled with group labeling and connection of the lines.
Юлдашев Дилшод
Yuldashev Dilshod
Electricity metering specialist
5.0

Do electrical work in a house in Tashkent: full cycle of work from Eco-Service with a 2-year warranty

How the full cycle of electrical installation in a house works

Electrical installation is a sequence of six to seven stages, where each subsequent one builds on the previous. Let's break down what happens on site from the first marking line to connecting the lines in the panel.

Where electrical installation begins: route marking and design

Eco-Service begins work with marking the route for the wiring — we apply lines of future cable routes to the walls and ceiling strictly according to the wiring diagram tied to the room plan. The diagram takes into account the requirements of the Electrical Installation Code (PUE), the placement of furniture, equipment connection points, and the installation height of sockets and switches. On sites in Tashkent, we first walk through the rooms with a laser level, mark the axes for chases, the locations for mounting boxes and junction boxes, and only after coordinating the lines with the client do we start up the tools. Without a wiring design at the marking stage, it's easy to run a cable into a zone where a cabinet or kitchen unit will later stand — redoing it will cost more than the marking itself. If you want to install new wiring in an apartment, route marking becomes the first step where the real scope of work becomes visible.

Chasing walls and ceiling: when it's needed and what it's done with

We perform wall chasing for cable with a wall chaser with dust extraction, and ceiling chasing — only where the line runs concealed and doesn't affect load-bearing structures. The depth of the groove for a standard 3×2.5 mm² cable is 25-30 mm, the width — for one or two cables with allowance for plaster. In panel buildings in Tashkent, horizontal chases in load-bearing walls are prohibited — we run the route vertically, and make transitions between walls through the ceiling or floor. In brick and monolithic buildings in Samarkand and Bukhara, horizontal sections are permissible, but no longer than a third of the wall and no deeper than 30 mm. Before chasing, clarify the wall material and the year of construction: in old housing stock with hollow brick, the wall chaser pulls the groove off to the side, and it has to be redone. It is at this stage that the electrical wiring layout in the house becomes clear — how many chases, of what depth, and along which walls.

Cable routing: open method, concealed, in corrugated conduit and flexible metal conduit

We route cable in an open manner along trays and clips, concealed — in chases under plaster, and in corrugated conduit and flexible metal conduit — where additional protection from mechanical damage is needed. Open routing along cable trays runs through technical rooms, basements and attics, concealed — through living rooms, where a smooth wall surface matters. PVC corrugated conduit with a diameter of 16-20 mm protects the line from abrasion in the screed and under drywall, flexible metal conduit — from sharp edges and rodents. Flexible metal conduit is mandatory for lines in wooden structures and on evacuation routes — corrugated conduit there does not provide the required fire-resistance rating. Clients often describe this task in their own words — electrical wiring throughout the apartment — and both the labor costs and the completion deadline of the site depend on the routing method. Many start the conversation with the question of how much it costs to install wiring in an apartment, and based on the answer they decide which routing method to choose for their budget.

Assembling the distribution panel and connecting the lines

Eco-Service assembles the distribution panel with a full set of protection — from the main incoming module to contactors for heavy loads.

  • Main incoming circuit breaker: protects the entire apartment, its rating is selected according to the allocated power and the cross-section of the incoming cable.
  • Line circuit breakers: separate modules for socket groups, lighting, kitchen and boiler — one line per group.
  • RCDs and RCBOs: installed for wet zones, the washing machine, boiler and outdoor sockets, with a setting of 10-30 mA.
  • Voltage relay: cuts off power during surges in the network — a common cause of refrigerators and air conditioners failing.
  • Contactors and relays: needed for controlling heavy loads and automatic switching to a generator.
  • Line marking: each group is labeled right on the panel — a year later, when adding a new socket, the electrician won't have to ring out the whole house to find the right circuit breaker.

Clients often ask how much it costs to install electricity in an apartment turnkey, and also how much it costs to install electrical wiring in an apartment — the final figure depends on the number of circuits, the footage of chases, and the class of protective devices. Another reference point — to install wiring in an apartment, the price is made up of labor and materials, and installing electrical wiring in a house as a whole is cheaper at the rough finishing stage. It is more convenient to buy materials through Uzum Market, Texnomart or Mediapark, and pay for the work through Click, Payme or Uzum Bank.

Electrical routing: along the floor, along the ceiling, and in different types of apartments

The routing scheme depends on the type of floor slabs, the presence of a screed, and the number of floors. Let's break down how electrical routing in an apartment is done along the floor and along the ceiling and how one-room apartments, new buildings, and private houses differ.

Electrical routing in an apartment along the floor

Electrical routing in an apartment along the floor is done in the screed or in cable channels under the finish flooring — this is convenient when the walls are load-bearing and cannot be chased. In panel buildings in Tashkent of series 1-464 and 1-335, horizontal chases in load-bearing panels are prohibited, so the route is run along the floor slab: VVGng 3×2.5 cable in 20 mm diameter PVC corrugated conduit is laid in a screed at least 40 mm thick, and under laminate and parquet — in a cable channel. Along the floor, lines are run to island outlets in the kitchen, to the underfloor heating in the bathroom, and to the outlet block under the desk. Under the screed, cable is laid only in corrugated conduit or pipe — if VVGng is poured directly into concrete, during repairs the line will have to be opened up together with the floor.

Electrical routing in an apartment along the ceiling

Electrical routing in an apartment along the ceiling runs in the above-ceiling space under a stretch or drywall ceiling — this is the fastest way to install electrical wiring in a house without chasing walls. Under the stretch fabric, the cable is fastened to the base ceiling with clips at a spacing of 40-50 cm, run in PVC corrugated conduit or in flexible metal conduit, and junction boxes are placed on the lighting circuits. 50×50 mm cable trays are convenient in corridors with a drywall ceiling: both power groups and low-voltage lines — internet and television cable — are run in them. Back boxes and switches are mounted in the walls, and only lighting and ventilation lines are brought up to the ceiling. Under a stretch ceiling, the cable must be fastened to the base ceiling with clips — if it is left lying on the fabric, the insulation can easily be damaged during installation of the light fixtures.

Electrical routing in a one-room apartment and in a room

  • Lighting group: one 10 A breaker feeds the light in the room, corridor, bathroom, and balcony — if a line breaks, the whole apartment does not go dark.
  • Room outlet group: a 16 A breaker and VVGng 3×2.5 cable for 6-8 outlets — power reserve for a TV, computer, and chargers.
  • Kitchen line: a separate 16-25 A breaker for an induction cooktop, microwave, and kettle — the most loaded group in a one-room apartment.
  • Bathroom: a line through a 10 mA RCD for the washing machine and water heater, outlets only moisture-proof IP44.
  • Air conditioner and balcony: a separate 16 A line for the split system; in a studio, electrical routing in the room comes down to a single junction box.

Electrical routing in a new building: from scratch

Electrical routing in a new building is done from scratch: the developer usually leaves only the incoming cable and the panel, and all groups are designed and installed to suit the residents' layout. In Tashkent residential complexes, at the rough finishing stage, VVGng-LS cable is laid for each future zone: air conditioners in the bedrooms and living room, underfloor heating in the bathroom, water heater, dishwasher, separate lines for kitchen appliances. The panel is assembled with 12-18 modules: incoming breaker, voltage relay, RCD for wet groups, breakers for outlets and light. In search, clients most often type "install electrical wiring in an apartment price" — and for this query we explain what the estimate is made up of: the footage of the route, the number of groups, the depth of chasing, and the type of cable. The routing scheme is coordinated with the layout before chasing — after finish finishing, moving an outlet for the TV or a block in the kitchen is no longer possible without opening up the tiles. In new buildings in Tashkent, before finish finishing it is cheaper to immediately lay cable for air conditioners and underfloor heating — after renovation this will already require opening up the walls.

Electrical routing in a private house and throughout the house

Electrical wiring in a private house differs in its service entrance: the cable runs from a pole or from an outdoor panel, and inside the house the lines are distributed into groups with mandatory grounding. The service entrance with 4×16 SIP cable from the support pole goes to an outdoor panel with a main circuit breaker and meter, then 3×6 or 3×10 VVGng cable runs through the house to the internal distribution panel. Grounding is done with a loop of three rods, 2.5-3 m each, connected by a 40×4 mm strip, and routed to the PE bus; wet areas get a 10-30 mA RCD. In a private house, a voltage relay is mandatory — during voltage sags on the outdoor line, it disconnects the service entrance and saves appliances from surges.

Cable, circuit breakers and protection: what to choose for a home

Whether the line can withstand the load and whether the protection will trip in an emergency depends on the cable cross-section and the rating of the circuit breaker. Let's break down the selection by groups and the protective devices.

Which cable to use for wiring in an apartment

Group Cable type Cross-section
Lighting VVGng 3×1.5 mm²
Sockets VVGng 3×2.5 mm²
Service entrance and electric stove VVGng 3×6 mm²
Water heater, air conditioner VVGng 3×4 mm²

For wiring in an apartment we use VVGng cable: 3×2.5 mm² for socket groups, 3×1.5 mm² for lighting, and 3×6 mm² for the service entrance and stove. A standard two-room apartment uses 80-120 m across all groups, so the question "how much does it cost to install electrical wiring in a house" begins precisely with calculating the meterage. Aluminum wire is cheaper, but in junction boxes it cannot be connected directly to copper: such a twist heats up and oxidizes within a few months. At Eco-Service, VVGng cable is laid out by groups with the meterage calculated for the specific floor plan.

How to choose a circuit breaker for an apartment and what an RCD is

The circuit breaker is selected according to the cable cross-section and the load of the group, while an RCD is installed on wet areas and socket groups — it disconnects the line when there is a current leakage. For a socket group with 2.5 mm² cable, a 16 A breaker is suitable; for lighting with 1.5 mm² — 10 A; for the service entrance and stove with 6 mm² — 32-40 A. An RCD with a 30 mA setting protects a person from electric shock, while 100-300 mA ones are installed at the service entrance for fire protection. An RCD without a breaker does not protect against short circuits, and a breaker without an RCD does not protect against leakage through damaged insulation; for the sockets in a bathroom and kitchen, an RCBO is installed, which combines both functions. If a voltage relay is not installed at the service entrance, a surge in the grid will burn out all household appliances at once — in Tashkent high-rise buildings this happens during switching at the substation. Eco-Service specialists install RCDs and RCBOs on wet areas with the setting verified for each line.

Load calculation and selection of protective devices

  • Summing up power: for each group we add up the power of all appliances — kitchen sockets, water heater, washing machine, lighting.
  • 20-30% reserve: to the resulting figure we add a margin so that the line operates without overheating when everything is switched on at once.
  • Rating matched to the cable: the breaker is selected so that it trips before the wire heats up.
  • Service entrance check: the total load of all groups is compared with the allocated power for the apartment.
  • Voltage relay: a device is installed at the service entrance that cuts off the power when parameters go beyond the permissible range.

We calculate the load for each group: we sum up the power of the appliances, add a 20-30% reserve, and select the breaker rating to match the cable cross-section. If the breaker rating is higher than the cable can withstand, then during an overload the wiring will burn out rather than the protection tripping — that is why the breaker is always "weaker" than the cable, not the other way around. Clients often ask "how much does it cost to do the electrics in an apartment" even before they have settled on a floor plan — and there is only one correct answer here: first we calculate the groups and the meterage, then we quote a figure. In the search bar, the query do electrics in an apartment price comes up constantly, but without a project and a group diagram any figure will be approximate. Eco-Service calculates the load and selects the breakers before the chasing begins, so that the routes do not have to be redone after installation.

Electrical installation in a private house and new building: specifics

A private house and a new building require a separate approach to the service entrance and backup power. Let's go over the connection from the pole, grounding, surge protection and the generator.

Electrical connection in an apartment and the service entrance in a private house

The electrical connection in an apartment runs from the existing service cable, while in a private house we install the service entrance from the pole: an overhead line, an outdoor panel and a grounding loop. For the overhead line we take a self-supporting insulated wire with a cross-section of 16 mm² with four conductors, fasten it to the facade with anchor clamps, and cover the drop into the house with a metal flexible conduit. At the service entrance we install a two-pole circuit breaker and a voltage relay, followed by a distribution board on a DIN rail. The wiring throughout the house is built from this board in separate lines to the kitchen, the boiler and each room. Documents for the plot and the technical specifications from the power supply organization are needed before work begins — without them the connection from the pole will not be approved, and unauthorized connection risks disconnection and a fine. Before installation, check the allocated power in the technical specifications against the sum of the circuit breaker ratings — a discrepancy of 20-30% forces you to redo the entire service entrance unit.

Grounding and protection against voltage surges

A grounding loop and a voltage relay at the service entrance are the basic protection of a private house: the relay cuts the power when it goes beyond permissible limits and saves your equipment. We make the loop from three vertical rods 3 meters long, connected by a 40×4 mm strip, with a resistance no higher than 4 Ohms for a 380 V network. We set the voltage relay to disconnect at 260 V and reconnect at 220 V — in the Tashkent network, evening sags down to 190 V and surges up to 250 V occur regularly. We install RCDs and RCBOs in wet zones — the bathroom, kitchen, boiler room — with a leakage current of 30 mA; contactors and relays control the boiler and pump on a schedule. In buildings of the old housing stock there is often no grounding conductor in the riser — in that case the loop is made separately, and RCDs are installed only after checking the resistance. Measure the resistance of the loop before connecting the protective devices: if it is above the norm, the RCD will trip falsely.

Generator for the house: when it is needed and how to connect it

A generator for the house is connected through an ATS or a manual changeover switch — it powers the service entrance when the grid goes down and prevents current from flowing back into the city line. For a house of 10-15 kW, a gasoline or diesel generator of 8-12 kW is sufficient, with a 20-30% margin for the starting currents of the pump and refrigerator. We install the generator's input circuit breaker separately from the grid one, and switch the neutral conductor together with the phase — otherwise part of the load will remain on the grid. Clients often phrase the request as: run the electrical wiring in the apartment — and confuse backup power for the house with ordinary wiring through the rooms, although these are different units. Without a changeover switch, the generator will be under grid voltage when turned on — this is dangerous for the crews working on the line and for the equipment itself. Check that the generator's power covers the simultaneous start of the pump and the boiler — otherwise the ATS will trip on every startup.

Documents, timelines and cost of electrical installation in the house

Clients often ask how much it costs to run the electrics in a house, and the cost of electrical installation in a private house depends on the area, the number of lines and the method of laying — we calculate the exact estimate after a visit to the site. How much it costs to do the electrics in a house is determined by the meterage of wall chasing, the number of back boxes and points, the length of the route from the pole and the complexity of the grounding loop. Another frequent request is run the wiring in the house price: it is made up of the same parameters plus the cost of materials, if we take care of the purchase ourselves. Wiring the electrics through the house over an area of 120-150 m² takes from 7 to 12 working days with two technicians: two days for marking and wall chasing, three to four for laying, a day for the board and connection. Wiring in a house made of timber or a frame house is done in an open way in a corrugated conduit or cable duct — you cannot chase load-bearing walls. Wiring through the house in a new building starts before the finishing work: while the walls are bare, the route is laid in the chases and plastered over. Order the marking of the route before buying the cable — that way you definitely won't buy extra meters and won't make a mistake with the cross-section.

How work with Eco-Service proceeds: stages, timelines, warranty

Work is carried out under a contract: a site visit, an estimate by types of operations, installation by our own crew, acceptance according to a checklist. Below is how each stage is structured and what is documented in writing.

Electrician's site visit and assessment of the property

During the visit, an Eco-Service electrician inspects the property, checks the incoming supply and the condition of the existing wiring, and then draws up an estimate by types of work. The engineer records the wall material — brick, drywall, monolithic — and the thickness of the slab: this determines the method of chasing and the choice of fasteners. Separately, they check the condition of the main circuit breaker and the meter, the presence of a grounding loop, and count the future circuits: socket, lighting, lines for kitchen appliances and air conditioners. Clients often phrase the task like this: electrical wiring in a private house price — and during the visit the technician immediately explains what the estimate consists of and which operations it includes. If the house has old aluminum wiring, a partial replacement gives no result — new copper lines in the same chases will have to be connected to aluminum, and that is a weak point.

Electrical installation timelines and acceptance of work

  • One-room apartment: doing the electrical work in an apartment up to 40 m² takes 3-4 working days with 6-8 circuits.
  • Two- and three-room: 5-7 days if chasing and cable routing proceed in parallel in different rooms.
  • Private house: the timeline is calculated by floors and route length, usually 7-10 days including the incoming supply and grounding.
  • Acceptance: we check the operation of every socket and switch, insulation resistance, and the tripping of RCDs and RCBOs via the test button.
  • Report: we record the measurement results and the list of lines in writing, so that in case of disputes there is something to confirm quality with.

2-year warranty and service center in Tashkent

Eco-Service provides a 2-year warranty on electrical installation work, and its own service center in Tashkent handles warranty claims in person. The center processes claims regarding panels, circuit breakers and lines — most often this is tightening terminals after seasonal voltage fluctuations in the Tashkent grid. The warranty covers installation: the quality of chasing, connections, panel assembly, connection of sockets and switches. Materials purchased by the customer independently are not covered by the warranty — if the cable does not match the cross-section or the breaker is selected incorrectly, responsibility for the line remains with the owner. That is why at the estimate stage we suggest selecting the cable and protection ourselves — it is easier that way to be responsible for the result as a whole.

Payment and order processing

  • Contract: we draw up a written contract with a list of types of work, timelines and warranty obligations.
  • Advance payment: the first part — for purchasing materials and starting chasing, the second — after acceptance of the completed lines.
  • Payment methods: we accept via Click, Payme, Uzcard and Humo — in cash or by card, at the customer's choice.
  • Documents: we issue the certificate of completed work and the warranty card in hand after handover of the property.
  • Request: if wiring in an apartment is planned before finishing work, the request is placed in advance — the crew arrives within 1-2 days after the estimate is approved.
  • Scope: the advance for materials is calculated based on the actual cable footage and number of points, and wiring an entire house can be done in stages — by rooms or by floors.

How to avoid typical mistakes in electrical installation

Most electrical problems in a home are the result of violations of the Electrical Installation Code (PUE) and cutting corners during installation. Let's look at what is most often done incorrectly and how to fix it before an accident occurs.

Why copper and aluminum must not be twisted together

A direct twist of copper and aluminum in a junction box oxidizes and heats up — this is one of the most common causes of fires in old wiring. When two dissimilar metals come into contact, electrochemical corrosion occurs: aluminum degrades faster, contact resistance increases, and under a load of 16 A and above, the connection point heats up to 90-120 °C. The PUE explicitly prohibits direct twisting of copper and aluminum without an intermediate element. At sites in Tashkent and Samarkand, we most often encounter this mistake in older buildings, where aluminum risers were connected to VVGng copper cable during planned wiring replacement. Dissimilar metals may only be connected through terminal blocks or a bolted connection with a washer — then the contact is not destroyed by electrochemical corrosion and lasts for decades. Clients often ask how much it costs to install wiring in a house before they even learn that such twisting is unacceptable — and that is the right order: calculation first, then installation.

What "proper" wiring distribution in an apartment means

  • Separate groups: lighting, sockets, kitchen and bathroom run on their own lines, each with its own circuit breaker on the line.
  • Protection on each group: wet zones — bathroom, kitchen, washing machine — are connected through RCDs and RCBOs with a leakage current of 30 mA.
  • Accessible connections: all joints are made only in junction boxes that are accessible for inspection.
  • Cross-section matched to load: socket groups use 3×2.5 mm² cable, lighting uses 3×1.5 mm², and the apartment's incoming supply is calculated separately.
  • No connections in the wall: not a single twist is left walled up in a chase outside a box.

Can wiring in an apartment be done with your own hands

Doing the wiring in an apartment with your own hands is technically possible, but without experience it is difficult to correctly calculate the load, select circuit breakers and provide grounding. Self-installers make three main mistakes: an undersized cable cross-section for the actual power of the appliances, a circuit breaker chosen "by eye" without calculating the load, and the absence of working grounding, which prevents the RCD from tripping when insulation breaks down. Another typical mistake is connecting an aluminum incoming supply to copper wiring without a transition terminal block. Mistakes in electrical installation are not visible immediately — they show up during an accident, when the protection fails to trip; therefore, concealed work is best entrusted to a team with a warranty. Clients often phrase their request as "wiring in an apartment price," and there is logic in that order: first the load calculation and panel diagram, then the chasing and cable. Request a design from a designer before starting your own installation — it is cheaper than redoing finished renovations after acceptance.

Conclusion

Electrical installation relies on sequence and precision: one missed stage leads to redoing the entire line. Below are the takeaways that will be useful before starting work in an apartment or house.

Key takeaways

  • Sequence of stages: to install electrical systems in a house means going from marking the route and chasing to laying the cable and assembling the distribution panel, where each step builds on the previous one.
  • Layout for the specific property: the wiring distribution is chosen for the type of housing — along the floor or along the ceiling, separately for a new build from scratch and for a private house with an incoming supply.
  • Cable matched to load: socket groups use VVGng 3×2.5 mm², lighting uses 3×1.5 mm², and the circuit breaker rating is selected strictly according to the line's cross-section.
  • Protection in a private house: a grounding loop and a voltage relay are mandatory, and a generator is connected through a changeover switch that prevents back-feed into the grid.
  • Concealed work: it is sensible to entrust it to a team with a contract and a 2-year warranty — a mistake in a chase or a twist does not show up immediately, but at the moment of an accident.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азиз К.
2 окт. 2026
They did the electrical work in a new house in Tashkent — everything is neat, the sockets and circuit breakers work perfectly. A 2-year warranty, which is very pleasing.
ДА
Дилноза А.
30 сен. 2026
I ordered wiring in my apartment, the craftsmen arrived on time and did everything quickly. Very pleased that I entrusted the work to professionals.
СВ
Сергей В.
21 сен. 2026
They did the electrical work in a private house and took all my wishes regarding sockets into account. The cost is calculated after diagnostics, but the result is worth it.
НС
Нилуфар С.
19 сен. 2026
Finally, proper electrical work was done, the old wires were replaced with new ones. I'm happy with the work, thank you for the promptness.
БТ
Бекзод Т.
6 сен. 2026
I ordered wiring in the house, everything was done properly — the panel was assembled neatly. The 2-year warranty gives confidence.
ОМ
Ольга М.
7 июл. 2026
I had electrical work done in the kitchen and rooms, the craftsmen were polite and explained everything. The price depends on the scope of work, but I was pleased.
ШР
Шухрат Р.
28 июн. 2026
Excellent electrical work, the wires were hidden in the walls, nothing sticks out. I recommend it if you need quality and on time.
МЮ
Мадина Ю.
22 июн. 2026
I ordered electrical work in a country house; they came with their own tools and materials. Everything works, I'm at ease.
ТХ
Тимур Х.
21 июн. 2026
They did the electrical work in a two-story house and made separate lines for each floor. I'm glad I came here.
ЕП
Елена П.
12 июн. 2026
I needed electrical work done after renovation; everything was done cleanly and quickly. A 2-year warranty is a nice bonus.
ЖН
Жасур Н.
24 мая 2026
I ordered wiring in a new building, the craftsmen know their trade. The cost is calculated after diagnostics, everything is transparent.
ГФ
Гульноза Ф.
27 апр. 2026
I had electrical work done in the house, now I don't worry about the wiring. The workers were neat and cleaned up after themselves.
РШ
Рустам Ш.
7 апр. 2026
They did the electrical work from scratch, installed circuit breakers and RCDs. Everything works without complaints, thank you.
СД
Светлана Д.
5 апр. 2026
I ordered a wiring replacement; it was done in one day. The price depends on the scope of work, but the result is excellent.
ФА
Фарход А.
27 мар. 2026
They did the electrical wiring in the cottage, taking into account the power of all appliances. Pleased with the professionalism and the 2-year warranty.
ЗК
Зульфия К.
18 мар. 2026
I reached out for electrical work in a private house; everything was done with quality and inexpensively. Very satisfied, I recommend.
ЕК
Ержан К.
16 мар. 2026
Good work, the craftsmen know their trade. The electrical wiring in the house was done conscientiously.
АБ
Асхат Б.
1 мар. 2026
I contacted them for electrical wiring in the house, they did it quickly and with quality. I recommend.
ДЖ
Динара Ж.
17 фев. 2026
Reasonable prices for electrical wiring in the house, no markups. Everything is fair.
АТ
Айгерим Т.
4 фев. 2026
I reached out to have electrical work done in the house; they did it quickly and with quality. I recommend.
ЕК
Ержан К.
3 фев. 2026
Excellent service! The electrical wiring in the house was done on time, without unnecessary questions.
НБ
Нурлан Б.
25 янв. 2026
They did the electrical wiring in the house faster than promised. Pleasantly surprised.
КЕ
Канат Е.
2 янв. 2026
I ordered electrical work in the house — they arrived on time and did everything neatly. Satisfied!

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about electrical work in a house

Answers to the most popular questions from our clients

Basic work starts from 49,900 sum, and the final amount depends on the area of the house and the number of points — the master will give an exact calculation after a free diagnostics.
The work includes marking the route, grooving walls and ceiling, laying cable, installing back boxes and junction boxes, assembling the board, and connecting sockets with circuit breakers.
A small house or apartment usually takes a few days, while a large cottage with a board and dozens of points can take one to two weeks.
Yes, for all wiring work in the house we give a 2-year warranty, including the board, circuit breakers, and connected lines.
Yes, the visit and diagnostics are free if you agree to the repair — the master will inspect the house, measure the loads, and draw up an estimate on the spot.
We install copper cable of the required cross-section, circuit breakers, RCDs, and RCBOs from trusted manufacturers, as well as voltage relays to protect appliances.
Yes, in this case we lay the cable in an open way, in corrugated conduit or metal hose, or carefully groove with minimal dust and protection of the furniture.
Chasing walls for cable costs from 84,900 soum, ceilings — from 94,900 soum; we work with a construction vacuum cleaner so that dust does not spread throughout the house.
The number of points depends on the area and the number of household appliances — usually a separate line is made for each room, and powerful groups are allocated for the kitchen and the boiler.
Free up access to walls and ceilings, remove furniture and fragile items, provide the master with access to the input panel and electricity.
Payment is made in soums in cash or by transfer after the work is completed; we take an advance payment only for materials by agreement.
Call us — under a 2-year warranty, a master will come, find the cause of the overload or poor contact and fix it free of charge.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на